Concrete driveway cost in Bloomington, IN

Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.

Typical range (600 sq ft)
$3,750 – $9,650
Per sq ft
$6.20 – $16
before permit
Versus US midpoint
+4%
US $6,450
Rank of 300 metros
#98
1 = most expensive

If you want to pour a concrete driveway in Bloomington, plan on $3,750 to $9,650 for 600 sq ft, all in. Per sq ft, that is $6.20 to $16 for materials and labor, with the permit on top. The local midpoint runs 4% higher than the national one. Cement masons and concrete finishers earn a median of $31.50 an hour in the Bloomington area, 15% above the US median of $27.41.

Estimate your concrete driveway cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

5-inch with rebar and saw-cut joints, a border or one color

Add-ons

Estimated cost for 600 sq ft in Bloomington, IN, standard level

$5,550 to $7,900

About $9.05 to $13 per sq ft before permits. Labor is about 72% of the bill.

Cost breakdown
PartLowHigh
Materials$1,600$2,000
Labor$3,850$5,750
Permits and fees$90$150
Total$5,550$7,900
Save and get a PDF report

Cost breakdown for 600 sq ft in Bloomington, IN

Part of the jobLowMidpointHighShare
Materials$1,300$1,800$2,25027%
Labor$2,400$4,800$7,20072%
Permits and fees$50$120$1902%
Total$3,750$6,700$9,650100%

Where the Bloomington price comes from

The wage side of the estimate leans on cement masons and concrete finishers, who do 50% of the hours on a typical job. Their local median is $31.50 an hour. Add the other trades involved and the blended wage index for Bloomington is 1.09 (US = 1.00), which puts labor at 72% of the total.

On the materials line, the BEA goods price index for the Bloomington metro is 94.3 (US = 100). The midpoint materials bill for 600 sq ft comes to $1,800, compared with $1,900 at national prices. Permit and inspection fees are scaled by the broader index (95.1) and land at $50 to $190.

Related projects, priced for Bloomington

Because every project leans on different trades, Bloomington's wage level does not move all prices equally. Against the US midpoint, stamped concrete runs +2% and asphalt driveway −3%.

Related projects with local prices
ProjectSizeRangevs. US
Asphalt driveway600 sq ft$2,950 – $7,150−3%
Gravel driveway1,000 sq ft$2,500 – $10,100−1%
Concrete slab400 sq ft$2,500 – $5,200level
Stamped concrete400 sq ft$3,300 – $8,150+2%
Paver patio300 sq ft$3,050 – $5,550+2%
Concrete patio300 sq ft$1,250 – $4,100+2%

Bloomington labor market for concrete driveway

Wages are the part of this estimate that changes most from town to town. 4 trades carry the job here, and each is compared with its US median. The weighted result for Bloomington is 1.09 times the national level.

For cement masons and concrete finishers (47-2051, weighted 50%) the local median is $31.50 an hour, which is 15% above the national $27.41. The middle half of them earn between $25.64 and $32.33 an hour. BLS counts 80 of them working in the area, 10.9 for every 10,000 jobs (US: 13.3), so the local bench is thinner than average.

Construction laborers (47-2061), 30% of the weighting: a median of $23.42 an hour, 3% above the US median of $22.66. The middle half of them earn between $19.28 and $30.52 an hour. About 360 work in the metro. That is 49.2 per 10,000 jobs, compared with 70.5 nationally, so expect fewer local crews to bid.

For operating engineers and other construction equipment operators (47-2073, weighted 10%) the local median is $29.87 an hour, which is 4% above the national $28.78. The middle half of them earn between $21.64 and $42.78 an hour. BLS counts 230 of them working in the area, 31.4 for every 10,000 jobs (US: 30.7), so the local bench is about average.

For carpenters (47-2031, weighted 10%) the local median is $29.50 an hour, which is in line with the national $29.12. The middle half of them earn between $23.82 and $35.36 an hour. BLS counts 270 of them working in the area, 36.9 for every 10,000 jobs (US: 43.1), so the local bench is about average.

Quotes come from real crews, not medians. If the cement masons and concrete finishers on your job are paid at the 75th percentile ($32.33 an hour) instead of the median, the labor line grows by about $65. At the 25th percentile ($25.64) it shrinks by about $470. The total moves by 1.0% or 7.0%, so wages alone rarely explain a quote that is far outside our range.

