Statewide estimate from BLS wages and BEA prices. Reviewed Nov 4, 2026.

Statewide range (1,000 sq ft)
$2,500 – $10,200
Per sq ft
$2.50 – $10
before permit
Versus US midpoint
Level
US $6,350
Metros covered
3

Montana prices for gravel driveway: $2,500 to $10,200 for 1,000 sq ft, or $2.50 to $10 per sq ft without the permit. The state midpoint is 0% above the national one. Local wages for construction laborers are $23.96 an hour.

Inside Montana, the metros we cover range from $6,350 (Billings) to $6,750 (Bozeman) at the midpoint. Pick your closest city in the table for a tighter number.

Estimate your gravel driveway cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

Excavated base plus top course, fabric, light grading

Add-ons

Estimated cost for 1,000 sq ft in Montana (statewide), standard level

$4,800 to $7,900

About $4.75 to $7.75 per sq ft before permits. Labor is about 52% of the bill.

Cost breakdown
PartLowHigh
Materials$2,250$3,700
Labor$2,500$4,050
Permits and fees$55$130
Total$4,800$7,900
Save and get a PDF report

Cost breakdown for 1,000 sq ft in Montana

Part of the jobLowMidpointHighShare
Materials$1,150$3,000$4,80047%
Labor$1,350$3,300$5,20052%
Permits and fees$0$95$1901%
Total$2,500$6,350$10,200100%

What construction laborers and the other trades earn in Montana

Statewide wages come from BLS's state-level estimates, which blend big cities with small towns and rural areas. 2 trades drive the labor line for this job, and the weighted ratio against the national wage level is 1.04 for Montana.

Construction laborers (47-2061), 50% of the weighting: a median of $23.96 an hour, 6% above the US median of $22.66. The middle half of them earn between $20.80 and $28.24 an hour. About 4,590 work in the state. That is 89.7 per 10,000 jobs, compared with 70.5 nationally, which suggests plenty of local crews to bid.

For operating engineers and other construction equipment operators (47-2073, weighted 50%) the local median is $29.61 an hour, which is in line with the national $28.78. The middle half of them earn between $27.07 and $34.68 an hour. BLS counts 3,750 of them working in the state, 73.3 for every 10,000 jobs (US: 30.7), so the local bench is deeper than average.

A crew paid at the 75th percentile for construction laborers ($28.24 an hour) would add about $300 to the statewide midpoint; one at the 25th percentile ($20.80) would take off about $220. Use that as a rough guide to how far a bid can sit from our midpoint on wages alone.

BLS counts 511,580 jobs across Montana (May 2025), which is 0.3% of US employment.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Construction laborers (47-2061)50%$20.80$23.96$28.24$22.661.06state
Operating engineers and other construction equipment operators (47-2073)50%$27.07$29.61$34.68$28.781.03state
Blended100%1.04

Quality levels and sizes in Montana

The cited range is cut into three overlapping bands (basic, standard and premium) and scaled to statewide Montana wages and prices. The grid prices the same bands at 4 common sizes.

Basic

$2,500 to $5,600

Crusher-run spread and compacted on firm ground

Standard

$4,800 to $7,900

Excavated base plus top course, fabric, light grading

Premium

$7,150 to $10,200

Deep multi-layer build, edging, culvert or drainage

Cost by size and quality level
SizeBasicStandardPremium
single car (500 sq ft)$1,250 – $2,850$2,450 – $4,000$3,600 – $5,200
two car (1,000 sq ft)$2,500 – $5,600$4,800 – $7,900$7,150 – $10,200
100 ft x 10 ft (1,000 sq ft)$2,500 – $5,600$4,800 – $7,900$7,150 – $10,200
long rural (2,000 sq ft)$5,000 – $11,100$9,600 – $15,700$14,100 – $20,200

Optional extras in Montana

Extras are quoted nationally and then scaled to Montana by the average of the local wage index (1.04) and goods index (0.96), a factor of 1.00. Tick any of them in the estimator above to add them to your total. Treat these as planning figures: an add-on touches different trades than the main job, so the scaling is an approximation.

Add-on prices
Add-onLocal range
Add edging (approx. 1 ft per 10 sq ft)$500 – $1,800

Montana seasons and gravel driveway

Season matters for gravel driveway. For each Montana metro below we took NOAA's 1991-2020 monthly normals from the nearest suitable station and counted comfortable months for digging and ground work.

Billings has the longest comfortable season of the metros we cover in Montana at 7 months (April through October); Missoula has the shortest at 5 (May through September). Rainfall runs from 14 inches a year in Missoula to 20 inches in Bozeman.

We do not adjust prices by month, because we have no reliable published data on seasonal pricing. Timing is still worth raising when you collect bids.

