Skip to content
CostLocal

Concrete slab cost in Oregon

Statewide estimate from BLS wages and BEA prices. Reviewed Nov 4, 2026.

Statewide range (400 sq ft)
$2,700 – $5,650
Per sq ft
$6.60 – $13
before permit
Versus US midpoint
+9%
US $3,850
Metros covered
5

What does it cost to pour a concrete slab in Oregon? Plan on $2,700 to $5,650 for 400 sq ft. Wages (1.15x the US blend), materials (price index 105.3) and permit costs (103.4) put the state above the national midpoint by 9%.

Inside Oregon, the metros we cover range from $4,000 (Eugene) to $4,350 (Portland) at the midpoint. Pick your closest city in the table for a tighter number.

Estimate your concrete slab cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

4-5 inch slab with rebar or heavier mesh and standard base prep

Add-ons

Estimated cost for 400 sq ft in Oregon (statewide), standard level

$3,600 to $4,750

About $8.55 to $11 per sq ft before permits. Labor is about 44% of the bill.

Cost breakdown
PartLowHigh
Materials$1,750$2,450
Labor$1,650$2,050
Permits and fees$160$300
Total$3,600$4,750
Save and get a PDF report

Cost breakdown for 400 sq ft in Oregon

Part of the jobLowMidpointHighShare
Materials$1,250$2,100$2,95050%
Labor$1,400$1,850$2,30044%
Permits and fees$50$230$4106%
Total$2,700$4,200$5,650100%

What cement masons and concrete finishers and the other trades earn in Oregon

Oregon's labor line is priced from 4 trades, each compared with its US median wage. After weighting by each trade's share of the work, the state comes out at 1.15 times the national level.

Cement masons and concrete finishers (47-2051), 50% of the weighting: a median of $32.95 an hour, 20% above the US median of $27.41. The middle half of them earn between $27.85 and $39.84 an hour. About 2,170 work in the state. That is 11.0 per 10,000 jobs, compared with 13.3 nationally, so expect fewer local crews to bid.

For construction laborers (47-2061, weighted 30%) the local median is $24.45 an hour, which is 8% above the national $22.66. The middle half of them earn between $21.65 and $29.91 an hour. BLS counts 12,620 of them working in the state, 64.2 for every 10,000 jobs (US: 70.5), so the local bench is about average.

Operating engineers and other construction equipment operators (47-2073), 10% of the weighting: a median of $35.30 an hour, 23% above the US median of $28.78. The middle half of them earn between $29.42 and $47.04 an hour. About 5,630 work in the state. That is 28.6 per 10,000 jobs, compared with 30.7 nationally, so the supply of crews looks typical.

Carpenters (47-2031), 10% of the weighting: a median of $30.23 an hour, 4% above the US median of $29.12. The middle half of them earn between $24.26 and $44.89 an hour. About 15,110 work in the state. That is 76.8 per 10,000 jobs, compared with 43.1 nationally, which suggests plenty of local crews to bid.

A crew paid at the 75th percentile for cement masons and concrete finishers ($39.84 an hour) would add about $200 to the statewide midpoint; one at the 25th percentile ($27.85) would take off about $150. Use that as a rough guide to how far a bid can sit from our midpoint on wages alone.

BLS counts 1,967,130 jobs across Oregon (May 2025), which is 1.3% of US employment.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Cement masons and concrete finishers (47-2051)50%$27.85$32.95$39.84$27.411.20state
Construction laborers (47-2061)30%$21.65$24.45$29.91$22.661.08state
Operating engineers and other construction equipment operators (47-2073)10%$29.42$35.30$47.04$28.781.23state
Carpenters (47-2031)10%$24.26$30.23$44.89$29.121.04state
Blended100%1.15

Basic, standard or premium: Oregon prices

Bands overlap on purpose, since a good standard job can cost as much as a light premium one. Below are the three bands for the default size, then a grid from 10x10 pad (100 sq ft) to 30x40 foundation (1,200 sq ft).

Basic

$2,700 to $3,900

4-inch broom-finish slab, light mesh, easy truck access

Standard

$3,600 to $4,750

4-5 inch slab with rebar or heavier mesh and standard base prep

Premium

$4,500 to $5,650

6-inch slab, heavy reinforcement, thick base, pump truck or tight access

Cost by size and quality level
SizeBasicStandardPremium
10x10 pad (100 sq ft)$710 – $1,100$1,000 – $1,400$1,300 – $1,750
12x12 (144 sq ft)$1,000 – $1,500$1,400 – $1,900$1,800 – $2,300
20x20 (400 sq ft)$2,700 – $3,900$3,600 – $4,750$4,500 – $5,650
24x24 garage floor (576 sq ft)$3,850 – $5,500$5,100 – $6,750$6,350 – $7,950
30x40 foundation (1,200 sq ft)$8,000 – $11,300$10,400 – $13,700$12,900 – $16,200

If you are planning more than one job in Oregon

Each project weights the trades differently, so Oregon's wage level does not push every price by the same amount. Compared with the US midpoint, concrete driveway is +12% and detached garage +9%.

Related projects with local prices
ProjectSizeRangevs. US
Concrete driveway600 sq ft$4,050 – $10,300+12%
Concrete patio300 sq ft$1,350 – $4,400+10%
Detached garage576 sq ft$31,600 – $63,400+9%
Stamped concrete400 sq ft$3,600 – $8,800+11%
Asphalt driveway600 sq ft$3,350 – $8,150+10%
Gravel driveway1,000 sq ft$2,750 – $11,200+10%

Oregon against its neighbors

Oregon ranks 8 of 51 (the 50 states plus DC) for concrete slab, where 1 is the most expensive. The costliest is Hawaii at $5,150 and the cheapest Arkansas at $3,350, both for 400 sq ft at the midpoint. Oregon sits at $4,200. The five states closest by workforce center are listed below.

