Skip to content
CostLocal

Concrete driveway cost in Oregon

Statewide estimate from BLS wages and BEA prices. Reviewed Nov 4, 2026.

Statewide range (600 sq ft)
$4,050 – $10,300
Per sq ft
$6.70 – $17
before permit
Versus US midpoint
+12%
US $6,450
Metros covered
5

Oregon prices for concrete driveway: $4,050 to $10,300 for 600 sq ft, or $6.70 to $17 per sq ft without the permit. The state midpoint is 12% above the national one. Local wages for cement masons and concrete finishers are $32.95 an hour.

Inside Oregon, the metros we cover range from $6,750 (Eugene) to $7,650 (Portland) at the midpoint. Pick your closest city in the table for a tighter number.

Estimate your concrete driveway cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

5-inch with rebar and saw-cut joints, a border or one color

Add-ons

Estimated cost for 600 sq ft in Oregon (statewide), standard level

$5,950 to $8,450

About $9.75 to $14 per sq ft before permits. Labor is about 71% of the bill.

Cost breakdown
PartLowHigh
Materials$1,750$2,200
Labor$4,050$6,100
Permits and fees$100$160
Total$5,950$8,450
Save and get a PDF report

Cost breakdown for 600 sq ft in Oregon

Part of the jobLowMidpointHighShare
Materials$1,450$2,000$2,55028%
Labor$2,550$5,100$7,60071%
Permits and fees$50$130$2102%
Total$4,050$7,200$10,300100%

Oregon against its neighbors

Oregon ranks 10 of 51 (the 50 states plus DC) for concrete driveway, where 1 is the most expensive. The costliest is Hawaii at $9,600 and the cheapest Mississippi at $5,400, both for 600 sq ft at the midpoint. Oregon sits at $7,200. The five states closest by workforce center are listed below.

States near Oregon, same project and size
StateDistanceRangeMidpointvs. here
Washington170 miles away$4,400 – $11,300$7,850+9%
Idaho350 miles away$3,550 – $9,000$6,250−13%
Montana550 miles away$3,700 – $9,450$6,600−8%
Utah600 miles away$3,550 – $8,950$6,250−13%
Nevada660 miles away$3,750 – $9,600$6,650−7%

Concrete driveway: what moves the price in Oregon

  • Thickness

    HomeGuide prices a standard 4-inch driveway at $6-$15/sq ft and a 6-inch one, recommended for heavy vehicles, at $8-$20/sq ft.

  • Old driveway removal

    Tearing out the old surface adds about $2-$6 per sq ft, and some cities want the haul-off documented.

  • Grading and drainage

    Professional grading runs $3-$8 per sq ft or $700-$2,500 for a typical job. A sloped lot or poor soil raises it.

  • Finish

    Decorative driveways run $10-$25 per sq ft installed: colors and borders at $10-$15, stamped patterns at $15-$20, and high-end finishes at $20-$25+ (HomeGuide).

  • Permits and the apron

    A driveway permit is typically $50-$200 and is often required for new work. The apron where the driveway meets the street can need a separate right-of-way permit.

Add-ons priced for Oregon

Extras are quoted nationally and then scaled to Oregon by the average of the local wage index (1.15) and goods index (1.05), a factor of 1.10. Tick any of them in the estimator above to add them to your total. Treat these as planning figures: an add-on touches different trades than the main job, so the scaling is an approximation.

Add-on prices
Add-onLocal range
Add rebar reinforcement$660 – $2,000
Remove the old driveway$1,300 – $3,950

Quality levels and sizes in Oregon

The cited range is cut into three overlapping bands (basic, standard and premium) and scaled to statewide Oregon wages and prices. The grid prices the same bands at 4 common sizes.

Basic

$4,050 to $6,550

Plain gray, 4-inch broom finish, flat site

Standard

$5,950 to $8,450

5-inch with rebar and saw-cut joints, a border or one color

Premium

$7,800 to $10,300

6-inch for heavy vehicles, stamped or colored, grading needed

Cost by size and quality level
SizeBasicStandardPremium
1-car (12x20), 240 sq ft$1,650 – $2,700$2,450 – $3,500$3,200 – $4,250
2-car (20x24), 480 sq ft$3,250 – $5,300$4,750 – $6,800$6,300 – $8,300
2-car + apron (600 sq ft)$4,050 – $6,550$5,950 – $8,450$7,800 – $10,300
3-car (900 sq ft)$6,050 – $9,800$8,850 – $12,600$11,700 – $15,400

Other Oregon jobs that often go with concrete driveway

The table prices neighboring jobs at their usual sizes using statewide Oregon wages and prices. Against national midpoints, paver patio comes out highest (+11%) and concrete slab lowest (+9%), because each job leans on different trades.

Related projects with local prices
ProjectSizeRangevs. US
Asphalt driveway600 sq ft$3,350 – $8,150+10%
Gravel driveway1,000 sq ft$2,750 – $11,200+10%
Concrete slab400 sq ft$2,700 – $5,650+9%
Stamped concrete400 sq ft$3,600 – $8,800+11%
Paver patio300 sq ft$3,350 – $6,050+11%
Concrete patio300 sq ft$1,350 – $4,400+10%

When Oregon weather lets you pour

Season matters for concrete driveway. For each Oregon metro below we took NOAA's 1991-2020 monthly normals from the nearest suitable station and counted comfortable months for pouring concrete.

