Detached garage cost in Bloomington, IN
Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.
- Typical range (576 sq ft)
- $28,500 – $57,300
- Per sq ft
- $49.50 – $98.50
- before permit
- Versus US midpoint
- −1%
- US $43,500
- Rank of 300 metros
- #126
- 1 = most expensive
Local price for a detached garage in the Bloomington area: $28,500 to $57,300 for 576 sq ft. The low end is a basic job on easy ground; the high end is a premium spec with harder access. The midpoint lands close to the US figure. Building materials run about 6% below the US average here (BEA goods price index 94.3).
Estimate your detached garage cost
Pick a size, a quality level and where you live. Prices update as you type.
Estimated cost for 576 sq ft in Bloomington, IN, standard level
$37,100 to $48,600
About $64 to $84 per sq ft before permits. Labor is about 52% of the bill.
| Part | Low | High |
|---|---|---|
| Materials | $17,700 | $23,100 |
| Labor | $19,200 | $25,200 |
| Permits and fees | $240 | $380 |
| Total | $37,100 | $48,600 |
Cost breakdown for 576 sq ft in Bloomington, IN
| Part of the job | Low | Midpoint | High | Share |
|---|---|---|---|---|
| Materials | $13,600 | $20,400 | $27,200 | 47% |
| Labor | $14,800 | $22,200 | $29,600 | 52% |
| Permits and fees | $140 | $310 | $480 | 1% |
| Total | $28,500 | $42,900 | $57,300 | 100% |
Where the Bloomington price comes from
We price the labor side from BLS wage data for 5 trades: carpenters at 45%, cement masons and concrete finishers at 15%, construction laborers at 20%, electricians at 10%, roofers at 10%. Weighted together, Bloomington wages are 1.03 times the national level. Labor makes up about 52% of the midpoint estimate (50% at national prices).
Materials are scaled with BEA's regional price parity for goods. Bloomington is at 94.3 against 100 for the US, so a materials line of $21,600 nationally becomes $20,400 here (midpoint, 576 sq ft). Permits follow the all-items index of 95.1: $140 to $480.
The best months for detached garage in Bloomington
Climate numbers on this page come from NOAA's 1991-2020 U.S. Climate Normals at the nearest suitable station, Bloomington Indiana Univ (in the city). They are 30-year averages, so any one year can run hotter, colder or wetter.
For pouring concrete, the comfortable months in Bloomington are April through October: 7 of 12. Outside them, January, February, March, November and December have an average overnight low of 40°F or below.
The 40°F line is a deliberately cautious stand-in. The American Concrete Institute's cold-weather guide (ACI 306R-16) defines cold-weather concreting around an average daily air temperature below 40°F, which is colder than our test of an average overnight low at or below 40°F, so we flag a few extra shoulder months. In cold weather crews may need heated enclosures, insulating blankets or accelerated mixes, and those measures can raise a quote.
Bloomington gets about 49 inches of precipitation in a normal year, including roughly 18 inches of snow. The wettest months are April, May and June (5.4 inches in June). Inside the workable window, August and September are the driest, at 3.4 and 3.8 inches. The station averages about 21 days a year at 90°F or above.
We do not adjust the estimate by month, because we have no reliable published data on seasonal pricing. It is still worth asking contractors whether an off-peak start date changes their bid.
| Month | Avg high °F | Avg low °F | Precip (in) | For this job |
|---|---|---|---|---|
| Jan | 37 | 21 | 3.8 | Cold |
| Feb | 42 | 23 | 3.0 | Cold |
| Mar | 52 | 32 | 3.7 | Cold |
| Apr | 64 | 42 | 5.2 | Workable |
| May | 74 | 53 | 5.4 | Workable |
| Jun | 82 | 62 | 5.4 | Workable |
| Jul | 85 | 65 | 4.6 | Workable |
| Aug | 85 | 64 | 3.4 | Workable |
| Sep | 79 | 56 | 3.8 | Workable |
| Oct | 66 | 44 | 3.8 | Workable |
| Nov | 53 | 34 | 3.9 | Cold |
| Dec | 41 | 26 | 3.5 | Cold |
Who does the work: Bloomington trade wages
The labor line is built from BLS wage data, one trade at a time. This job draws on 5 trades. We compare each trade's local median with the US median, weight the ratios by how much of the job each trade does, and apply the blend to the national labor cost. For Bloomington the blend is 1.03.
Carpenters (47-2031), 45% of the weighting: a median of $29.50 an hour, in line with the US median of $29.12. The middle half of them earn between $23.82 and $35.36 an hour. About 270 work in the metro. That is 36.9 per 10,000 jobs, compared with 43.1 nationally, so the supply of crews looks typical.
For construction laborers (47-2061, weighted 20%) the local median is $23.42 an hour, which is 3% above the national $22.66. The middle half of them earn between $19.28 and $30.52 an hour. BLS counts 360 of them working in the area, 49.2 for every 10,000 jobs (US: 70.5), so the local bench is thinner than average.