States near Oregon, same project and size
StateDistanceRangeMidpointvs. here
Washington170 miles away$2,850 – $5,950$4,400+6%
Idaho350 miles away$2,400 – $5,050$3,700−11%
Montana550 miles away$2,450 – $5,200$3,850−8%
Utah600 miles away$2,400 – $5,050$3,700−11%
Nevada660 miles away$2,500 – $5,250$3,850−8%

Extras that change the Oregon total

Add-ons start from national price ranges and are scaled by 1.10 for Oregon, which is the average of the area's wage index (1.15) and goods price index (1.05). The estimator above can add them to your total.

Add-on prices
Add-onLocal range
Add rebar reinforcement$440 – $1,300
Remove old concrete first$880 – $2,650

Oregon seasons and concrete slab

Weather decides when pouring concrete can happen, and Oregon is not uniform. The table uses NOAA's 1991-2020 climate normals from the weather station nearest each metro we cover, and counts the months that are neither cold nor hot enough to complicate the job.

Portland has the longest comfortable season of the metros we cover in Oregon at 8 months (April through November); Bend has the shortest at 4 (June through September). Rainfall runs from 11 inches a year in Bend to 41 inches in Eugene.

We do not adjust prices by month, because we have no reliable published data on seasonal pricing. Timing is still worth raising when you collect bids.

Climate by metro (NOAA 1991-2020 normals)
MetroJan avg low °FJul avg high °FPrecip (in/yr)Comfortable months
Portland3682378: April through November
Salem3684407: April through October
Eugene3584416: May through October
Bend2584114: June through September
Medford3392185: April through June and September through October

Why two Oregon quotes can differ

  • Thickness and mix

    A 4-inch slab uses about 1.23 cubic yards of concrete per 100 sq ft; a 6-inch slab uses about 1.85. Stepping up from a 3,000 PSI to a 4,000-4,500 PSI mix adds $10-$40 per cubic yard (Estimators.us).

  • Base and reinforcement

    A compacted gravel base, vapor barrier, and wire mesh or rebar are priced separately by some contractors and bundled by others. Ask which one your quote does.

  • Truck and pump access

    If the mixer truck can't back up to the forms, someone has to wheelbarrow it in or hire a pump. Pump or line-pump hire is typically billed per day.

  • Small-job minimums

    Many crews have a minimum charge, so a 10x10 pad can cost more per square foot than a 20x20 slab.

  • Finish

    A broom finish is the baseline. Stamped, stained, or exposed-aggregate finishes are priced as add-ons on top of the slab.

Concrete slab cost by metro in Oregon

2 of the 5 metros sit above the statewide midpoint of $4,200, and the top-to-bottom gap is 8%. Each row prices the default size with that metro's own BLS wages and BEA price levels, so the gap between rows is real local variation rather than a flat markup.

MetroRange (400 sq ft)Midpointvs. state
Portland, OR$2,800 – $5,900$4,350+4%
Salem, OR$2,700 – $5,700$4,200+1%
Bend, OR$2,650 – $5,600$4,150−1%
Medford, OR$2,600 – $5,450$4,050−4%
Eugene, OR$2,600 – $5,450$4,000−4%

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $3,600 to $4,750 for Oregon is attached.

A detailed PDF report of this estimate, $9

Multi-page report for Oregon: low, typical and high cost, a line-item breakdown of materials and labor by trade, permit notes, the best months to schedule, a quote comparison sheet, red flags, questions for contractors, checklists and every source. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Concrete slab in Oregon: your questions

+How much does it cost to pour a concrete slab in Oregon?

$2,700 to $5,650 for 400 sq ft, using statewide wages and prices. Metro areas inside Oregon can sit above or below that.

+Which city in Oregon is cheapest for concrete slab?

Eugene at about $4,000 (midpoint, 400 sq ft). The priciest is Portland at $4,350.

+Is concrete slab cheaper in Oregon than the US average?

It is 9% more expensive: $4,200 against $3,850 for 400 sq ft at the midpoint.

+What share of the price is labor in Oregon?

About 44% ($1,850). Materials are 50%. Statewide labor for this job is weighted 1.15x the national wage level.

+Does a concrete slab need a permit?

Often yes if it's structural (a garage floor or foundation) and often no for a small at-grade pad. Permit fees run $50-$400 depending on the city (HomeGuide).

+What do cement masons and concrete finishers earn in Oregon?

The BLS statewide median is $32.95 an hour, against $27.41 for the US. The 25th to 75th percentile range is $27.85 to $39.84.

+Where does Oregon rank for concrete slab costs?

8th most expensive of 51 (the 50 states plus DC) at the midpoint, $4,200 for 400 sq ft. Rank 1 is the costliest.

+What do basic and premium concrete slab work cost in Oregon?

For 400 sq ft, basic work runs $2,700 to $3,900 and premium work $4,500 to $5,650. Basic means: 4-inch broom-finish slab, light mesh, easy truck access. Premium means: 6-inch slab, heavy reinforcement, thick base, pump truck or tight access.

+Does the season matter for concrete slab in Oregon?

Yes where winters or summers are hard. Of the Oregon metros we cover, Portland has the most comfortable months (8 of 12) based on NOAA 1991-2020 normals. Our prices do not change by month, so ask contractors whether they charge more or less in busy and slow seasons.

+What does "add rebar reinforcement" add in Oregon?

$440 to $1,300 for 400 sq ft, from a national range scaled by the statewide wage and goods indexes.

Concrete slab by city in Oregon

Concrete slab: all pricesOregon cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.