Concrete slab cost in Honolulu, HI
Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.
- Typical range (400 sq ft)
- $3,450 – $6,950
- Per sq ft
- $8.40 – $16.50
- before permit
- Versus US midpoint
- +36%
- US $3,850
- Rank of 300 metros
- #2
- 1 = most expensive
A concrete slab in Honolulu, HI usually costs $3,450 to $6,950 for 400 sq ft. That works out to about $8.40 to $16.50 per sq ft before permits. Compared with the national midpoint that is $1,350 more. Cement masons and concrete finishers earn a median of $46.28 an hour in the Honolulu area, 69% above the US median of $27.41.
Estimate your concrete slab cost
Pick a size, a quality level and where you live. Prices update as you type.
Estimated cost for 400 sq ft in Honolulu, HI, standard level
$4,500 to $5,900
About $11 to $14 per sq ft before permits. Labor is about 52% of the bill.
| Part | Low | High |
|---|---|---|
| Materials | $1,850 | $2,600 |
| Labor | $2,450 | $3,000 |
| Permits and fees | $170 | $330 |
| Total | $4,500 | $5,900 |
Cost breakdown for 400 sq ft in Honolulu, HI
| Part of the job | Low | Midpoint | High | Share |
|---|---|---|---|---|
| Materials | $1,350 | $2,250 | $3,100 | 43% |
| Labor | $2,050 | $2,700 | $3,400 | 52% |
| Permits and fees | $55 | $250 | $440 | 5% |
| Total | $3,450 | $5,200 | $6,950 | 100% |
What is behind the Honolulu number
The wage side of the estimate leans on cement masons and concrete finishers, who do 50% of the hours on a typical job. Their local median is $46.28 an hour. Add the other trades involved and the blended wage index for Honolulu is 1.69 (US = 1.00), which puts labor at 52% of the total.
Materials are scaled with BEA's regional price parity for goods. Honolulu is at 111.6 against 100 for the US, so a materials line of $2,000 nationally becomes $2,250 here (midpoint, 400 sq ft). Permits follow the all-items index of 111.0: $55 to $440.
Planning more than one job in Honolulu?
Jobs that often go together with concrete slab are priced below at their usual sizes, using the same Honolulu wage and price inputs. Compared with national midpoints, concrete driveway comes out highest (+51%) and detached garage lowest (+33%); the gap comes from the trades each job uses.
| Project | Size | Range | vs. US |
|---|---|---|---|
| Concrete driveway | 600 sq ft | $5,350 – $14,100 | +51% |
| Concrete patio | 300 sq ft | $1,650 – $5,750 | +41% |
| Detached garage | 576 sq ft | $38,600 – $77,300 | +33% |
| Stamped concrete | 400 sq ft | $4,450 – $11,200 | +40% |
| Asphalt driveway | 600 sq ft | $4,200 – $10,900 | +44% |
| Gravel driveway | 1,000 sq ft | $3,700 – $14,800 | +46% |
Add-ons priced for Honolulu
Add-ons start from national price ranges and are scaled by 1.40 for Honolulu, which is the average of the area's wage index (1.69) and goods price index (1.12). The estimator above can add them to your total.
| Add-on | Local range |
|---|---|
| Add rebar reinforcement | $560 – $1,700 |
| Remove old concrete first | $1,100 – $3,350 |
Cost by quality level and size in Honolulu
The cited range is split into basic, standard and premium bands, then scaled to Honolulu. Bands overlap, because plenty of standard jobs cost as much as a light premium one. Sizes run from 10x10 pad (100 sq ft) to 30x40 foundation (1,200 sq ft).
Basic
$3,450 to $4,850
4-inch broom-finish slab, light mesh, easy truck access
Standard
$4,500 to $5,900
4-5 inch slab with rebar or heavier mesh and standard base prep
Premium
$5,550 to $6,950
6-inch slab, heavy reinforcement, thick base, pump truck or tight access
| Size | Basic | Standard | Premium |
|---|---|---|---|
| 10x10 pad (100 sq ft) | $900 – $1,350 | $1,250 – $1,700 | $1,600 – $2,050 |
| 12x12 (144 sq ft) | $1,250 – $1,900 | $1,700 – $2,350 | $2,200 – $2,800 |
| 20x20 (400 sq ft) | $3,450 – $4,850 | $4,500 – $5,900 | $5,550 – $6,950 |
| 24x24 garage floor (576 sq ft) | $4,900 – $6,850 | $6,400 – $8,350 | $7,850 – $9,800 |
| 30x40 foundation (1,200 sq ft) | $10,200 – $14,100 | $13,100 – $17,000 | $16,000 – $20,000 |
Is Honolulu cheap or dear? The local comparison
Same job, same size (400 sq ft), priced for the nearest metros. Kahului is the priciest of the group at $5,300. Santa Cruz is the cheapest at $4,200.
