Skip to content
CostLocal

Concrete patio cost in Providence, RI

Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.

Typical range (300 sq ft)
$1,300 – $4,300
Per sq ft
$4.15 – $13
before permit
Versus US midpoint
+7%
US $2,650
Rank of 300 metros
#59
1 = most expensive

A concrete patio in Providence, RI usually costs $1,300 to $4,300 for 300 sq ft. That works out to about $4.15 to $13 per sq ft before permits. Compared with the national midpoint that is $180 more. Cement masons and concrete finishers earn a median of $30.43 an hour in the Providence area, 11% above the US median of $27.41.

Estimate your concrete patio cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

Colored or stained, saw-cut joints, minor grading

Add-ons

Estimated cost for 300 sq ft in Providence, RI, standard level

$2,200 to $3,400

About $6.80 to $10.50 per sq ft before permits. Labor is about 55% of the bill.

Cost breakdown
PartLowHigh
Materials$900$1,150
Labor$1,150$1,950
Permits and fees$160$300
Total$2,200$3,400
Save and get a PDF report

Cost breakdown for 300 sq ft in Providence, RI

Part of the jobLowMidpointHighShare
Materials$730$1,000$1,30036%
Labor$520$1,550$2,60055%
Permits and fees$50$230$4108%
Total$1,300$2,800$4,300100%

What is behind the Providence number

Labor is 55% of the midpoint bill here, against 51% nationally. The mix of trades behind this job is cement masons and concrete finishers (50%), construction laborers (30%), carpenters (10%), operating engineers and other construction equipment operators (10%). We weight each trade's local median wage by that share and compare it with the national median. In Providence the blended ratio comes out at 1.15.

Materials are scaled with BEA's regional price parity for goods. Providence is at 97.1 against 100 for the US, so a materials line of $1,050 nationally becomes $1,000 here (midpoint, 300 sq ft). Permits follow the all-items index of 101.8: $50 to $410.

What local crews earn in Providence

The labor line is built from BLS wage data, one trade at a time. This job draws on 4 trades. We compare each trade's local median with the US median, weight the ratios by how much of the job each trade does, and apply the blend to the national labor cost. For Providence the blend is 1.15.

Cement masons and concrete finishers (47-2051), 50% of the weighting: a median of $30.43 an hour, 11% above the US median of $27.41. The middle half of them earn between $27.68 and $37.08 an hour. About 390 work in the metro. That is 5.5 per 10,000 jobs, compared with 13.3 nationally, so expect fewer local crews to bid.

For construction laborers (47-2061, weighted 30%) the local median is $28.50 an hour, which is 26% above the national $22.66. The middle half of them earn between $23.10 and $37.25 an hour. BLS counts 3,240 of them working in the area, 45.4 for every 10,000 jobs (US: 70.5), so the local bench is thinner than average.

Carpenters (47-2031), 10% of the weighting: a median of $29.76 an hour, in line with the US median of $29.12. The middle half of them earn between $26.71 and $38.38 an hour. About 4,140 work in the metro. That is 58.0 per 10,000 jobs, compared with 43.1 nationally, which suggests plenty of local crews to bid.

Operating engineers and other construction equipment operators (47-2073), 10% of the weighting: a median of $33.61 an hour, 17% above the US median of $28.78. The middle half of them earn between $29.92 and $40.30 an hour. About 1,570 work in the metro. That is 22.0 per 10,000 jobs, compared with 30.7 nationally, so expect fewer local crews to bid.

A quick sensitivity check: moving the lead trade (cement masons and concrete finishers) from the median to the 75th percentile wage adds about $160 to the midpoint estimate; the 25th percentile takes off about $70. That is a swing of roughly 2.4% to 5.8% of the total, which is useful for judging whether a bid reflects wages or something else, such as scope or margin.

Providence-Warwick has 714,120 jobs in total (BLS, May 2025), ranking 42nd by size among the 300 metros on this site.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Cement masons and concrete finishers (47-2051)50%$27.68$30.43$37.08$27.411.11metro
Construction laborers (47-2061)30%$23.10$28.50$37.25$22.661.26metro
Carpenters (47-2031)10%$26.71$29.76$38.38$29.121.02metro
Operating engineers and other construction equipment operators (47-2073)10%$29.92$33.61$40.30$28.781.17metro
Blended100%1.15

Planning more than one job in Providence?

