Concrete slab cost in Hawaii
Statewide estimate from BLS wages and BEA prices. Reviewed Nov 4, 2026.
- Statewide range (400 sq ft)
- $3,400 – $6,900
- Per sq ft
- $8.35 – $16
- before permit
- Versus US midpoint
- +34%
- US $3,850
- Metros covered
- 2
What does it cost to pour a concrete slab in Hawaii? Plan on $3,400 to $6,900 for 400 sq ft. Wages (1.67x the US blend), materials (price index 111.6) and permit costs (110.0) put the state above the national midpoint by 34%.
Inside Hawaii, the metros we cover range from $5,200 (Honolulu) to $5,300 (Kahului) at the midpoint.
Estimate your concrete slab cost
Pick a size, a quality level and where you live. Prices update as you type.
Estimated cost for 400 sq ft in Hawaii (statewide), standard level
$4,450 to $5,850
About $10.50 to $14 per sq ft before permits. Labor is about 52% of the bill.
| Part | Low | High |
|---|---|---|
| Materials | $1,850 | $2,600 |
| Labor | $2,400 | $2,950 |
| Permits and fees | $170 | $320 |
| Total | $4,450 | $5,850 |
Cost breakdown for 400 sq ft in Hawaii
| Part of the job | Low | Midpoint | High | Share |
|---|---|---|---|---|
| Materials | $1,350 | $2,250 | $3,100 | 43% |
| Labor | $2,000 | $2,650 | $3,350 | 52% |
| Permits and fees | $55 | $250 | $440 | 5% |
| Total | $3,400 | $5,150 | $6,900 | 100% |
If you are planning more than one job in Hawaii
The table prices neighboring jobs at their usual sizes using statewide Hawaii wages and prices. Against national midpoints, concrete driveway comes out highest (+49%) and detached garage lowest (+29%), because each job leans on different trades.
| Project | Size | Range | vs. US |
|---|---|---|---|
| Concrete driveway | 600 sq ft | $5,300 – $13,900 | +49% |
| Concrete patio | 300 sq ft | $1,650 – $5,700 | +40% |
| Detached garage | 576 sq ft | $37,400 – $75,100 | +29% |
| Stamped concrete | 400 sq ft | $4,450 – $11,200 | +39% |
| Asphalt driveway | 600 sq ft | $4,200 – $10,800 | +44% |
| Gravel driveway | 1,000 sq ft | $3,650 – $14,700 | +45% |
Weather windows across Hawaii
Season matters for concrete slab. For each Hawaii metro below we took NOAA's 1991-2020 monthly normals from the nearest suitable station and counted comfortable months for pouring concrete.
Honolulu has the longest comfortable season of the metros we cover in Hawaii at 12 months; Kahului has the shortest at 10 (October through July). Rainfall runs from 16 inches a year in Kahului to 16 inches in Honolulu.
We do not adjust prices by month, because we have no reliable published data on seasonal pricing. Timing is still worth raising when you collect bids.
| Metro | Jan avg low °F | Jul avg high °F | Precip (in/yr) | Comfortable months |
|---|---|---|---|---|
| Honolulu | 67 | 88 | 16 | 12: all year |
| Kahului | 64 | 89 | 16 | 10: October through July |
Optional extras in Hawaii
Extras are quoted nationally and then scaled to Hawaii by the average of the local wage index (1.67) and goods index (1.12), a factor of 1.39. Tick any of them in the estimator above to add them to your total. Treat these as planning figures: an add-on touches different trades than the main job, so the scaling is an approximation.
| Add-on | Local range |
|---|---|
| Add rebar reinforcement | $560 – $1,650 |
| Remove old concrete first | $1,100 – $3,350 |
Concrete slab: what moves the price in Hawaii
Thickness and mix
A 4-inch slab uses about 1.23 cubic yards of concrete per 100 sq ft; a 6-inch slab uses about 1.85. Stepping up from a 3,000 PSI to a 4,000-4,500 PSI mix adds $10-$40 per cubic yard (Estimators.us).
Base and reinforcement
A compacted gravel base, vapor barrier, and wire mesh or rebar are priced separately by some contractors and bundled by others. Ask which one your quote does.
Truck and pump access
If the mixer truck can't back up to the forms, someone has to wheelbarrow it in or hire a pump. Pump or line-pump hire is typically billed per day.
