Skip to content
CostLocal

Paver patio cost in Yuma, AZ

Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.

Typical range (300 sq ft)
$2,850 – $5,100
Per sq ft
$9.45 – $16
before permit
Versus US midpoint
−6%
US $4,250
Rank of 300 metros
#199
1 = most expensive

A paver patio in Yuma, AZ usually costs $2,850 to $5,100 for 300 sq ft. That works out to about $9.45 to $16 per sq ft before permits. Compared with the national midpoint that is $250 less. Construction laborers earn a median of $20.80 an hour in the Yuma area, 8% below the US median of $22.66.

Estimate your paver patio cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

Mid-grade pavers, a border or curve, some regrading

Add-ons

Estimated cost for 300 sq ft in Yuma, AZ, standard level

$3,500 to $4,450

About $11.50 to $14 per sq ft before permits. Labor is about 60% of the bill.

Cost breakdown
PartLowHigh
Materials$1,350$1,550
Labor$2,100$2,650
Permits and fees$95$230
Total$3,500$4,450
Save and get a PDF report

Cost breakdown for 300 sq ft in Yuma, AZ

Part of the jobLowMidpointHighShare
Materials$1,150$1,450$1,75036%
Labor$1,650$2,350$3,05060%
Permits and fees$0$160$3204%
Total$2,850$4,000$5,100100%

Where the Yuma price comes from

The wage side of the estimate leans on construction laborers, who do 50% of the hours on a typical job. Their local median is $20.80 an hour. Add the other trades involved and the blended wage index for Yuma is 0.93 (US = 1.00), which puts labor at 60% of the total.

Materials are scaled with BEA's regional price parity for goods. Yuma is at 96.2 against 100 for the US, so a materials line of $1,500 nationally becomes $1,450 here (midpoint, 300 sq ft). Permits follow the all-items index of 92.7: $0 to $320.

Data note: 30% of the labor weighting for this project uses a statewide median because BLS has no published metro figure for that trade in Yuma. The wage table below marks each row.

Yuma weather and the paver patio calendar

Climate numbers on this page come from NOAA's 1991-2020 U.S. Climate Normals at the nearest suitable station, Yuma Mcas (10 miles from the city center). They are 30-year averages, so any one year can run hotter, colder or wetter.

For digging, grading and setting material in the ground, the comfortable months in Yuma are November through April: 6 of 12. Outside them, May, June, July, August, September and October have an average daytime high of 90°F or more.

Yuma gets about 3 inches of precipitation in a normal year. The wettest months are January, September and December (0.7 inches in September). Inside the workable window, April and November are the driest, at 0.1 and 0.2 inches. The station averages about 181 days a year at 90°F or above.

We do not adjust the estimate by month, because we have no reliable published data on seasonal pricing. It is still worth asking contractors whether an off-peak start date changes their bid.

Monthly normals, Yuma Mcas (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan70480.4Workable
Feb73500.4Workable
Mar80550.4Workable
Apr86600.1Workable
May94670.1Hot
Jun103750.0Hot
Jul107830.2Hot
Aug106830.2Hot
Sep101780.7Hot
Oct90660.1Hot
Nov78540.2Workable
Dec68470.4Workable

Yuma against nearby metros and the rest of Arizona

Same job, same size (300 sq ft), priced for the nearest metros. San Diego is the priciest of the group at $4,750.

Comparison with nearby areas
AreaRangeMidpointvs. here
Yuma, AZthis page$2,850 – $5,100$4,000
El Centro, CA85 miles$3,300 – $5,950$4,600+16%
Phoenix, AZ110 miles$2,900 – $5,300$4,100+4%
Tucson, AZ130 miles$2,850 – $5,150$4,000level
Prescott Valley, AZ150 miles$2,900 – $5,300$4,100+3%
San Diego, CA165 miles$3,350 – $6,100$4,750+19%
Arizona (statewide)$2,900 – $5,300$4,100+3%
United States$3,000 – $5,450$4,250+6%

Out of the 300 metros we cover, Yuma ranks #199 for the cost of this job (#1 is the most expensive). Statewide, Yuma is 3% below the Arizona figure.