Jobs that often go together with concrete patio are priced below at their usual sizes, using the same Providence wage and price inputs. Compared with national midpoints, paver patio comes out highest (+16%) and wood deck lowest (+1%); the gap comes from the trades each job uses.

Related projects with local prices
ProjectSizeRangevs. US
Concrete slab400 sq ft$2,600 – $5,450+5%
Stamped concrete400 sq ft$3,400 – $8,500+6%
Paver patio300 sq ft$3,450 – $6,350+16%
Wood deck300 sq ft$7,650 – $15,400+1%
Concrete driveway600 sq ft$3,950 – $10,100+10%
Asphalt driveway600 sq ft$3,200 – $7,950+7%

Providence: what basic, standard and premium work costs

The cited range is split into basic, standard and premium bands, then scaled to Providence. Bands overlap, because plenty of standard jobs cost as much as a light premium one. Sizes run from 10x10 (100 sq ft) to 20x20 (400 sq ft).

Basic

$1,300 to $2,500

Plain gray slab, broom finish, flat yard

Standard

$2,200 to $3,400

Colored or stained, saw-cut joints, minor grading

Premium

$3,100 to $4,300

Exposed aggregate or heavy decorative finish, drainage work

Cost by size and quality level
SizeBasicStandardPremium
10x10 (100 sq ft)$470 – $960$840 – $1,350$1,200 – $1,700
12x16 (192 sq ft)$850 – $1,650$1,450 – $2,300$2,100 – $2,900
20x20 (400 sq ft)$1,700 – $3,250$2,900 – $4,450$4,050 – $5,600

How Providence compares

Same job, same size (300 sq ft), priced for the nearest metros. Boston is the priciest of the group at $2,900. Norwich is the cheapest at $2,700.

Comparison with nearby areas
AreaRangeMidpointvs. here
Providence, RIthis page$1,300 – $4,300$2,800
Norwich, CT45 miles$1,250 – $4,100$2,700−4%
Worcester, MA55 miles$1,300 – $4,400$2,850+2%
Boston, MA60 miles$1,350 – $4,500$2,900+4%
Barnstable, MA60 miles$1,300 – $4,350$2,850+1%
Hartford, CT65 miles$1,250 – $4,200$2,750−3%
Rhode Island (statewide)$1,300 – $4,250$2,750−1%
United States$1,250 – $4,000$2,650−6%

Out of the 300 metros we cover, Providence ranks #59 for the cost of this job (#1 is the most expensive). Statewide, Providence is 1% above the Rhode Island figure.

Providence is the only Rhode Island metro we cover, so the statewide page is the only in-state comparison. It uses statewide wages, which include rural areas.

Metros of a similar size

Big cities and small ones price differently, so here is Providence against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
Raleigh, NC743,120 jobs$1,150 – $3,650$2,400−14%
Louisville, KY685,190 jobs$1,200 – $3,850$2,500−10%
Virginia Beach, VA763,060 jobs$1,150 – $3,600$2,400−15%
Oklahoma City, OK677,680 jobs$1,100 – $3,500$2,300−18%

Providence weather and the concrete patio calendar

Climate numbers on this page come from NOAA's 1991-2020 U.S. Climate Normals at the nearest suitable station, Providence T F Green Ap (5 miles from the city center). They are 30-year averages, so any one year can run hotter, colder or wetter.

For pouring concrete, the comfortable months in Providence are May through October: 6 of 12. Outside them, January, February, March, April, November and December have an average overnight low of 40°F or below.

The 40°F line is a deliberately cautious stand-in. The American Concrete Institute's cold-weather guide (ACI 306R-16) defines cold-weather concreting around an average daily air temperature below 40°F, which is colder than our test of an average overnight low at or below 40°F, so we flag a few extra shoulder months. In cold weather crews may need heated enclosures, insulating blankets or accelerated mixes, and those measures can raise a quote.

