Statewide estimate from BLS wages and BEA prices. Reviewed Nov 4, 2026.

Statewide range (400 sq ft)
$3,400 – $6,900
Per sq ft
$8.35 – $16
before permit
Versus US midpoint
+34%
US $3,850
Metros covered
2

What does it cost to pour a concrete slab in Hawaii? Plan on $3,400 to $6,900 for 400 sq ft. Wages (1.67x the US blend), materials (price index 111.6) and permit costs (110.0) put the state above the national midpoint by 34%.

Inside Hawaii, the metros we cover range from $5,200 (Honolulu) to $5,300 (Kahului) at the midpoint.

Estimate your concrete slab cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

4-5 inch slab with rebar or heavier mesh and standard base prep

Add-ons

Estimated cost for 400 sq ft in Hawaii (statewide), standard level

$4,450 to $5,850

About $10.50 to $14 per sq ft before permits. Labor is about 52% of the bill.

Cost breakdown
PartLowHigh
Materials$1,850$2,600
Labor$2,400$2,950
Permits and fees$170$320
Total$4,450$5,850
Save and get a PDF report

Cost breakdown for 400 sq ft in Hawaii

Part of the jobLowMidpointHighShare
Materials$1,350$2,250$3,10043%
Labor$2,000$2,650$3,35052%
Permits and fees$55$250$4405%
Total$3,400$5,150$6,900100%

If you are planning more than one job in Hawaii

The table prices neighboring jobs at their usual sizes using statewide Hawaii wages and prices. Against national midpoints, concrete driveway comes out highest (+49%) and detached garage lowest (+29%), because each job leans on different trades.

Related projects with local prices
ProjectSizeRangevs. US
Concrete driveway600 sq ft$5,300 – $13,900+49%
Concrete patio300 sq ft$1,650 – $5,700+40%
Detached garage576 sq ft$37,400 – $75,100+29%
Stamped concrete400 sq ft$4,450 – $11,200+39%
Asphalt driveway600 sq ft$4,200 – $10,800+44%
Gravel driveway1,000 sq ft$3,650 – $14,700+45%

Weather windows across Hawaii

Season matters for concrete slab. For each Hawaii metro below we took NOAA's 1991-2020 monthly normals from the nearest suitable station and counted comfortable months for pouring concrete.

Honolulu has the longest comfortable season of the metros we cover in Hawaii at 12 months; Kahului has the shortest at 10 (October through July). Rainfall runs from 16 inches a year in Kahului to 16 inches in Honolulu.

We do not adjust prices by month, because we have no reliable published data on seasonal pricing. Timing is still worth raising when you collect bids.

Climate by metro (NOAA 1991-2020 normals)
MetroJan avg low °FJul avg high °FPrecip (in/yr)Comfortable months
Honolulu67881612: all year
Kahului64891610: October through July

Optional extras in Hawaii

Extras are quoted nationally and then scaled to Hawaii by the average of the local wage index (1.67) and goods index (1.12), a factor of 1.39. Tick any of them in the estimator above to add them to your total. Treat these as planning figures: an add-on touches different trades than the main job, so the scaling is an approximation.

Add-on prices
Add-onLocal range
Add rebar reinforcement$560 – $1,650
Remove old concrete first$1,100 – $3,350

Concrete slab: what moves the price in Hawaii

  • Thickness and mix

    A 4-inch slab uses about 1.23 cubic yards of concrete per 100 sq ft; a 6-inch slab uses about 1.85. Stepping up from a 3,000 PSI to a 4,000-4,500 PSI mix adds $10-$40 per cubic yard (Estimators.us).

  • Base and reinforcement

    A compacted gravel base, vapor barrier, and wire mesh or rebar are priced separately by some contractors and bundled by others. Ask which one your quote does.

  • Truck and pump access

    If the mixer truck can't back up to the forms, someone has to wheelbarrow it in or hire a pump. Pump or line-pump hire is typically billed per day.

  • Small-job minimums

    Many crews have a minimum charge, so a 10x10 pad can cost more per square foot than a 20x20 slab.

  • Finish

    A broom finish is the baseline. Stamped, stained, or exposed-aggregate finishes are priced as add-ons on top of the slab.

Hawaii against its neighbors

Hawaii ranks 1 of 51 (the 50 states plus DC) for concrete slab, where 1 is the most expensive. The costliest is Hawaii at $5,150 and the cheapest Arkansas at $3,350, both for 400 sq ft at the midpoint. Hawaii sits at $5,150. The five states closest by workforce center are listed below.

States near Hawaii, same project and size
StateDistanceRangeMidpointvs. here
California2530 miles away$2,750 – $5,800$4,300−16%
Oregon2590 miles away$2,700 – $5,650$4,200−19%
Washington2710 miles away$2,850 – $5,950$4,400−14%
Nevada2730 miles away$2,500 – $5,250$3,850−25%
Alaska2850 miles away$3,050 – $6,250$4,650−10%

Quality levels and sizes in Hawaii

The cited range is cut into three overlapping bands (basic, standard and premium) and scaled to statewide Hawaii wages and prices. The grid prices the same bands at 5 common sizes.

