Concrete slab cost in Bloomington, IN

Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.

Typical range (400 sq ft)
$2,500 – $5,200
Per sq ft
$6.10 – $12
before permit
Versus US midpoint
Level
US $3,850
Rank of 300 metros
#110
1 = most expensive

A concrete slab in Bloomington, IN usually costs $2,500 to $5,200 for 400 sq ft. That works out to about $6.10 to $12 per sq ft before permits. That is within a few percent of the national midpoint, so there is little local premium or discount. Cement masons and concrete finishers earn a median of $31.50 an hour in the Bloomington area, 15% above the US median of $27.41.

Estimate your concrete slab cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

4-5 inch slab with rebar or heavier mesh and standard base prep

Add-ons

Estimated cost for 400 sq ft in Bloomington, IN, standard level

$3,300 to $4,400

About $7.90 to $10.50 per sq ft before permits. Labor is about 45% of the bill.

Cost breakdown
PartLowHigh
Materials$1,600$2,200
Labor$1,550$1,900
Permits and fees$150$280
Total$3,300$4,400
Save and get a PDF report

Cost breakdown for 400 sq ft in Bloomington, IN

Part of the jobLowMidpointHighShare
Materials$1,150$1,900$2,65049%
Labor$1,300$1,750$2,20045%
Permits and fees$50$210$3806%
Total$2,500$3,850$5,200100%

What is behind the Bloomington number

The wage side of the estimate leans on cement masons and concrete finishers, who do 50% of the hours on a typical job. Their local median is $31.50 an hour. Add the other trades involved and the blended wage index for Bloomington is 1.09 (US = 1.00), which puts labor at 45% of the total.

Materials are scaled with BEA's regional price parity for goods. Bloomington is at 94.3 against 100 for the US, so a materials line of $2,000 nationally becomes $1,900 here (midpoint, 400 sq ft). Permits follow the all-items index of 95.1: $50 to $380.

What local crews earn in Bloomington

The labor line is built from BLS wage data, one trade at a time. This job draws on 4 trades. We compare each trade's local median with the US median, weight the ratios by how much of the job each trade does, and apply the blend to the national labor cost. For Bloomington the blend is 1.09.

Cement masons and concrete finishers (47-2051), 50% of the weighting: a median of $31.50 an hour, 15% above the US median of $27.41. The middle half of them earn between $25.64 and $32.33 an hour. About 80 work in the metro. That is 10.9 per 10,000 jobs, compared with 13.3 nationally, so expect fewer local crews to bid.

For construction laborers (47-2061, weighted 30%) the local median is $23.42 an hour, which is 3% above the national $22.66. The middle half of them earn between $19.28 and $30.52 an hour. BLS counts 360 of them working in the area, 49.2 for every 10,000 jobs (US: 70.5), so the local bench is thinner than average.

Operating engineers and other construction equipment operators (47-2073), 10% of the weighting: a median of $29.87 an hour, 4% above the US median of $28.78. The middle half of them earn between $21.64 and $42.78 an hour. About 230 work in the metro. That is 31.4 per 10,000 jobs, compared with 30.7 nationally, so the supply of crews looks typical.

Carpenters (47-2031), 10% of the weighting: a median of $29.50 an hour, in line with the US median of $29.12. The middle half of them earn between $23.82 and $35.36 an hour. About 270 work in the metro. That is 36.9 per 10,000 jobs, compared with 43.1 nationally, so the supply of crews looks typical.

A quick sensitivity check: moving the lead trade (cement masons and concrete finishers) from the median to the 75th percentile wage adds about $25 to the midpoint estimate; the 25th percentile takes off about $170. That is a swing of roughly 4.4% to 0.6% of the total, which is useful for judging whether a bid reflects wages or something else, such as scope or margin.

Bloomington has 73,240 jobs in total (BLS, May 2025), ranking 251st by size among the 300 metros on this site.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Cement masons and concrete finishers (47-2051)50%$25.64$31.50$32.33$27.411.15metro
Construction laborers (47-2061)30%$19.28$23.42$30.52$22.661.03metro
Operating engineers and other construction equipment operators (47-2073)10%$21.64$29.87$42.78$28.781.04metro
Carpenters (47-2031)10%$23.82$29.50$35.36$29.121.01metro
Blended100%1.09

Add-ons priced for Bloomington

Add-ons start from national price ranges and are scaled by 1.02 for Bloomington, which is the average of the area's wage index (1.09) and goods price index (0.94). The estimator above can add them to your total.