Cement masons and concrete finishers (47-2051), 15% of the weighting: a median of $31.50 an hour, 15% above the US median of $27.41. The middle half of them earn between $25.64 and $32.33 an hour. About 80 work in the metro. That is 10.9 per 10,000 jobs, compared with 13.3 nationally, so expect fewer local crews to bid.
For electricians (47-2111, weighted 10%) the local median is $31.57 an hour, which is 4% above the national $30.38. The middle half of them earn between $24.25 and $44.46 an hour. BLS counts 210 of them working in the area, 28.7 for every 10,000 jobs (US: 48.7), so the local bench is thinner than average.
Roofers (47-2181), 10% of the weighting: a median of $23.81 an hour, 11% below the US median of $26.65. The middle half of them earn between $20.69 and $29.40 an hour. About 90 work in the metro. That is 12.3 per 10,000 jobs, compared with 8.7 nationally, which suggests plenty of local crews to bid.
A quick sensitivity check: moving the lead trade (carpenters) from the median to the 75th percentile wage adds about $1,950 to the midpoint estimate; the 25th percentile takes off about $1,900. That is a swing of roughly 4.4% to 4.6% of the total, which is useful for judging whether a bid reflects wages or something else, such as scope or margin.
Bloomington has 73,240 jobs in total (BLS, May 2025), ranking 251st by size among the 300 metros on this site.
| Trade | Weight | 25th pct | Median | 75th pct | US median | Ratio | Level used |
|---|---|---|---|---|---|---|---|
| Carpenters (47-2031) | 45% | $23.82 | $29.50 | $35.36 | $29.12 | 1.01 | metro |
| Cement masons and concrete finishers (47-2051) | 15% | $25.64 | $31.50 | $32.33 | $27.41 | 1.15 | metro |
| Construction laborers (47-2061) | 20% | $19.28 | $23.42 | $30.52 | $22.66 | 1.03 | metro |
| Electricians (47-2111) | 10% | $24.25 | $31.57 | $44.46 | $30.38 | 1.04 | metro |
| Roofers (47-2181) | 10% | $20.69 | $23.81 | $29.40 | $26.65 | 0.89 | metro |
| Blended | 100% | 1.03 | |||||
What nearby projects cost in Bloomington
Jobs that often go together with detached garage are priced below at their usual sizes, using the same Bloomington wage and price inputs. Compared with national midpoints, concrete driveway comes out highest (+4%) and garage door lowest (−4%); the gap comes from the trades each job uses.
| Project | Size | Range | vs. US |
|---|---|---|---|
| Concrete slab | 400 sq ft | $2,500 – $5,200 | level |
| Garage door | 1 door | $680 – $3,550 | −4% |
| Concrete driveway | 600 sq ft | $3,750 – $9,650 | +4% |
| Home addition | 300 sq ft | $38,600 – $78,200 | +2% |
Cost by quality level and size in Bloomington
The cited range is split into basic, standard and premium bands, then scaled to Bloomington. Bands overlap, because plenty of standard jobs cost as much as a light premium one. Sizes run from 1-car (12x20), 240 sq ft to 3-car (900 sq ft).
Basic
$28,500 to $40,000
Basic shell: slab, framing, siding, a roll-up door
Standard
$37,100 to $48,600
Finished exterior, insulated, electrical and a nicer door
Premium
$45,800 to $57,300
Insulated and drywalled, heat and cooling, upgraded finishes
| Size | Basic | Standard | Premium |
|---|---|---|---|
| 1-car (12x20), 240 sq ft | $12,000 – $16,800 | $15,600 – $20,500 | $19,300 – $24,100 |
| 2-car (24x24), 576 sq ft | $28,500 – $40,000 | $37,100 – $48,600 | $45,800 – $57,300 |
| 2.5-car (24x30), 720 sq ft | $35,600 – $50,000 | $46,400 – $60,700 | $57,100 – $71,400 |
| 3-car (900 sq ft) | $44,500 – $62,400 | $57,900 – $75,800 | $71,300 – $89,200 |
Bloomington against nearby metros and the rest of Indiana
Same job, same size (576 sq ft), priced for the nearest metros. Evansville is the priciest of the group at $44,600. Louisville is the cheapest at $41,500.
| Area | Range | Midpoint | vs. here |
|---|---|---|---|
| Bloomington, INthis page | $28,500 – $57,300 | $42,900 | |
| Terre Haute, IN40 miles | $28,300 – $56,800 | $42,500 | −1% |
| Indianapolis, IN50 miles | $29,000 – $58,200 | $43,600 | +2% |
| Louisville, KY90 miles | $27,600 – $55,500 | $41,500 | −3% |
| Lafayette, IN90 miles | $28,600 – $57,500 | $43,000 | level |
| Evansville, IN95 miles | $29,700 – $59,500 | $44,600 | +4% |
| Indiana (statewide) | $29,100 – $58,300 | $43,700 | +2% |
| United States | $29,000 – $58,100 | $43,500 | +1% |
Out of the 300 metros we cover, Bloomington ranks #126 for the cost of this job (#1 is the most expensive). Statewide, Bloomington is 2% below the Indiana figure.