For context on the local economy, BLS counts 73,240 jobs in the Bloomington area. That makes it the 251st largest of the 300 metros we cover, with 0.05% of US employment.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Cement masons and concrete finishers (47-2051)50%$25.64$31.50$32.33$27.411.15metro
Construction laborers (47-2061)30%$19.28$23.42$30.52$22.661.03metro
Operating engineers and other construction equipment operators (47-2073)10%$21.64$29.87$42.78$28.781.04metro
Carpenters (47-2031)10%$23.82$29.50$35.36$29.121.01metro
Blended100%1.09

Optional extras in Bloomington

Extras are quoted nationally and then scaled to Bloomington by the average of the local wage index (1.09) and goods index (0.94), a factor of 1.02. Tick any of them in the estimator above to add them to your total. Treat these as planning figures: an add-on touches different trades than the main job, so the scaling is an approximation.

Add-on prices
Add-onLocal range
Add rebar reinforcement$610 – $1,850
Remove the old driveway$1,200 – $3,650

Concrete driveway: what moves the price in Bloomington

  • Permits and the apron

    A driveway permit is typically $50-$200 and is often required for new work. The apron where the driveway meets the street can need a separate right-of-way permit.

  • Thickness

    HomeGuide prices a standard 4-inch driveway at $6-$15/sq ft and a 6-inch one, recommended for heavy vehicles, at $8-$20/sq ft.

  • Old driveway removal

    Tearing out the old surface adds about $2-$6 per sq ft, and some cities want the haul-off documented.

Pick a size, pick a tier: concrete driveway pricing in Bloomington

Three bands are cut from the same cited range and localized for Bloomington wages and prices. They overlap on purpose: a good standard job and a modest premium job can cost the same. The grid below prices the same bands at 4 common sizes.

Basic

$3,750 to $6,100

Plain gray, 4-inch broom finish, flat site

Standard

$5,550 to $7,900

5-inch with rebar and saw-cut joints, a border or one color

Premium

$7,300 to $9,650

6-inch for heavy vehicles, stamped or colored, grading needed

Cost by size and quality level
SizeBasicStandardPremium
1-car (12x20), 240 sq ft$1,550 – $2,500$2,250 – $3,250$3,000 – $3,950
2-car (20x24), 480 sq ft$3,000 – $4,900$4,450 – $6,350$5,850 – $7,750
2-car + apron (600 sq ft)$3,750 – $6,100$5,550 – $7,900$7,300 – $9,650
3-car (900 sq ft)$5,650 – $9,150$8,250 – $11,800$10,900 – $14,400

Is Bloomington cheap or dear? The local comparison

Same job, same size (600 sq ft), priced for the nearest metros. Evansville is the priciest of the group at $6,950. Louisville is the cheapest at $6,150.

Comparison with nearby areas
AreaRangeMidpointvs. here
Bloomington, INthis page$3,750 – $9,650$6,700
Terre Haute, IN40 miles$3,600 – $9,150$6,400−5%
Indianapolis, IN50 miles$3,800 – $9,800$6,800+2%
Louisville, KY90 miles$3,500 – $8,850$6,150−8%
Lafayette, IN90 miles$3,700 – $9,500$6,600−2%
Evansville, IN95 miles$3,900 – $10,000$6,950+4%
Indiana (statewide)$3,800 – $9,700$6,750+1%
United States$3,650 – $9,200$6,450−4%

Across 300 US metros, Bloomington comes in at #98 from the top. The priciest is Kahului, HI at $10,000; the cheapest is McAllen, TX at $4,950 (midpoints, 600 sq ft). Statewide, Bloomington is 1% below the Indiana figure.

Other Indiana metros

Indiana metros compared with Bloomington
MetroSizeRangeMidpointvs. here
Indianapolis, IN1,105,170 jobs$3,800 – $9,800$6,800+2%
Fort Wayne, IN225,520 jobs$3,700 – $9,450$6,600−2%
Evansville, IN135,250 jobs$3,900 – $10,000$6,950+4%
South Bend, IN131,670 jobs$3,750 – $9,600$6,650−1%
Elkhart, IN127,730 jobs$3,700 – $9,500$6,600−2%
Lafayette, IN102,200 jobs$3,700 – $9,500$6,600−2%

Cities with a workforce like Bloomington's

Big cities and small ones price differently, so here is Bloomington against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
Kahului, HI73,750 jobs$5,500 – $14,600$10,000+50%
Auburn, AL72,710 jobs$3,100 – $7,650$5,350−20%
Rapid City, SD73,820 jobs$3,350 – $8,400$5,850−13%
Prescott Valley, AZ72,300 jobs$3,400 – $8,600$6,000−10%

Climate in Bloomington: timing your concrete driveway job

We use NOAA's 1991-2020 climate normals for Bloomington Indiana Univ (in the city). These are 30-year monthly averages, not forecasts.