Providence gets about 48 inches of precipitation in a normal year, including roughly 37 inches of snow. The wettest months are March, April and December (4.9 inches in March). Inside the workable window, May and July are the driest, at 3.4 and 2.9 inches. The station averages about 12 days a year at 90°F or above.

We do not adjust the estimate by month, because we have no reliable published data on seasonal pricing. It is still worth asking contractors whether an off-peak start date changes their bid.

Monthly normals, Providence T F Green Ap (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan38224.0Cold
Feb41243.4Cold
Mar48304.9Cold
Apr59404.3Cold
May69493.4Workable
Jun78593.8Workable
Jul84652.9Workable
Aug82643.6Workable
Sep75574.2Workable
Oct64454.2Workable
Nov53364.3Cold
Dec43284.7Cold

Why two Providence quotes can differ

  • Finish

    Plain concrete is $4-$12 per sq ft and a broom finish $6-$13; designs with several colors and decorative finishes run up to about $28 (HomeGuide).

  • Site prep

    Excavation, forms and a gravel base are the unglamorous part of the bill and vary most with soil and slope.

  • Size

    Small patios carry fixed costs for forms and mobilization, so the per-square-foot price drops as the patio gets bigger.

Add-ons priced for Providence

Add-ons start from national price ranges and are scaled by 1.06 for Providence, which is the average of the area's wage index (1.15) and goods price index (0.97). The estimator above can add them to your total.

Add-on prices
Add-onLocal range
Add an acid or water-based stain$960 – $3,200

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $2,200 to $3,400 for Providence, RI is attached.

Take this estimate with you: PDF report, $9

Multi-page report for Providence, RI: low, typical and high cost, a line-item breakdown of materials and labor by trade, permit notes, the best months to schedule, a quote comparison sheet, red flags, questions for contractors, checklists and every source. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Concrete patio in Providence: your questions

+How much does it cost to pour a concrete patio in Providence?

For 300 sq ft, expect $1,300 to $4,300 in the Providence area. A standard-spec job lands at $2,200 to $3,400. Small jobs usually cost more per sq ft and large ones less.

+What is the price per sq ft for concrete patio in Providence?

About $4.15 to $13 per sq ft for materials and labor, plus $50 to $410 for the permit if one is needed. The US range is $4 to $12.

+Is concrete patio cheaper in Providence or Norwich?

Norwich is 45 miles away. The midpoint for 300 sq ft there is $2,700, which is 4% less than Providence ($2,800). Wage and materials indexes both feed that gap.

+How much of the bill is labor in Providence?

About 55% at the midpoint, or $1,550 out of $2,800. Materials are 36% and permits 8%. Nationally, labor is 51%.

+What would 12x16 (192 sq ft) cost in Providence?

$850 to $2,900. Pick a different size in the estimator above to get your own number.

+Does concrete patio need a permit in Providence?

Often, but rules are set by your city or county building office, so call before you hire. Budget $50 to $410 for fees in the Providence area (our national range of $50 to $400 scaled by the local price level).

+Is Providence expensive for concrete patio compared with the rest of Rhode Island?

Providence is 1% above the Rhode Island statewide estimate ($2,750 at the midpoint).

+What do cement masons and concrete finishers earn in Providence?

The BLS median is $30.43 an hour in the Providence area, compared with $27.41 nationally. The 25th to 75th percentile range is $27.68 to $37.08.

+What do basic and premium concrete patio work cost in Providence?

For 300 sq ft, basic work runs $1,300 to $2,500 and premium work $3,100 to $4,300. Basic means: plain gray slab, broom finish, flat yard. Premium means: exposed aggregate or heavy decorative finish, drainage work.

+When is the best time to pour a concrete patio in Providence?

Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are May through October. May and July are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.

+What does "add an acid or water-based stain" add in Providence?

$960 to $3,200 for 300 sq ft, from a national range scaled by the local wage and goods indexes.

Concrete patio near Providence

Concrete patio: all pricesConcrete patio in Rhode IslandAll projects in ProvidenceRhode Island cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.

Note on derived figures: Materials = SimplyWise's sample 200 sq ft broom-finish patio line ($500-$900 in materials) divided by 200 sq ft.