Skip to content
CostLocal

Concrete slab cost in Oklahoma City, OK

Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.

Typical range (400 sq ft)
$2,150 – $4,650
Per sq ft
$5.30 – $10.50
before permit
Versus US midpoint
−11%
US $3,850
Rank of 300 metros
#266
1 = most expensive

If you want to pour a concrete slab in Oklahoma City, plan on $2,150 to $4,650 for 400 sq ft, all in. Per sq ft, that is $5.30 to $10.50 for materials and labor, with the permit on top. The local midpoint runs 11% lower than the national one. Cement masons and concrete finishers earn a median of $22.57 an hour in the Oklahoma City area, 18% below the US median of $27.41.

Estimate your concrete slab cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

4-5 inch slab with rebar or heavier mesh and standard base prep

Add-ons

Estimated cost for 400 sq ft in Oklahoma City, OK, standard level

$2,900 to $3,900

About $6.90 to $9.05 per sq ft before permits. Labor is about 39% of the bill.

Cost breakdown
PartLowHigh
Materials$1,600$2,200
Labor$1,200$1,450
Permits and fees$140$270
Total$2,900$3,900
Save and get a PDF report

Cost breakdown for 400 sq ft in Oklahoma City, OK

Part of the jobLowMidpointHighShare
Materials$1,150$1,900$2,65055%
Labor$990$1,300$1,65039%
Permits and fees$45$200$3606%
Total$2,150$3,400$4,650100%

Where the Oklahoma City price comes from

The wage side of the estimate leans on cement masons and concrete finishers, who do 50% of the hours on a typical job. Their local median is $22.57 an hour. Add the other trades involved and the blended wage index for Oklahoma City is 0.82 (US = 1.00), which puts labor at 39% of the total.

On the materials line, the BEA goods price index for the Oklahoma City metro is 93.8 (US = 100). The midpoint materials bill for 400 sq ft comes to $1,900, compared with $2,000 at national prices. Permit and inspection fees are scaled by the broader index (90.4) and land at $45 to $360.

Extras that change the Oklahoma City total

Extras are quoted nationally and then scaled to Oklahoma City by the average of the local wage index (0.82) and goods index (0.94), a factor of 0.88. Tick any of them in the estimator above to add them to your total. Treat these as planning figures: an add-on touches different trades than the main job, so the scaling is an approximation.

Add-on prices
Add-onLocal range
Add rebar reinforcement$350 – $1,050
Remove old concrete first$710 – $2,100

What nearby projects cost in Oklahoma City

Because every project leans on different trades, Oklahoma City's wage level does not move all prices equally. Against the US midpoint, asphalt driveway runs −10% and concrete driveway −14%.

Related projects with local prices
ProjectSizeRangevs. US
Concrete driveway600 sq ft$3,150 – $7,900−14%
Concrete patio300 sq ft$1,100 – $3,500−12%
Detached garage576 sq ft$25,600 – $51,400−12%
Stamped concrete400 sq ft$2,900 – $7,000−12%
Asphalt driveway600 sq ft$2,800 – $6,650−10%
Gravel driveway1,000 sq ft$2,200 – $9,000−12%

Specs and site conditions that change a Oklahoma City bid

  • Finish

    A broom finish is the baseline. Stamped, stained, or exposed-aggregate finishes are priced as add-ons on top of the slab.

  • Thickness and mix

    A 4-inch slab uses about 1.23 cubic yards of concrete per 100 sq ft; a 6-inch slab uses about 1.85. Stepping up from a 3,000 PSI to a 4,000-4,500 PSI mix adds $10-$40 per cubic yard (Estimators.us).

  • Base and reinforcement

    A compacted gravel base, vapor barrier, and wire mesh or rebar are priced separately by some contractors and bundled by others. Ask which one your quote does.

Pick a size, pick a tier: concrete slab pricing in Oklahoma City

Three bands are cut from the same cited range and localized for Oklahoma City wages and prices. They overlap on purpose: a good standard job and a modest premium job can cost the same. The grid below prices the same bands at 5 common sizes.

