Skip to content
CostLocal

Concrete slab cost in Providence, RI

Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.

Typical range (400 sq ft)
$2,600 – $5,450
Per sq ft
$6.35 – $12.50
before permit
Versus US midpoint
+5%
US $3,850
Rank of 300 metros
#64
1 = most expensive

Providence homeowners pay roughly $2,600 to $5,450 to pour a concrete slab at 400 sq ft, or $6.35 to $12.50 per sq ft (permit not included). Against the US midpoint, Providence is 5% higher. Cement masons and concrete finishers earn a median of $30.43 an hour in the Providence area, 11% above the US median of $27.41.

Estimate your concrete slab cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

4-5 inch slab with rebar or heavier mesh and standard base prep

Add-ons

Estimated cost for 400 sq ft in Providence, RI, standard level

$3,450 to $4,600

About $8.20 to $10.50 per sq ft before permits. Labor is about 46% of the bill.

Cost breakdown
PartLowHigh
Materials$1,650$2,250
Labor$1,650$2,050
Permits and fees$160$300
Total$3,450$4,600
Save and get a PDF report

Cost breakdown for 400 sq ft in Providence, RI

Part of the jobLowMidpointHighShare
Materials$1,150$1,950$2,70048%
Labor$1,400$1,850$2,30046%
Permits and fees$50$230$4106%
Total$2,600$4,000$5,450100%

Why Providence prices look the way they do

Labor is 46% of the midpoint bill here, against 42% nationally. The mix of trades behind this job is cement masons and concrete finishers (50%), construction laborers (30%), operating engineers and other construction equipment operators (10%), carpenters (10%). We weight each trade's local median wage by that share and compare it with the national median. In Providence the blended ratio comes out at 1.15.

On the materials line, the BEA goods price index for the Providence metro is 97.1 (US = 100). The midpoint materials bill for 400 sq ft comes to $1,950, compared with $2,000 at national prices. Permit and inspection fees are scaled by the broader index (101.8) and land at $50 to $410.

Providence: what basic, standard and premium work costs

Three bands are cut from the same cited range and localized for Providence wages and prices. They overlap on purpose: a good standard job and a modest premium job can cost the same. The grid below prices the same bands at 5 common sizes.

Basic

$2,600 to $3,750

4-inch broom-finish slab, light mesh, easy truck access

Standard

$3,450 to $4,600

4-5 inch slab with rebar or heavier mesh and standard base prep

Premium

$4,300 to $5,450

6-inch slab, heavy reinforcement, thick base, pump truck or tight access

Cost by size and quality level
SizeBasicStandardPremium
10x10 pad (100 sq ft)$690 – $1,100$980 – $1,350$1,250 – $1,650
12x12 (144 sq ft)$970 – $1,450$1,350 – $1,850$1,700 – $2,200
20x20 (400 sq ft)$2,600 – $3,750$3,450 – $4,600$4,300 – $5,450
24x24 garage floor (576 sq ft)$3,700 – $5,300$4,900 – $6,450$6,050 – $7,650
30x40 foundation (1,200 sq ft)$7,700 – $10,800$10,000 – $13,100$12,400 – $15,500

Local wages behind the labor line

Wages are the part of this estimate that changes most from town to town. 4 trades carry the job here, and each is compared with its US median. The weighted result for Providence is 1.15 times the national level.

For cement masons and concrete finishers (47-2051, weighted 50%) the local median is $30.43 an hour, which is 11% above the national $27.41. The middle half of them earn between $27.68 and $37.08 an hour. BLS counts 390 of them working in the area, 5.5 for every 10,000 jobs (US: 13.3), so the local bench is thinner than average.

Construction laborers (47-2061), 30% of the weighting: a median of $28.50 an hour, 26% above the US median of $22.66. The middle half of them earn between $23.10 and $37.25 an hour. About 3,240 work in the metro. That is 45.4 per 10,000 jobs, compared with 70.5 nationally, so expect fewer local crews to bid.

For operating engineers and other construction equipment operators (47-2073, weighted 10%) the local median is $33.61 an hour, which is 17% above the national $28.78. The middle half of them earn between $29.92 and $40.30 an hour. BLS counts 1,570 of them working in the area, 22.0 for every 10,000 jobs (US: 30.7), so the local bench is thinner than average.