April through October is the stretch where pouring concrete runs into the fewest weather problems in Bloomington (7 of 12 months). January, February, March, November and December have an average overnight low of 40°F or below.

The 40°F line is a deliberately cautious stand-in. The American Concrete Institute's cold-weather guide (ACI 306R-16) defines cold-weather concreting around an average daily air temperature below 40°F, which is colder than our test of an average overnight low at or below 40°F, so we flag a few extra shoulder months. In cold weather crews may need heated enclosures, insulating blankets or accelerated mixes, and those measures can raise a quote.

Bloomington gets about 49 inches of precipitation in a normal year, including roughly 18 inches of snow. The wettest months are April, May and June (5.4 inches in June). Inside the workable window, August and September are the driest, at 3.4 and 3.8 inches. The station averages about 21 days a year at 90°F or above.

Does the season change the price? Probably, but we do not have a sourced seasonal price curve, so the estimator shows a year-round figure and does not adjust by month. When you collect quotes, ask whether scheduling in a slower month gets a better rate.

Monthly normals, Bloomington Indiana Univ (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan37213.8Cold
Feb42233.0Cold
Mar52323.7Cold
Apr64425.2Workable
May74535.4Workable
Jun82625.4Workable
Jul85654.6Workable
Aug85643.4Workable
Sep79563.8Workable
Oct66443.8Workable
Nov53343.9Cold
Dec41263.5Cold

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $5,550 to $7,900 for Bloomington, IN is attached.

Detailed concrete driveway report for Bloomington, IN, $9

Multi-page report for Bloomington, IN: low, typical and high cost, a line-item breakdown of materials and labor by trade, permit notes, the best months to schedule, a quote comparison sheet, red flags, questions for contractors, checklists and every source. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Concrete driveway in Bloomington: your questions

+How much does it cost to pour a concrete driveway in Bloomington?

For 600 sq ft, expect $3,750 to $9,650 in the Bloomington area. A standard-spec job lands at $5,550 to $7,900. Small jobs usually cost more per sq ft and large ones less.

+What is the price per sq ft for concrete driveway in Bloomington?

About $6.20 to $16 per sq ft for materials and labor, plus $50 to $190 for the permit if one is needed. The US range is $6 to $15.

+Is concrete driveway cheaper in Bloomington or Terre Haute?

Terre Haute is 40 miles away. The midpoint for 600 sq ft there is $6,400, which is 5% less than Bloomington ($6,700). Wage and materials indexes both feed that gap.

+How much of the bill is labor in Bloomington?

About 72% at the midpoint, or $4,800 out of $6,700. Materials are 27% and permits 2%. Nationally, labor is 69%.

+What would 2-car + apron (600 sq ft) cost in Bloomington?

$3,750 to $9,650. Pick a different size in the estimator above to get your own number.

+Does concrete driveway need a permit in Bloomington?

Often, but rules are set by your city or county building office, so call before you hire. Budget $50 to $190 for fees in the Bloomington area (our national range of $50 to $200 scaled by the local price level).

+Is Bloomington expensive for concrete driveway compared with the rest of Indiana?

Bloomington is 1% below the Indiana statewide estimate ($6,750 at the midpoint). We cover 8 metros in Indiana; see the state page to compare them.

+What do cement masons and concrete finishers earn in Bloomington?

The BLS median is $31.50 an hour in the Bloomington area, compared with $27.41 nationally. The 25th to 75th percentile range is $25.64 to $32.33.

+What do basic and premium concrete driveway work cost in Bloomington?

For 600 sq ft, basic work runs $3,750 to $6,100 and premium work $7,300 to $9,650. Basic means: plain gray, 4-inch broom finish, flat site. Premium means: 6-inch for heavy vehicles, stamped or colored, grading needed.

+When is the best time to pour a concrete driveway in Bloomington?

Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are April through October. August and September are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.

+What does "add rebar reinforcement" add in Bloomington?

$610 to $1,850 for 600 sq ft, from a national range scaled by the local wage and goods indexes.

Concrete driveway near Bloomington

Concrete driveway: all pricesConcrete driveway in IndianaAll projects in BloomingtonIndiana cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.

Note on derived figures: Materials = SimplyWise's sample 600 sq ft, 4-inch driveway line ($1,400-$2,400 in materials) divided by 600 sq ft.