Basic

$2,150 to $3,150

4-inch broom-finish slab, light mesh, easy truck access

Standard

$2,900 to $3,900

4-5 inch slab with rebar or heavier mesh and standard base prep

Premium

$3,650 to $4,650

6-inch slab, heavy reinforcement, thick base, pump truck or tight access

Cost by size and quality level
SizeBasicStandardPremium
10x10 pad (100 sq ft)$570 – $920$830 – $1,150$1,100 – $1,450
12x12 (144 sq ft)$810 – $1,250$1,150 – $1,550$1,450 – $1,900
20x20 (400 sq ft)$2,150 – $3,150$2,900 – $3,900$3,650 – $4,650
24x24 garage floor (576 sq ft)$3,100 – $4,450$4,100 – $5,500$5,150 – $6,500
30x40 foundation (1,200 sq ft)$6,400 – $9,100$8,450 – $11,100$10,500 – $13,200

How Oklahoma City compares

Of the five closest metros, 1 is cheaper than Oklahoma City. Fort Smith is the lowest at about $3,200 (midpoint, 400 sq ft), 170 miles away.

Comparison with nearby areas
AreaRangeMidpointvs. here
Oklahoma City, OKthis page$2,150 – $4,650$3,400
Tulsa, OK95 miles$2,200 – $4,650$3,400+1%
Wichita, KS155 miles$2,200 – $4,700$3,450+2%
Fort Smith, AR170 miles$2,050 – $4,400$3,200−6%
Dallas, TX180 miles$2,350 – $5,050$3,700+8%
Fayetteville, AR200 miles$2,150 – $4,650$3,400level
Oklahoma (statewide)$2,150 – $4,600$3,350−1%
United States$2,450 – $5,200$3,850+13%

Across 300 US metros, Oklahoma City comes in at #266 from the top. The priciest is Kahului, HI at $5,300; the cheapest is McAllen, TX at $3,200 (midpoints, 400 sq ft). Statewide, Oklahoma City is 1% above the Oklahoma figure.

Other Oklahoma metros

Oklahoma metros compared with Oklahoma City
MetroSizeRangeMidpointvs. here
Tulsa, OK458,730 jobs$2,200 – $4,650$3,400+1%

Cities with a workforce like Oklahoma City's

Big cities and small ones price differently, so here is Oklahoma City against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
Louisville, KY685,190 jobs$2,350 – $5,000$3,650+8%
Richmond, VA660,350 jobs$2,250 – $4,800$3,500+3%
Providence, RI714,120 jobs$2,600 – $5,450$4,000+18%
Memphis, TN611,670 jobs$2,300 – $4,850$3,550+5%

Oklahoma City labor market for concrete slab

Wages are the part of this estimate that changes most from town to town. 4 trades carry the job here, and each is compared with its US median. The weighted result for Oklahoma City is 0.82 times the national level.

For cement masons and concrete finishers (47-2051, weighted 50%) the local median is $22.57 an hour, which is 18% below the national $27.41. The middle half of them earn between $19.44 and $24.44 an hour. BLS counts 1,210 of them working in the area, 17.9 for every 10,000 jobs (US: 13.3), so the local bench is deeper than average.

Construction laborers (47-2061), 30% of the weighting: a median of $18.96 an hour, 16% below the US median of $22.66. The middle half of them earn between $17.79 and $22.89 an hour. About 5,570 work in the metro. That is 82.2 per 10,000 jobs, compared with 70.5 nationally, which suggests plenty of local crews to bid.

For operating engineers and other construction equipment operators (47-2073, weighted 10%) the local median is $23.41 an hour, which is 19% below the national $28.78. The middle half of them earn between $20.11 and $27.82 an hour. BLS counts 2,250 of them working in the area, 33.2 for every 10,000 jobs (US: 30.7), so the local bench is about average.

For carpenters (47-2031, weighted 10%) the local median is $23.53 an hour, which is 19% below the national $29.12. The middle half of them earn between $21.13 and $27.60 an hour. BLS counts 1,420 of them working in the area, 21.0 for every 10,000 jobs (US: 43.1), so the local bench is thinner than average.

Quotes come from real crews, not medians. If the cement masons and concrete finishers on your job are paid at the 75th percentile ($24.44 an hour) instead of the median, the labor line grows by about $55. At the 25th percentile ($19.44) it shrinks by about $90. The total moves by 1.6% or 2.7%, so wages alone rarely explain a quote that is far outside our range.