Elsewhere in Indiana
| Metro | Size | Range | Midpoint | vs. here |
|---|---|---|---|---|
| Indianapolis, IN | 1,105,170 jobs | $29,000 – $58,200 | $43,600 | +2% |
| Fort Wayne, IN | 225,520 jobs | $28,300 – $56,700 | $42,500 | −1% |
| Evansville, IN | 135,250 jobs | $29,700 – $59,500 | $44,600 | +4% |
| South Bend, IN | 131,670 jobs | $29,000 – $58,100 | $43,600 | +2% |
| Elkhart, IN | 127,730 jobs | $28,900 – $58,000 | $43,400 | +1% |
| Lafayette, IN | 102,200 jobs | $28,600 – $57,500 | $43,000 | level |
Metros of a similar size
Big cities and small ones price differently, so here is Bloomington against the 4 metros with the closest total employment.
| Metro | Size | Range | Midpoint | vs. here |
|---|---|---|---|---|
| Kahului, HI | 73,750 jobs | $37,700 – $75,600 | $56,600 | +32% |
| Auburn, AL | 72,710 jobs | $25,400 – $51,000 | $38,200 | −11% |
| Rapid City, SD | 73,820 jobs | $26,300 – $52,800 | $39,500 | −8% |
| Prescott Valley, AZ | 72,300 jobs | $27,300 – $54,800 | $41,100 | −4% |
Detached garage: what moves the price in Bloomington
Electrical
Running power to a detached garage costs $1,000-$3,800 for a standard build and $5,000 or more for a long trench or amperage upgrade (Angi, Trusscore).
Size and finish level
HomeGuide puts a 2-car detached garage at $20,000-$57,600, with the spread driven by how finished it is.
Foundation
A slab is cheapest. A frost-depth foundation in cold states costs more.
Get 3 local quotes
Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $37,100 to $48,600 for Bloomington, IN is attached.
A detailed PDF report of this estimate, $9
The report lays out the detached garage numbers for Bloomington, IN line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.
Detached garage in Bloomington: your questions
+How much does it cost to build a detached garage in Bloomington?
For 576 sq ft, expect $28,500 to $57,300 in the Bloomington area. A standard-spec job lands at $37,100 to $48,600. Small jobs usually cost more per sq ft and large ones less.
+What is the price per sq ft for detached garage in Bloomington?
About $49.50 to $98.50 per sq ft for materials and labor, plus $140 to $480 for the permit if one is needed. The US range is $50 to $100.
+Is detached garage cheaper in Bloomington or Terre Haute?
Terre Haute is 40 miles away. The midpoint for 576 sq ft there is $42,500, which is 1% less than Bloomington ($42,900). Wage and materials indexes both feed that gap.
+How much of the bill is labor in Bloomington?
About 52% at the midpoint, or $22,200 out of $42,900. Materials are 47% and permits 1%. Nationally, labor is 50%.
+What would 2.5-car (24x30), 720 sq ft cost in Bloomington?
$35,600 to $71,400. Pick a different size in the estimator above to get your own number.
+Does detached garage need a permit in Bloomington?
Often, but rules are set by your city or county building office, so call before you hire. Budget $140 to $480 for fees in the Bloomington area (our national range of $150 to $500 scaled by the local price level).
+Is Bloomington expensive for detached garage compared with the rest of Indiana?
Bloomington is 2% below the Indiana statewide estimate ($43,700 at the midpoint). We cover 8 metros in Indiana; see the state page to compare them.
+What do carpenters earn in Bloomington?
The BLS median is $29.50 an hour in the Bloomington area, compared with $29.12 nationally. The 25th to 75th percentile range is $23.82 to $35.36.
+What do basic and premium detached garage work cost in Bloomington?
For 576 sq ft, basic work runs $28,500 to $40,000 and premium work $45,800 to $57,300. Basic means: basic shell: slab, framing, siding, a roll-up door. Premium means: insulated and drywalled, heat and cooling, upgraded finishes.
+When is the best time to build a detached garage in Bloomington?
Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are April through October. August and September are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.
Detached garage near Bloomington
Where these numbers come from
Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.
- HomeGuide: How Much Does a Detached Garage Cost? (2026) (accessed November 4, 2026)
- Trusscore: How Much Does It Cost to Build a Garage? 2026 Price Guide (accessed November 4, 2026)
- Angi: How Much Does It Cost to Build a Detached Garage? [2026 Data] (accessed November 4, 2026)
- HomeGuide: 2026 Building Permit Costs | Fees & Cost Calculator (accessed November 4, 2026)
- BLS Occupational Employment and Wage Statistics, May 2025
- BEA Regional Price Parities, 2024
- NOAA NCEI U.S. Climate Normals, 1991-2020
Note on derived figures: Materials = installed range / 1.6, because Angi puts professional labor at roughly an additional 60% of the materials cost (materials about 62.5% of the total).