Basic

$3,400 to $4,800

4-inch broom-finish slab, light mesh, easy truck access

Standard

$4,450 to $5,850

4-5 inch slab with rebar or heavier mesh and standard base prep

Premium

$5,500 to $6,900

6-inch slab, heavy reinforcement, thick base, pump truck or tight access

Cost by size and quality level
SizeBasicStandardPremium
10x10 pad (100 sq ft)$890 – $1,350$1,250 – $1,700$1,600 – $2,050
12x12 (144 sq ft)$1,250 – $1,850$1,700 – $2,300$2,150 – $2,750
20x20 (400 sq ft)$3,400 – $4,800$4,450 – $5,850$5,500 – $6,900
24x24 garage floor (576 sq ft)$4,850 – $6,800$6,300 – $8,250$7,800 – $9,750
30x40 foundation (1,200 sq ft)$10,100 – $14,000$13,000 – $16,900$15,900 – $19,800

Hawaii metro-by-metro prices

2 of the 2 metros sit above the statewide midpoint of $5,150, and the top-to-bottom gap is 2%. Each row prices the default size with that metro's own BLS wages and BEA price levels, so the gap between rows is real local variation rather than a flat markup.

MetroRange (400 sq ft)Midpointvs. state
Kahului, HI$3,500 – $7,100$5,300+3%
Honolulu, HI$3,450 – $6,950$5,200+1%

Hawaii labor market for concrete slab

Statewide wages come from BLS's state-level estimates, which blend big cities with small towns and rural areas. 4 trades drive the labor line for this job, and the weighted ratio against the national wage level is 1.67 for Hawaii.

For cement masons and concrete finishers (47-2051, weighted 50%) the local median is $46.10 an hour, which is 68% above the national $27.41. The middle half of them earn between $32.36 and $47.69 an hour. BLS counts 650 of them working in the state, 10.4 for every 10,000 jobs (US: 13.3), so the local bench is thinner than average.

Construction laborers (47-2061), 30% of the weighting: a median of $37.07 an hour, 64% above the US median of $22.66. The middle half of them earn between $25.13 and $42.19 an hour. About 4,580 work in the state. That is 73.0 per 10,000 jobs, compared with 70.5 nationally, so the supply of crews looks typical.

For operating engineers and other construction equipment operators (47-2073, weighted 10%) the local median is $55.70 an hour, which is 94% above the national $28.78. The middle half of them earn between $35.19 and $58.55 an hour. BLS counts 2,380 of them working in the state, 37.9 for every 10,000 jobs (US: 30.7), so the local bench is deeper than average.

For carpenters (47-2031, weighted 10%) the local median is $41.00 an hour, which is 41% above the national $29.12. The middle half of them earn between $31.91 and $53.36 an hour. BLS counts 4,810 of them working in the state, 76.6 for every 10,000 jobs (US: 43.1), so the local bench is deeper than average.

A crew paid at the 75th percentile for cement masons and concrete finishers ($47.69 an hour) would add about $45 to the statewide midpoint; one at the 25th percentile ($32.36) would take off about $400. Use that as a rough guide to how far a bid can sit from our midpoint on wages alone.

BLS counts 627,530 jobs across Hawaii (May 2025), which is 0.4% of US employment.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Cement masons and concrete finishers (47-2051)50%$32.36$46.10$47.69$27.411.68state
Construction laborers (47-2061)30%$25.13$37.07$42.19$22.661.64state
Operating engineers and other construction equipment operators (47-2073)10%$35.19$55.70$58.55$28.781.94state
Carpenters (47-2031)10%$31.91$41.00$53.36$29.121.41state
Blended100%1.67

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $4,450 to $5,850 for Hawaii is attached.

A detailed PDF report of this estimate, $9

Multi-page report for Hawaii: low, typical and high cost, a line-item breakdown of materials and labor by trade, permit notes, the best months to schedule, a quote comparison sheet, red flags, questions for contractors, checklists and every source. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Concrete slab in Hawaii: your questions

+How much does it cost to pour a concrete slab in Hawaii?

$3,400 to $6,900 for 400 sq ft, using statewide wages and prices. Metro areas inside Hawaii can sit above or below that.

+Which city in Hawaii is cheapest for concrete slab?

Honolulu at about $5,200 (midpoint, 400 sq ft). The priciest is Kahului at $5,300.

+Is concrete slab cheaper in Hawaii than the US average?

It is 34% more expensive: $5,150 against $3,850 for 400 sq ft at the midpoint.

+What share of the price is labor in Hawaii?

About 52% ($2,650). Materials are 43%. Statewide labor for this job is weighted 1.67x the national wage level.

+Does a concrete slab need a permit?

Often yes if it's structural (a garage floor or foundation) and often no for a small at-grade pad. Permit fees run $50-$400 depending on the city (HomeGuide).

+What do cement masons and concrete finishers earn in Hawaii?

The BLS statewide median is $46.10 an hour, against $27.41 for the US. The 25th to 75th percentile range is $32.36 to $47.69.

+Where does Hawaii rank for concrete slab costs?

1st most expensive of 51 (the 50 states plus DC) at the midpoint, $5,150 for 400 sq ft. Rank 1 is the costliest.

+What do basic and premium concrete slab work cost in Hawaii?

For 400 sq ft, basic work runs $3,400 to $4,800 and premium work $5,500 to $6,900. Basic means: 4-inch broom-finish slab, light mesh, easy truck access. Premium means: 6-inch slab, heavy reinforcement, thick base, pump truck or tight access.

+Does the season matter for concrete slab in Hawaii?

Yes where winters or summers are hard. Of the Hawaii metros we cover, Honolulu has the most comfortable months (12 of 12) based on NOAA 1991-2020 normals. Our prices do not change by month, so ask contractors whether they charge more or less in busy and slow seasons.

+What does "add rebar reinforcement" add in Hawaii?

$560 to $1,650 for 400 sq ft, from a national range scaled by the statewide wage and goods indexes.

Concrete slab by city in Hawaii

Concrete slab: all pricesHawaii cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.