| Area | Range | Midpoint | vs. here |
|---|---|---|---|
| Honolulu, HIthis page | $3,450 – $6,950 | $5,200 | |
| Kahului, HI110 miles | $3,500 – $7,100 | $5,300 | +2% |
| Santa Rosa, CA2395 miles | $2,800 – $5,850 | $4,300 | −17% |
| Santa Cruz, CA2415 miles | $2,700 – $5,700 | $4,200 | −19% |
| San Francisco, CA2415 miles | $3,150 – $6,450 | $4,800 | −7% |
| Napa, CA2425 miles | $2,900 – $6,000 | $4,450 | −14% |
| Hawaii (statewide) | $3,400 – $6,900 | $5,150 | −1% |
| United States | $2,450 – $5,200 | $3,850 | −26% |
Out of the 300 metros we cover, Honolulu ranks #2 for the cost of this job (#1 is the most expensive). Statewide, Honolulu is 1% above the Hawaii figure.
Elsewhere in Hawaii
| Metro | Size | Range | Midpoint | vs. here |
|---|---|---|---|---|
| Kahului, HI | 73,750 jobs | $3,500 – $7,100 | $5,300 | +2% |
Metros of a similar size
Big cities and small ones price differently, so here is Honolulu against the 4 metros with the closest total employment.
| Metro | Size | Range | Midpoint | vs. here |
|---|---|---|---|---|
| Albany, NY | 449,410 jobs | $2,600 – $5,450 | $4,000 | −22% |
| New Orleans, LA | 445,550 jobs | $2,200 – $4,700 | $3,450 | −34% |
| Tulsa, OK | 458,730 jobs | $2,200 – $4,650 | $3,400 | −34% |
| Greenville, SC | 434,900 jobs | $2,250 – $4,850 | $3,550 | −31% |
Honolulu weather and the concrete slab calendar
Climate numbers on this page come from NOAA's 1991-2020 U.S. Climate Normals at the nearest suitable station, Honolulu Intl Ap (5 miles from the city center). They are 30-year averages, so any one year can run hotter, colder or wetter.
Weather is not a serious constraint for pouring concrete in Honolulu: no month in the averages is cold enough (an average overnight low of 40°F or below) or hot enough (an average daytime high of 90°F or more) to rule it out, so the workable window is all year.
Honolulu gets about 16 inches of precipitation in a normal year. The wettest months are March, November and December (2.4 inches in March). The station averages about 32 days a year at 90°F or above.
We do not adjust the estimate by month, because we have no reliable published data on seasonal pricing. It is still worth asking contractors whether an off-peak start date changes their bid.
| Month | Avg high °F | Avg low °F | Precip (in) | For this job |
|---|---|---|---|---|
| Jan | 81 | 67 | 1.8 | Workable |
| Feb | 81 | 67 | 1.9 | Workable |
| Mar | 81 | 68 | 2.4 | Workable |
| Apr | 83 | 70 | 0.8 | Workable |
| May | 85 | 72 | 0.8 | Workable |
| Jun | 87 | 74 | 0.5 | Workable |
| Jul | 88 | 75 | 0.5 | Workable |
| Aug | 89 | 76 | 0.8 | Workable |
| Sep | 88 | 75 | 0.9 | Workable |
| Oct | 87 | 74 | 1.5 | Workable |
| Nov | 84 | 72 | 2.3 | Workable |
| Dec | 82 | 69 | 2.2 | Workable |
What local crews earn in Honolulu
The labor line is built from BLS wage data, one trade at a time. This job draws on 4 trades. We compare each trade's local median with the US median, weight the ratios by how much of the job each trade does, and apply the blend to the national labor cost. For Honolulu the blend is 1.69.
Cement masons and concrete finishers (47-2051), 50% of the weighting: a median of $46.28 an hour, 69% above the US median of $27.41. The middle half of them earn between $33.80 and $47.60 an hour. About 500 work in the metro. That is 11.2 per 10,000 jobs, compared with 13.3 nationally, so expect fewer local crews to bid.
For construction laborers (47-2061, weighted 30%) the local median is $37.48 an hour, which is 65% above the national $22.66. The middle half of them earn between $24.21 and $41.41 an hour. BLS counts 3,040 of them working in the area, 68.1 for every 10,000 jobs (US: 70.5), so the local bench is about average.
Operating engineers and other construction equipment operators (47-2073), 10% of the weighting: a median of $56.55 an hour, 96% above the US median of $28.78. The middle half of them earn between $42.10 and $57.93 an hour. About 1,430 work in the metro. That is 32.0 per 10,000 jobs, compared with 30.7 nationally, so the supply of crews looks typical.
Carpenters (47-2031), 10% of the weighting: a median of $45.34 an hour, 56% above the US median of $29.12. The middle half of them earn between $33.49 and $55.04 an hour. About 3,120 work in the metro. That is 69.9 per 10,000 jobs, compared with 43.1 nationally, which suggests plenty of local crews to bid.