Add-on prices
Add-onLocal range
Add rebar reinforcement$410 – $1,200
Remove old concrete first$810 – $2,450

What nearby projects cost in Bloomington

Jobs that often go together with concrete slab are priced below at their usual sizes, using the same Bloomington wage and price inputs. Compared with national midpoints, concrete driveway comes out highest (+4%) and asphalt driveway lowest (−3%); the gap comes from the trades each job uses.

Related projects with local prices
ProjectSizeRangevs. US
Concrete driveway600 sq ft$3,750 – $9,650+4%
Concrete patio300 sq ft$1,250 – $4,100+2%
Detached garage576 sq ft$28,500 – $57,300−1%
Stamped concrete400 sq ft$3,300 – $8,150+2%
Asphalt driveway600 sq ft$2,950 – $7,150−3%
Gravel driveway1,000 sq ft$2,500 – $10,100−1%

Bloomington weather and the concrete slab calendar

Climate numbers on this page come from NOAA's 1991-2020 U.S. Climate Normals at the nearest suitable station, Bloomington Indiana Univ (in the city). They are 30-year averages, so any one year can run hotter, colder or wetter.

For pouring concrete, the comfortable months in Bloomington are April through October: 7 of 12. Outside them, January, February, March, November and December have an average overnight low of 40°F or below.

The 40°F line is a deliberately cautious stand-in. The American Concrete Institute's cold-weather guide (ACI 306R-16) defines cold-weather concreting around an average daily air temperature below 40°F, which is colder than our test of an average overnight low at or below 40°F, so we flag a few extra shoulder months. In cold weather crews may need heated enclosures, insulating blankets or accelerated mixes, and those measures can raise a quote.

Bloomington gets about 49 inches of precipitation in a normal year, including roughly 18 inches of snow. The wettest months are April, May and June (5.4 inches in June). Inside the workable window, August and September are the driest, at 3.4 and 3.8 inches. The station averages about 21 days a year at 90°F or above.

We do not adjust the estimate by month, because we have no reliable published data on seasonal pricing. It is still worth asking contractors whether an off-peak start date changes their bid.

Monthly normals, Bloomington Indiana Univ (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan37213.8Cold
Feb42233.0Cold
Mar52323.7Cold
Apr64425.2Workable
May74535.4Workable
Jun82625.4Workable
Jul85654.6Workable
Aug85643.4Workable
Sep79563.8Workable
Oct66443.8Workable
Nov53343.9Cold
Dec41263.5Cold

Cost by quality level and size in Bloomington

The cited range is split into basic, standard and premium bands, then scaled to Bloomington. Bands overlap, because plenty of standard jobs cost as much as a light premium one. Sizes run from 10x10 pad (100 sq ft) to 30x40 foundation (1,200 sq ft).

Basic

$2,500 to $3,550

4-inch broom-finish slab, light mesh, easy truck access

Standard

$3,300 to $4,400

4-5 inch slab with rebar or heavier mesh and standard base prep

Premium

$4,100 to $5,200

6-inch slab, heavy reinforcement, thick base, pump truck or tight access

Cost by size and quality level
SizeBasicStandardPremium
10x10 pad (100 sq ft)$660 – $1,050$940 – $1,300$1,200 – $1,600
12x12 (144 sq ft)$930 – $1,400$1,300 – $1,750$1,650 – $2,100
20x20 (400 sq ft)$2,500 – $3,550$3,300 – $4,400$4,100 – $5,200
24x24 garage floor (576 sq ft)$3,550 – $5,050$4,700 – $6,200$5,800 – $7,300
30x40 foundation (1,200 sq ft)$7,350 – $10,400$9,600 – $12,600$11,900 – $14,800

How Bloomington compares

Contractors rarely work more than an hour or two from home, so the neighboring metros set a rough ceiling and floor for your quotes. Midpoints for 400 sq ft range from $3,650 to $3,950 across Bloomington and its five closest metros.

Comparison with nearby areas
AreaRangeMidpointvs. here
Bloomington, INthis page$2,500 – $5,200$3,850
Terre Haute, IN40 miles$2,400 – $5,050$3,700−3%
Indianapolis, IN50 miles$2,500 – $5,250$3,900+1%
Louisville, KY90 miles$2,350 – $5,000$3,650−4%
Lafayette, IN90 miles$2,450 – $5,150$3,800−1%
Evansville, IN95 miles$2,550 – $5,300$3,950+2%
Indiana (statewide)$2,500 – $5,250$3,850+1%
United States$2,450 – $5,200$3,850level

Out of the 300 metros we cover, Bloomington ranks #110 for the cost of this job (#1 is the most expensive). Statewide, Bloomington is 1% below the Indiana figure.