Climate by metro (NOAA 1991-2020 normals)
MetroJan avg low °FJul avg high °FPrecip (in/yr)Comfortable months
Billings1887147: April through October
Bozeman1582205: May through September
Missoula1885145: May through September

If you are planning more than one job in Montana

The table prices neighboring jobs at their usual sizes using statewide Montana wages and prices. Against national midpoints, sod installation comes out highest (+4%) and asphalt driveway lowest (−1%), because each job leans on different trades.

Related projects with local prices
ProjectSizeRangevs. US
Asphalt driveway600 sq ft$3,000 – $7,400−1%
Concrete driveway600 sq ft$3,700 – $9,450+3%
French drain60 linear ft$600 – $2,100level
Sod installation1,500 sq ft$1,550 – $3,450+4%
Concrete slab400 sq ft$2,450 – $5,200level
Paver patio300 sq ft$3,000 – $5,450level

Montana against its neighbors

Montana ranks 24 of 51 (the 50 states plus DC) for gravel driveway, where 1 is the most expensive. The costliest is Hawaii at $9,200 and the cheapest Arkansas at $5,400, both for 1,000 sq ft at the midpoint. Montana sits at $6,350. The five states closest by workforce center are listed below.

States near Montana, same project and size
StateDistanceRangeMidpointvs. here
Idaho270 miles away$2,450 – $10,100$6,250−1%
Utah400 miles away$2,450 – $10,000$6,250−2%
Wyoming460 miles away$2,450 – $10,000$6,250−2%
Washington500 miles away$2,950 – $11,900$7,400+17%
Colorado550 miles away$2,550 – $10,300$6,400+1%

Montana metro-by-metro prices

2 of the 3 metros sit above the statewide midpoint of $6,350, and the top-to-bottom gap is 6%. Each row prices the default size with that metro's own BLS wages and BEA price levels, so the gap between rows is real local variation rather than a flat markup.

MetroRange (1,000 sq ft)Midpointvs. state
Bozeman, MT$2,650 – $10,800$6,750+6%
Missoula, MT$2,550 – $10,300$6,450+1%
Billings, MT$2,500 – $10,200$6,350level

Gravel driveway: what moves the price in Montana

  • Depth and layers

    A proper driveway is a 4-inch base plus a 2-inch top course. Each extra inch of stone adds weight in tons and money.

  • Labor share

    HomeGuide puts labor at about 50% of a gravel driveway's total cost, so a longer or harder-to-reach site moves the price more than the stone does.

  • Grading and edging

    Grading runs $1-$3 per sq ft. Edging to keep the stone in is $5-$18 per linear foot.

  • Stone is sold by weight

    Stone is priced by the ton, so every extra inch of depth or foot of width adds loads of delivery.

  • Permit

    A driveway permit is typically $50-$200 where one is needed for a new curb cut or connection; plenty of rural counties require none.

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $4,800 to $7,900 for Montana is attached.

A detailed PDF report of this estimate, $9

The report lays out the gravel driveway numbers for Montana line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Gravel driveway in Montana: your questions

+How much does it cost to install a gravel driveway in Montana?

$2,500 to $10,200 for 1,000 sq ft, using statewide wages and prices. Metro areas inside Montana can sit above or below that.

+Which city in Montana is cheapest for gravel driveway?

Billings at about $6,350 (midpoint, 1,000 sq ft). The priciest is Bozeman at $6,750.

+Is gravel driveway cheaper in Montana than the US average?

It is 0% more expensive: $6,350 against $6,350 for 1,000 sq ft at the midpoint.

+What share of the price is labor in Montana?

About 52% ($3,300). Materials are 47%. Statewide labor for this job is weighted 1.04x the national wage level.

+What do construction laborers earn in Montana?

The BLS statewide median is $23.96 an hour, against $22.66 for the US. The 25th to 75th percentile range is $20.80 to $28.24.

+Where does Montana rank for gravel driveway costs?

24th most expensive of 51 (the 50 states plus DC) at the midpoint, $6,350 for 1,000 sq ft. Rank 1 is the costliest.

+What do basic and premium gravel driveway work cost in Montana?

For 1,000 sq ft, basic work runs $2,500 to $5,600 and premium work $7,150 to $10,200. Basic means: crusher-run spread and compacted on firm ground. Premium means: deep multi-layer build, edging, culvert or drainage.

+Does the season matter for gravel driveway in Montana?

Yes where winters or summers are hard. Of the Montana metros we cover, Billings has the most comfortable months (7 of 12) based on NOAA 1991-2020 normals. Our prices do not change by month, so ask contractors whether they charge more or less in busy and slow seasons.

+What does "add edging" add in Montana?

$500 to $1,800 for 1,000 sq ft, from a national range scaled by the statewide wage and goods indexes.

Gravel driveway by city in Montana

Gravel driveway: all pricesMontana cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.

Note on derived figures: Installed range spans a basic spread-and-compact job ($2.50/sq ft low, CalculateGravel) to a full build with excavation ($10/sq ft high, HomeGuide). Materials low end is DIY stone ($1.20/sq ft, CalculateGravel); high end is half of HomeGuide's $10 because it says labor is about 50% of the project.