A quick sensitivity check: moving the lead trade (cement masons and concrete finishers) from the median to the 75th percentile wage adds about $40 to the midpoint estimate; the 25th percentile takes off about $360. That is a swing of roughly 7.0% to 0.7% of the total, which is useful for judging whether a bid reflects wages or something else, such as scope or margin.
Urban Honolulu has 446,380 jobs in total (BLS, May 2025), ranking 56th by size among the 300 metros on this site.
| Trade | Weight | 25th pct | Median | 75th pct | US median | Ratio | Level used |
|---|---|---|---|---|---|---|---|
| Cement masons and concrete finishers (47-2051) | 50% | $33.80 | $46.28 | $47.60 | $27.41 | 1.69 | metro |
| Construction laborers (47-2061) | 30% | $24.21 | $37.48 | $41.41 | $22.66 | 1.65 | metro |
| Operating engineers and other construction equipment operators (47-2073) | 10% | $42.10 | $56.55 | $57.93 | $28.78 | 1.96 | metro |
| Carpenters (47-2031) | 10% | $33.49 | $45.34 | $55.04 | $29.12 | 1.56 | metro |
| Blended | 100% | 1.69 | |||||
Concrete slab: what moves the price in Honolulu
Truck and pump access
If the mixer truck can't back up to the forms, someone has to wheelbarrow it in or hire a pump. Pump or line-pump hire is typically billed per day.
Small-job minimums
Many crews have a minimum charge, so a 10x10 pad can cost more per square foot than a 20x20 slab.
Finish
A broom finish is the baseline. Stamped, stained, or exposed-aggregate finishes are priced as add-ons on top of the slab.
Get 3 local quotes
Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $4,500 to $5,900 for Honolulu, HI is attached.
Detailed concrete slab report for Honolulu, HI, $9
The report lays out the concrete slab numbers for Honolulu, HI line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.
Concrete slab in Honolulu: your questions
+How much does it cost to pour a concrete slab in Honolulu?
For 400 sq ft, expect $3,450 to $6,950 in the Honolulu area. A standard-spec job lands at $4,500 to $5,900. Small jobs usually cost more per sq ft and large ones less.
+What is the price per sq ft for concrete slab in Honolulu?
About $8.40 to $16.50 per sq ft for materials and labor, plus $55 to $440 for the permit if one is needed. The US range is $6 to $12.
+Is concrete slab cheaper in Honolulu or Kahului?
Kahului is 110 miles away. The midpoint for 400 sq ft there is $5,300, which is 2% more than Honolulu ($5,200). Wage and materials indexes both feed that gap.
+How much of the bill is labor in Honolulu?
About 52% at the midpoint, or $2,700 out of $5,200. Materials are 43% and permits 5%. Nationally, labor is 42%.
+What would 20x20 (400 sq ft) cost in Honolulu?
$3,450 to $6,950. Pick a different size in the estimator above to get your own number.
+Does concrete slab need a permit in Honolulu?
Often, but rules are set by your city or county building office, so call before you hire. Budget $55 to $440 for fees in the Honolulu area (our national range of $50 to $400 scaled by the local price level).
+Is Honolulu expensive for concrete slab compared with the rest of Hawaii?
Honolulu is 1% above the Hawaii statewide estimate ($5,150 at the midpoint). We cover 2 metros in Hawaii; see the state page to compare them.
+What do cement masons and concrete finishers earn in Honolulu?
The BLS median is $46.28 an hour in the Honolulu area, compared with $27.41 nationally. The 25th to 75th percentile range is $33.80 to $47.60.
+What do basic and premium concrete slab work cost in Honolulu?
For 400 sq ft, basic work runs $3,450 to $4,850 and premium work $5,550 to $6,950. Basic means: 4-inch broom-finish slab, light mesh, easy truck access. Premium means: 6-inch slab, heavy reinforcement, thick base, pump truck or tight access.
+Is there a bad season to pour a concrete slab in Honolulu?
Not from a temperature point of view. NOAA's 1991-2020 normals show no month with a freezing-level overnight low or a 90°F-plus average high, so timing is mostly about contractor availability and rain.
+What does "add rebar reinforcement" add in Honolulu?
$560 to $1,700 for 400 sq ft, from a national range scaled by the local wage and goods indexes.
Concrete slab near Honolulu
Where these numbers come from
Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.
- HomeGuide: How Much Does a Concrete Slab Cost? (2026) (accessed November 4, 2026)
- Estimators.us: Concrete Slab Cost in 2026 | $6-$12/Sq Ft Guide (accessed November 4, 2026)
- HomeGuide: How Much Does a Concrete Patio Cost? (2026) (accessed November 4, 2026)
- HomeGuide: How Much Does a Concrete Driveway Cost? (2026) (accessed November 4, 2026)
- BLS Occupational Employment and Wage Statistics, May 2025
- BEA Regional Price Parities, 2024
- NOAA NCEI U.S. Climate Normals, 1991-2020