Portland has the longest comfortable season of the metros we cover in Oregon at 8 months (April through November); Bend has the shortest at 4 (June through September). Rainfall runs from 11 inches a year in Bend to 41 inches in Eugene.

We do not adjust prices by month, because we have no reliable published data on seasonal pricing. Timing is still worth raising when you collect bids.

Climate by metro (NOAA 1991-2020 normals)
MetroJan avg low °FJul avg high °FPrecip (in/yr)Comfortable months
Portland3682378: April through November
Salem3684407: April through October
Eugene3584416: May through October
Bend2584114: June through September
Medford3392185: April through June and September through October

Oregon labor market for concrete driveway

Statewide wages come from BLS's state-level estimates, which blend big cities with small towns and rural areas. 4 trades drive the labor line for this job, and the weighted ratio against the national wage level is 1.15 for Oregon.

For cement masons and concrete finishers (47-2051, weighted 50%) the local median is $32.95 an hour, which is 20% above the national $27.41. The middle half of them earn between $27.85 and $39.84 an hour. BLS counts 2,170 of them working in the state, 11.0 for every 10,000 jobs (US: 13.3), so the local bench is thinner than average.

Construction laborers (47-2061), 30% of the weighting: a median of $24.45 an hour, 8% above the US median of $22.66. The middle half of them earn between $21.65 and $29.91 an hour. About 12,620 work in the state. That is 64.2 per 10,000 jobs, compared with 70.5 nationally, so the supply of crews looks typical.

For operating engineers and other construction equipment operators (47-2073, weighted 10%) the local median is $35.30 an hour, which is 23% above the national $28.78. The middle half of them earn between $29.42 and $47.04 an hour. BLS counts 5,630 of them working in the state, 28.6 for every 10,000 jobs (US: 30.7), so the local bench is about average.

For carpenters (47-2031, weighted 10%) the local median is $30.23 an hour, which is 4% above the national $29.12. The middle half of them earn between $24.26 and $44.89 an hour. BLS counts 15,110 of them working in the state, 76.8 for every 10,000 jobs (US: 43.1), so the local bench is deeper than average.

A crew paid at the 75th percentile for cement masons and concrete finishers ($39.84 an hour) would add about $550 to the statewide midpoint; one at the 25th percentile ($27.85) would take off about $410. Use that as a rough guide to how far a bid can sit from our midpoint on wages alone.

BLS counts 1,967,130 jobs across Oregon (May 2025), which is 1.3% of US employment.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Cement masons and concrete finishers (47-2051)50%$27.85$32.95$39.84$27.411.20state
Construction laborers (47-2061)30%$21.65$24.45$29.91$22.661.08state
Operating engineers and other construction equipment operators (47-2073)10%$29.42$35.30$47.04$28.781.23state
Carpenters (47-2031)10%$24.26$30.23$44.89$29.121.04state
Blended100%1.15

Which Oregon city is cheapest for concrete driveway?

2 of the 5 metros sit above the statewide midpoint of $7,200, and the top-to-bottom gap is 13%. Each row prices the default size with that metro's own BLS wages and BEA price levels, so the gap between rows is real local variation rather than a flat markup.

MetroRange (600 sq ft)Midpointvs. state
Portland, OR$4,300 – $11,000$7,650+7%
Salem, OR$4,100 – $10,400$7,250+1%
Bend, OR$4,000 – $10,200$7,100−1%
Medford, OR$3,850 – $9,700$6,800−6%
Eugene, OR$3,850 – $9,700$6,750−6%

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $5,950 to $8,450 for Oregon is attached.

A detailed PDF report of this estimate, $9

The report lays out the concrete driveway numbers for Oregon line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Concrete driveway in Oregon: your questions

+How much does it cost to pour a concrete driveway in Oregon?

$4,050 to $10,300 for 600 sq ft, using statewide wages and prices. Metro areas inside Oregon can sit above or below that.

+Which city in Oregon is cheapest for concrete driveway?

Eugene at about $6,750 (midpoint, 600 sq ft). The priciest is Portland at $7,650.

+Is concrete driveway cheaper in Oregon than the US average?

It is 12% more expensive: $7,200 against $6,450 for 600 sq ft at the midpoint.

+What share of the price is labor in Oregon?

About 71% ($5,100). Materials are 28%. Statewide labor for this job is weighted 1.15x the national wage level.

+What do cement masons and concrete finishers earn in Oregon?

The BLS statewide median is $32.95 an hour, against $27.41 for the US. The 25th to 75th percentile range is $27.85 to $39.84.

+Where does Oregon rank for concrete driveway costs?

10th most expensive of 51 (the 50 states plus DC) at the midpoint, $7,200 for 600 sq ft. Rank 1 is the costliest.

+What do basic and premium concrete driveway work cost in Oregon?

For 600 sq ft, basic work runs $4,050 to $6,550 and premium work $7,800 to $10,300. Basic means: plain gray, 4-inch broom finish, flat site. Premium means: 6-inch for heavy vehicles, stamped or colored, grading needed.

+Does the season matter for concrete driveway in Oregon?

Yes where winters or summers are hard. Of the Oregon metros we cover, Portland has the most comfortable months (8 of 12) based on NOAA 1991-2020 normals. Our prices do not change by month, so ask contractors whether they charge more or less in busy and slow seasons.

+What does "add rebar reinforcement" add in Oregon?

$660 to $2,000 for 600 sq ft, from a national range scaled by the statewide wage and goods indexes.

Concrete driveway by city in Oregon

Concrete driveway: all pricesOregon cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.