For carpenters (47-2031, weighted 10%) the local median is $29.76 an hour, which is in line with the national $29.12. The middle half of them earn between $26.71 and $38.38 an hour. BLS counts 4,140 of them working in the area, 58.0 for every 10,000 jobs (US: 43.1), so the local bench is deeper than average.

Quotes come from real crews, not medians. If the cement masons and concrete finishers on your job are paid at the 75th percentile ($37.08 an hour) instead of the median, the labor line grows by about $190. At the 25th percentile ($27.68) it shrinks by about $80. The total moves by 4.8% or 2.0%, so wages alone rarely explain a quote that is far outside our range.

For context on the local economy, BLS counts 714,120 jobs in the Providence-Warwick area. That makes it the 42nd largest of the 300 metros we cover, with 0.46% of US employment.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Cement masons and concrete finishers (47-2051)50%$27.68$30.43$37.08$27.411.11metro
Construction laborers (47-2061)30%$23.10$28.50$37.25$22.661.26metro
Operating engineers and other construction equipment operators (47-2073)10%$29.92$33.61$40.30$28.781.17metro
Carpenters (47-2031)10%$26.71$29.76$38.38$29.121.02metro
Blended100%1.15

Related projects, priced for Providence

Because every project leans on different trades, Providence's wage level does not move all prices equally. Against the US midpoint, concrete driveway runs +10% and detached garage +4%.

Related projects with local prices
ProjectSizeRangevs. US
Concrete driveway600 sq ft$3,950 – $10,100+10%
Concrete patio300 sq ft$1,300 – $4,300+7%
Detached garage576 sq ft$30,100 – $60,300+4%
Stamped concrete400 sq ft$3,400 – $8,500+6%
Asphalt driveway600 sq ft$3,200 – $7,950+7%
Gravel driveway1,000 sq ft$2,750 – $11,100+9%

Extras that change the Providence total

Extras are quoted nationally and then scaled to Providence by the average of the local wage index (1.15) and goods index (0.97), a factor of 1.06. Tick any of them in the estimator above to add them to your total. Treat these as planning figures: an add-on touches different trades than the main job, so the scaling is an approximation.

Add-on prices
Add-onLocal range
Add rebar reinforcement$420 – $1,250
Remove old concrete first$850 – $2,550

Providence against nearby metros and the rest of Rhode Island

Contractors rarely work more than an hour or two from home, so the neighboring metros set a rough ceiling and floor for your quotes. Midpoints for 400 sq ft range from $3,850 to $4,150 across Providence and its five closest metros.

Comparison with nearby areas
AreaRangeMidpointvs. here
Providence, RIthis page$2,600 – $5,450$4,000
Norwich, CT45 miles$2,500 – $5,250$3,850−4%
Worcester, MA55 miles$2,650 – $5,550$4,100+2%
Boston, MA60 miles$2,700 – $5,650$4,150+4%
Barnstable, MA60 miles$2,650 – $5,450$4,050+1%
Hartford, CT65 miles$2,550 – $5,350$3,950−2%
Rhode Island (statewide)$2,550 – $5,400$3,950−1%
United States$2,450 – $5,200$3,850−5%

Across 300 US metros, Providence comes in at #64 from the top. The priciest is Kahului, HI at $5,300; the cheapest is McAllen, TX at $3,200 (midpoints, 400 sq ft). Statewide, Providence is 1% above the Rhode Island figure.

Providence is the only Rhode Island metro we cover, so the statewide page is the only in-state comparison. It uses statewide wages, which include rural areas.

Cities with a workforce like Providence's

Big cities and small ones price differently, so here is Providence against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
Raleigh, NC743,120 jobs$2,250 – $4,850$3,550−11%
Louisville, KY685,190 jobs$2,350 – $5,000$3,650−9%
Virginia Beach, VA763,060 jobs$2,250 – $4,800$3,500−12%
Oklahoma City, OK677,680 jobs$2,150 – $4,650$3,400−15%

Why two Providence quotes can differ

  • Thickness and mix

    A 4-inch slab uses about 1.23 cubic yards of concrete per 100 sq ft; a 6-inch slab uses about 1.85. Stepping up from a 3,000 PSI to a 4,000-4,500 PSI mix adds $10-$40 per cubic yard (Estimators.us).