Small-job minimums
Many crews have a minimum charge, so a 10x10 pad can cost more per square foot than a 20x20 slab.
Finish
A broom finish is the baseline. Stamped, stained, or exposed-aggregate finishes are priced as add-ons on top of the slab.
Hawaii against its neighbors
Hawaii ranks 1 of 51 (the 50 states plus DC) for concrete slab, where 1 is the most expensive. The costliest is Hawaii at $5,150 and the cheapest Arkansas at $3,350, both for 400 sq ft at the midpoint. Hawaii sits at $5,150. The five states closest by workforce center are listed below.
| State | Distance | Range | Midpoint | vs. here |
|---|---|---|---|---|
| California | 2530 miles away | $2,750 – $5,800 | $4,300 | −16% |
| Oregon | 2590 miles away | $2,700 – $5,650 | $4,200 | −19% |
| Washington | 2710 miles away | $2,850 – $5,950 | $4,400 | −14% |
| Nevada | 2730 miles away | $2,500 – $5,250 | $3,850 | −25% |
| Alaska | 2850 miles away | $3,050 – $6,250 | $4,650 | −10% |
Quality levels and sizes in Hawaii
The cited range is cut into three overlapping bands (basic, standard and premium) and scaled to statewide Hawaii wages and prices. The grid prices the same bands at 5 common sizes.
Basic
$3,400 to $4,800
4-inch broom-finish slab, light mesh, easy truck access
Standard
$4,450 to $5,850
4-5 inch slab with rebar or heavier mesh and standard base prep
Premium
$5,500 to $6,900
6-inch slab, heavy reinforcement, thick base, pump truck or tight access
| Size | Basic | Standard | Premium |
|---|---|---|---|
| 10x10 pad (100 sq ft) | $890 – $1,350 | $1,250 – $1,700 | $1,600 – $2,050 |
| 12x12 (144 sq ft) | $1,250 – $1,850 | $1,700 – $2,300 | $2,150 – $2,750 |
| 20x20 (400 sq ft) | $3,400 – $4,800 | $4,450 – $5,850 | $5,500 – $6,900 |
| 24x24 garage floor (576 sq ft) | $4,850 – $6,800 | $6,300 – $8,250 | $7,800 – $9,750 |
| 30x40 foundation (1,200 sq ft) | $10,100 – $14,000 | $13,000 – $16,900 | $15,900 – $19,800 |
Hawaii metro-by-metro prices
2 of the 2 metros sit above the statewide midpoint of $5,150, and the top-to-bottom gap is 2%. Each row prices the default size with that metro's own BLS wages and BEA price levels, so the gap between rows is real local variation rather than a flat markup.
| Metro | Range (400 sq ft) | Midpoint | vs. state |
|---|---|---|---|
| Kahului, HI | $3,500 – $7,100 | $5,300 | +3% |
| Honolulu, HI | $3,450 – $6,950 | $5,200 | +1% |
Hawaii labor market for concrete slab
Statewide wages come from BLS's state-level estimates, which blend big cities with small towns and rural areas. 4 trades drive the labor line for this job, and the weighted ratio against the national wage level is 1.67 for Hawaii.
For cement masons and concrete finishers (47-2051, weighted 50%) the local median is $46.10 an hour, which is 68% above the national $27.41. The middle half of them earn between $32.36 and $47.69 an hour. BLS counts 650 of them working in the state, 10.4 for every 10,000 jobs (US: 13.3), so the local bench is thinner than average.
Construction laborers (47-2061), 30% of the weighting: a median of $37.07 an hour, 64% above the US median of $22.66. The middle half of them earn between $25.13 and $42.19 an hour. About 4,580 work in the state. That is 73.0 per 10,000 jobs, compared with 70.5 nationally, so the supply of crews looks typical.
For operating engineers and other construction equipment operators (47-2073, weighted 10%) the local median is $55.70 an hour, which is 94% above the national $28.78. The middle half of them earn between $35.19 and $58.55 an hour. BLS counts 2,380 of them working in the state, 37.9 for every 10,000 jobs (US: 30.7), so the local bench is deeper than average.
For carpenters (47-2031, weighted 10%) the local median is $41.00 an hour, which is 41% above the national $29.12. The middle half of them earn between $31.91 and $53.36 an hour. BLS counts 4,810 of them working in the state, 76.6 for every 10,000 jobs (US: 43.1), so the local bench is deeper than average.