Elsewhere in Arizona

Arizona metros compared with Yuma
MetroSizeRangeMidpointvs. here
Phoenix, AZ2,375,760 jobs$2,900 – $5,300$4,100+4%
Tucson, AZ389,630 jobs$2,850 – $5,150$4,000level
Prescott Valley, AZ72,300 jobs$2,900 – $5,300$4,100+3%
Flagstaff, AZ66,610 jobs$2,900 – $5,300$4,100+3%
Lake Havasu City, AZ56,490 jobs$2,850 – $5,150$4,000level

Metros of a similar size

Big cities and small ones price differently, so here is Yuma against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
Wausau, WI69,530 jobs$3,200 – $5,750$4,450+13%
State College, PA68,840 jobs$3,200 – $5,750$4,500+13%
Janesville, WI69,870 jobs$3,250 – $5,900$4,550+15%
Traverse City, MI68,440 jobs$3,100 – $5,650$4,350+10%

Yuma: what basic, standard and premium work costs

The cited range is split into basic, standard and premium bands, then scaled to Yuma. Bands overlap, because plenty of standard jobs cost as much as a light premium one. Sizes run from 12x12 (144 sq ft) to pool deck (800 sq ft).

Basic

$2,850 to $3,750

Basic concrete pavers, simple pattern, level yard

Standard

$3,500 to $4,450

Mid-grade pavers, a border or curve, some regrading

Premium

$4,200 to $5,100

Natural stone or clay brick, complex pattern, slope or retaining edge

Cost by size and quality level
SizeBasicStandardPremium
12x12 (144 sq ft)$1,350 – $1,850$1,750 – $2,250$2,100 – $2,650
16x16 (256 sq ft)$2,400 – $3,200$3,000 – $3,800$3,600 – $4,400
20x20 (400 sq ft)$3,750 – $4,950$4,650 – $5,850$5,550 – $6,700
pool deck (800 sq ft)$7,550 – $9,750$9,200 – $11,400$10,900 – $13,100

Planning more than one job in Yuma?

Jobs that often go together with paver patio are priced below at their usual sizes, using the same Yuma wage and price inputs. Compared with national midpoints, retaining wall comes out highest (−5%) and wood deck lowest (−10%); the gap comes from the trades each job uses.

Related projects with local prices
ProjectSizeRangevs. US
Concrete patio300 sq ft$1,150 – $3,650−9%
Stamped concrete400 sq ft$3,000 – $7,300−8%
Retaining wall200 sq ft of wall face$6,650 – $12,800−5%
Wood deck300 sq ft$6,800 – $13,600−10%
Concrete slab400 sq ft$2,250 – $4,800−8%
Concrete driveway600 sq ft$3,300 – $8,250−10%

Paver patio: what moves the price in Yuma

  • Paver material

    Pavers alone average $2-$4 per sq ft but the full range is $1-$15 depending on concrete, brick, or natural stone (HomeGuide).

  • Base prep

    The base (road base, fabric, edging, bedding and joint sand) is $1.40-$2.20 per sq ft of the materials number.

  • Excavation and grading

    Digging out is $1-$5 per sq ft; regrading a sloped yard is $0.40-$2.00 per sq ft.

Optional extras in Yuma

Add-ons start from national price ranges and are scaled by 0.95 for Yuma, which is the average of the area's wage index (0.93) and goods price index (0.96). The estimator above can add them to your total.

Add-on prices
Add-onLocal range
Excavation and haul-away$280 – $1,400

What local crews earn in Yuma

The labor line is built from BLS wage data, one trade at a time. This job draws on 3 trades. We compare each trade's local median with the US median, weight the ratios by how much of the job each trade does, and apply the blend to the national labor cost. For Yuma the blend is 0.93.