Elsewhere in Indiana

Indiana metros compared with Bloomington
MetroSizeRangeMidpointvs. here
Indianapolis, IN1,105,170 jobs$2,500 – $5,250$3,900+1%
Fort Wayne, IN225,520 jobs$2,450 – $5,150$3,800−1%
Evansville, IN135,250 jobs$2,550 – $5,300$3,950+2%
South Bend, IN131,670 jobs$2,500 – $5,150$3,800−1%
Elkhart, IN127,730 jobs$2,450 – $5,150$3,800−1%
Lafayette, IN102,200 jobs$2,450 – $5,150$3,800−1%

Metros of a similar size

Big cities and small ones price differently, so here is Bloomington against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
Kahului, HI73,750 jobs$3,500 – $7,100$5,300+38%
Auburn, AL72,710 jobs$2,150 – $4,600$3,350−12%
Rapid City, SD73,820 jobs$2,250 – $4,800$3,550−8%
Prescott Valley, AZ72,300 jobs$2,300 – $4,950$3,600−6%

Why two Bloomington quotes can differ

  • Base and reinforcement

    A compacted gravel base, vapor barrier, and wire mesh or rebar are priced separately by some contractors and bundled by others. Ask which one your quote does.

  • Truck and pump access

    If the mixer truck can't back up to the forms, someone has to wheelbarrow it in or hire a pump. Pump or line-pump hire is typically billed per day.

  • Small-job minimums

    Many crews have a minimum charge, so a 10x10 pad can cost more per square foot than a 20x20 slab.

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $3,300 to $4,400 for Bloomington, IN is attached.

A detailed PDF report of this estimate, $9

The report lays out the concrete slab numbers for Bloomington, IN line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Concrete slab in Bloomington: your questions

+How much does it cost to pour a concrete slab in Bloomington?

For 400 sq ft, expect $2,500 to $5,200 in the Bloomington area. A standard-spec job lands at $3,300 to $4,400. Small jobs usually cost more per sq ft and large ones less.

+What is the price per sq ft for concrete slab in Bloomington?

About $6.10 to $12 per sq ft for materials and labor, plus $50 to $380 for the permit if one is needed. The US range is $6 to $12.

+Is concrete slab cheaper in Bloomington or Terre Haute?

Terre Haute is 40 miles away. The midpoint for 400 sq ft there is $3,700, which is 3% less than Bloomington ($3,850). Wage and materials indexes both feed that gap.

+How much of the bill is labor in Bloomington?

About 45% at the midpoint, or $1,750 out of $3,850. Materials are 49% and permits 6%. Nationally, labor is 42%.

+What would 20x20 (400 sq ft) cost in Bloomington?

$2,500 to $5,200. Pick a different size in the estimator above to get your own number.

+Does concrete slab need a permit in Bloomington?

Often, but rules are set by your city or county building office, so call before you hire. Budget $50 to $380 for fees in the Bloomington area (our national range of $50 to $400 scaled by the local price level).

+Is Bloomington expensive for concrete slab compared with the rest of Indiana?

Bloomington is 1% below the Indiana statewide estimate ($3,850 at the midpoint). We cover 8 metros in Indiana; see the state page to compare them.

+What do cement masons and concrete finishers earn in Bloomington?

The BLS median is $31.50 an hour in the Bloomington area, compared with $27.41 nationally. The 25th to 75th percentile range is $25.64 to $32.33.

+What do basic and premium concrete slab work cost in Bloomington?

For 400 sq ft, basic work runs $2,500 to $3,550 and premium work $4,100 to $5,200. Basic means: 4-inch broom-finish slab, light mesh, easy truck access. Premium means: 6-inch slab, heavy reinforcement, thick base, pump truck or tight access.

+When is the best time to pour a concrete slab in Bloomington?

Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are April through October. August and September are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.

+What does "add rebar reinforcement" add in Bloomington?

$410 to $1,200 for 400 sq ft, from a national range scaled by the local wage and goods indexes.

Concrete slab near Bloomington

Concrete slab: all pricesConcrete slab in IndianaAll projects in BloomingtonIndiana cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.