A crew paid at the 75th percentile for cement masons and concrete finishers ($47.69 an hour) would add about $45 to the statewide midpoint; one at the 25th percentile ($32.36) would take off about $400. Use that as a rough guide to how far a bid can sit from our midpoint on wages alone.
BLS counts 627,530 jobs across Hawaii (May 2025), which is 0.4% of US employment.
| Trade | Weight | 25th pct | Median | 75th pct | US median | Ratio | Level used |
|---|---|---|---|---|---|---|---|
| Cement masons and concrete finishers (47-2051) | 50% | $32.36 | $46.10 | $47.69 | $27.41 | 1.68 | state |
| Construction laborers (47-2061) | 30% | $25.13 | $37.07 | $42.19 | $22.66 | 1.64 | state |
| Operating engineers and other construction equipment operators (47-2073) | 10% | $35.19 | $55.70 | $58.55 | $28.78 | 1.94 | state |
| Carpenters (47-2031) | 10% | $31.91 | $41.00 | $53.36 | $29.12 | 1.41 | state |
| Blended | 100% | 1.67 | |||||
Get 3 local quotes
Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $4,450 to $5,850 for Hawaii is attached.
A detailed PDF report of this estimate, $9
Multi-page report for Hawaii: low, typical and high cost, a line-item breakdown of materials and labor by trade, permit notes, the best months to schedule, a quote comparison sheet, red flags, questions for contractors, checklists and every source. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.
Concrete slab in Hawaii: your questions
+How much does it cost to pour a concrete slab in Hawaii?
$3,400 to $6,900 for 400 sq ft, using statewide wages and prices. Metro areas inside Hawaii can sit above or below that.
+Which city in Hawaii is cheapest for concrete slab?
Honolulu at about $5,200 (midpoint, 400 sq ft). The priciest is Kahului at $5,300.
+Is concrete slab cheaper in Hawaii than the US average?
It is 34% more expensive: $5,150 against $3,850 for 400 sq ft at the midpoint.
+What share of the price is labor in Hawaii?
About 52% ($2,650). Materials are 43%. Statewide labor for this job is weighted 1.67x the national wage level.
+Does a concrete slab need a permit?
Often yes if it's structural (a garage floor or foundation) and often no for a small at-grade pad. Permit fees run $50-$400 depending on the city (HomeGuide).
+What do cement masons and concrete finishers earn in Hawaii?
The BLS statewide median is $46.10 an hour, against $27.41 for the US. The 25th to 75th percentile range is $32.36 to $47.69.
+Where does Hawaii rank for concrete slab costs?
1st most expensive of 51 (the 50 states plus DC) at the midpoint, $5,150 for 400 sq ft. Rank 1 is the costliest.
+What do basic and premium concrete slab work cost in Hawaii?
For 400 sq ft, basic work runs $3,400 to $4,800 and premium work $5,500 to $6,900. Basic means: 4-inch broom-finish slab, light mesh, easy truck access. Premium means: 6-inch slab, heavy reinforcement, thick base, pump truck or tight access.
+Does the season matter for concrete slab in Hawaii?
Yes where winters or summers are hard. Of the Hawaii metros we cover, Honolulu has the most comfortable months (12 of 12) based on NOAA 1991-2020 normals. Our prices do not change by month, so ask contractors whether they charge more or less in busy and slow seasons.
+What does "add rebar reinforcement" add in Hawaii?
$560 to $1,650 for 400 sq ft, from a national range scaled by the statewide wage and goods indexes.
Concrete slab by city in Hawaii
Where these numbers come from
Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.
- HomeGuide: How Much Does a Concrete Slab Cost? (2026) (accessed November 4, 2026)
- Estimators.us: Concrete Slab Cost in 2026 | $6-$12/Sq Ft Guide (accessed November 4, 2026)
- HomeGuide: How Much Does a Concrete Patio Cost? (2026) (accessed November 4, 2026)
- HomeGuide: How Much Does a Concrete Driveway Cost? (2026) (accessed November 4, 2026)
- BLS Occupational Employment and Wage Statistics, May 2025
- BEA Regional Price Parities, 2024
- NOAA NCEI U.S. Climate Normals, 1991-2020