  • Base and reinforcement

    A compacted gravel base, vapor barrier, and wire mesh or rebar are priced separately by some contractors and bundled by others. Ask which one your quote does.

  • Truck and pump access

    If the mixer truck can't back up to the forms, someone has to wheelbarrow it in or hire a pump. Pump or line-pump hire is typically billed per day.

When to schedule concrete slab in Providence

We use NOAA's 1991-2020 climate normals for Providence T F Green Ap (5 miles from the city center). These are 30-year monthly averages, not forecasts.

May through October is the stretch where pouring concrete runs into the fewest weather problems in Providence (6 of 12 months). January, February, March, April, November and December have an average overnight low of 40°F or below.

The 40°F line is a deliberately cautious stand-in. The American Concrete Institute's cold-weather guide (ACI 306R-16) defines cold-weather concreting around an average daily air temperature below 40°F, which is colder than our test of an average overnight low at or below 40°F, so we flag a few extra shoulder months. In cold weather crews may need heated enclosures, insulating blankets or accelerated mixes, and those measures can raise a quote.

Providence gets about 48 inches of precipitation in a normal year, including roughly 37 inches of snow. The wettest months are March, April and December (4.9 inches in March). Inside the workable window, May and July are the driest, at 3.4 and 2.9 inches. The station averages about 12 days a year at 90°F or above.

Does the season change the price? Probably, but we do not have a sourced seasonal price curve, so the estimator shows a year-round figure and does not adjust by month. When you collect quotes, ask whether scheduling in a slower month gets a better rate.

Monthly normals, Providence T F Green Ap (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan38224.0Cold
Feb41243.4Cold
Mar48304.9Cold
Apr59404.3Cold
May69493.4Workable
Jun78593.8Workable
Jul84652.9Workable
Aug82643.6Workable
Sep75574.2Workable
Oct64454.2Workable
Nov53364.3Cold
Dec43284.7Cold

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $3,450 to $4,600 for Providence, RI is attached.

Detailed concrete slab report for Providence, RI, $9

The report lays out the concrete slab numbers for Providence, RI line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Concrete slab in Providence: your questions

+How much does it cost to pour a concrete slab in Providence?

For 400 sq ft, expect $2,600 to $5,450 in the Providence area. A standard-spec job lands at $3,450 to $4,600. Small jobs usually cost more per sq ft and large ones less.

+What is the price per sq ft for concrete slab in Providence?

About $6.35 to $12.50 per sq ft for materials and labor, plus $50 to $410 for the permit if one is needed. The US range is $6 to $12.

+Is concrete slab cheaper in Providence or Norwich?

Norwich is 45 miles away. The midpoint for 400 sq ft there is $3,850, which is 4% less than Providence ($4,000). Wage and materials indexes both feed that gap.

+How much of the bill is labor in Providence?

About 46% at the midpoint, or $1,850 out of $4,000. Materials are 48% and permits 6%. Nationally, labor is 42%.

+What would 20x20 (400 sq ft) cost in Providence?

$2,600 to $5,450. Pick a different size in the estimator above to get your own number.

+Does concrete slab need a permit in Providence?

Often, but rules are set by your city or county building office, so call before you hire. Budget $50 to $410 for fees in the Providence area (our national range of $50 to $400 scaled by the local price level).

+Is Providence expensive for concrete slab compared with the rest of Rhode Island?

Providence is 1% above the Rhode Island statewide estimate ($3,950 at the midpoint).

+What do cement masons and concrete finishers earn in Providence?

The BLS median is $30.43 an hour in the Providence area, compared with $27.41 nationally. The 25th to 75th percentile range is $27.68 to $37.08.

+What do basic and premium concrete slab work cost in Providence?

For 400 sq ft, basic work runs $2,600 to $3,750 and premium work $4,300 to $5,450. Basic means: 4-inch broom-finish slab, light mesh, easy truck access. Premium means: 6-inch slab, heavy reinforcement, thick base, pump truck or tight access.

+When is the best time to pour a concrete slab in Providence?

Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are May through October. May and July are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.

+What does "add rebar reinforcement" add in Providence?

$420 to $1,250 for 400 sq ft, from a national range scaled by the local wage and goods indexes.

Concrete slab near Providence

Concrete slab: all pricesConcrete slab in Rhode IslandAll projects in ProvidenceRhode Island cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.