For construction laborers (47-2061, weighted 50%) the local median is $20.80 an hour, which is 8% below the national $22.66. The middle half of them earn between $17.60 and $22.84 an hour. BLS counts 570 of them working in the area, 82.8 for every 10,000 jobs (US: 70.5), so the local bench is deeper than average.

Brickmasons and blockmasons (47-2021) carry 30% of the labor weighting. BLS does not publish this trade for the Yuma metro, so we used the Arizona statewide median: $28.49 an hour against $29.87 for the US. The middle half of them earn between $25.04 and $30.87 an hour.

Landscaping and groundskeeping workers (37-3011), 20% of the weighting: a median of $17.36 an hour, 8% below the US median of $18.82. The middle half of them earn between $15.99 and $18.56 an hour. About 460 work in the metro. That is 66.8 per 10,000 jobs, compared with 61.3 nationally, so the supply of crews looks typical.

A quick sensitivity check: moving the lead trade (construction laborers) from the median to the 75th percentile wage adds about $110 to the midpoint estimate; the 25th percentile takes off about $180. That is a swing of roughly 4.5% to 2.9% of the total, which is useful for judging whether a bid reflects wages or something else, such as scope or margin.

Yuma has 68,880 jobs in total (BLS, May 2025), ranking 262nd by size among the 300 metros on this site.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Construction laborers (47-2061)50%$17.60$20.80$22.84$22.660.92metro
Brickmasons and blockmasons (47-2021)30%$25.04$28.49$30.87$29.870.95state
Landscaping and groundskeeping workers (37-3011)20%$15.99$17.36$18.56$18.820.92metro
Blended100%0.93

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $3,500 to $4,450 for Yuma, AZ is attached.

Take this estimate with you: PDF report, $9

The report lays out the paver patio numbers for Yuma, AZ line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Paver patio in Yuma: your questions

+How much does it cost to install a paver patio in Yuma?

For 300 sq ft, expect $2,850 to $5,100 in the Yuma area. A standard-spec job lands at $3,500 to $4,450. Small jobs usually cost more per sq ft and large ones less.

+What is the price per sq ft for paver patio in Yuma?

About $9.45 to $16 per sq ft for materials and labor, plus $0 to $320 for the permit if one is needed. The US range is $10 to $17.

+Is paver patio cheaper in Yuma or El Centro?

El Centro is 85 miles away. The midpoint for 300 sq ft there is $4,600, which is 16% more than Yuma ($4,000). Wage and materials indexes both feed that gap.

+How much of the bill is labor in Yuma?

About 60% at the midpoint, or $2,350 out of $4,000. Materials are 36% and permits 4%. Nationally, labor is 60%.

+What would 20x20 (400 sq ft) cost in Yuma?

$3,750 to $6,700. Pick a different size in the estimator above to get your own number.

+Does paver patio need a permit in Yuma?

Often, but rules are set by your city or county building office, so call before you hire. Budget $0 to $320 for fees in the Yuma area (our national range of $0 to $350 scaled by the local price level).

+Is Yuma expensive for paver patio compared with the rest of Arizona?

Yuma is 3% below the Arizona statewide estimate ($4,100 at the midpoint). We cover 6 metros in Arizona; see the state page to compare them.

+What do construction laborers earn in Yuma?

The BLS median is $20.80 an hour in the Yuma area, compared with $22.66 nationally. The 25th to 75th percentile range is $17.60 to $22.84.

+What do basic and premium paver patio work cost in Yuma?

For 300 sq ft, basic work runs $2,850 to $3,750 and premium work $4,200 to $5,100. Basic means: basic concrete pavers, simple pattern, level yard. Premium means: natural stone or clay brick, complex pattern, slope or retaining edge.

+When is the best time to install a paver patio in Yuma?

Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are November through April. April and November are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.

+What does "excavation and haul-away" add in Yuma?

$280 to $1,400 for 300 sq ft, from a national range scaled by the local wage and goods indexes.

Paver patio near Yuma

Paver patio: all pricesPaver patio in ArizonaAll projects in YumaArizona cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.