For context on the local economy, BLS counts 677,680 jobs in the Oklahoma City area. That makes it the 44th largest of the 300 metros we cover, with 0.44% of US employment.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Cement masons and concrete finishers (47-2051)50%$19.44$22.57$24.44$27.410.82metro
Construction laborers (47-2061)30%$17.79$18.96$22.89$22.660.84metro
Operating engineers and other construction equipment operators (47-2073)10%$20.11$23.41$27.82$28.780.81metro
Carpenters (47-2031)10%$21.13$23.53$27.60$29.120.81metro
Blended100%0.82

Climate in Oklahoma City: timing your concrete slab job

We use NOAA's 1991-2020 climate normals for Oklahoma City Will Rogers Ap (5 miles from the city center). These are 30-year monthly averages, not forecasts.

April through June and September through October are the stretches where pouring concrete runs into the fewest weather problems in Oklahoma City (5 of 12 months). January, February, March, November and December have an average overnight low of 40°F or below; July and August have an average daytime high of 90°F or more.

The 40°F line is a deliberately cautious stand-in. The American Concrete Institute's cold-weather guide (ACI 306R-16) defines cold-weather concreting around an average daily air temperature below 40°F, which is colder than our test of an average overnight low at or below 40°F, so we flag a few extra shoulder months. In cold weather crews may need heated enclosures, insulating blankets or accelerated mixes, and those measures can raise a quote.

Heat matters for concrete as well. With average highs of 90°F or more in July and August, crews often start early, wet the base and plan for faster set times.

Oklahoma City gets about 36 inches of precipitation in a normal year, including roughly 7 inches of snow. The wettest months are May, June and September (5.3 inches in May). Inside the workable window, April and October are the driest, at 3.6 and 3.3 inches. The station averages about 74 days a year at 90°F or above.

Does the season change the price? Probably, but we do not have a sourced seasonal price curve, so the estimator shows a year-round figure and does not adjust by month. When you collect quotes, ask whether scheduling in a slower month gets a better rate.

Monthly normals, Oklahoma City Will Rogers Ap (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan49271.3Cold
Feb54311.4Cold
Mar63402.5Cold
Apr71483.6Workable
May79585.3Workable
Jun88664.5Workable
Jul93703.6Hot
Aug92693.6Hot
Sep84623.7Workable
Oct73493.3Workable
Nov61381.7Cold
Dec50301.8Cold

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $2,900 to $3,900 for Oklahoma City, OK is attached.

Detailed concrete slab report for Oklahoma City, OK, $9

Multi-page report for Oklahoma City, OK: low, typical and high cost, a line-item breakdown of materials and labor by trade, permit notes, the best months to schedule, a quote comparison sheet, red flags, questions for contractors, checklists and every source. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Concrete slab in Oklahoma City: your questions

+How much does it cost to pour a concrete slab in Oklahoma City?

For 400 sq ft, expect $2,150 to $4,650 in the Oklahoma City area. A standard-spec job lands at $2,900 to $3,900. Small jobs usually cost more per sq ft and large ones less.

+What is the price per sq ft for concrete slab in Oklahoma City?

About $5.30 to $10.50 per sq ft for materials and labor, plus $45 to $360 for the permit if one is needed. The US range is $6 to $12.

+Is concrete slab cheaper in Oklahoma City or Tulsa?

Tulsa is 95 miles away. The midpoint for 400 sq ft there is $3,400, which is 1% more than Oklahoma City ($3,400). Wage and materials indexes both feed that gap.

+How much of the bill is labor in Oklahoma City?

About 39% at the midpoint, or $1,300 out of $3,400. Materials are 55% and permits 6%. Nationally, labor is 42%.

+What would 20x20 (400 sq ft) cost in Oklahoma City?

$2,150 to $4,650. Pick a different size in the estimator above to get your own number.

+Does concrete slab need a permit in Oklahoma City?

Often, but rules are set by your city or county building office, so call before you hire. Budget $45 to $360 for fees in the Oklahoma City area (our national range of $50 to $400 scaled by the local price level).

+Is Oklahoma City expensive for concrete slab compared with the rest of Oklahoma?

Oklahoma City is 1% above the Oklahoma statewide estimate ($3,350 at the midpoint). We cover 2 metros in Oklahoma; see the state page to compare them.

+What do cement masons and concrete finishers earn in Oklahoma City?

The BLS median is $22.57 an hour in the Oklahoma City area, compared with $27.41 nationally. The 25th to 75th percentile range is $19.44 to $24.44.

+What do basic and premium concrete slab work cost in Oklahoma City?

For 400 sq ft, basic work runs $2,150 to $3,150 and premium work $3,650 to $4,650. Basic means: 4-inch broom-finish slab, light mesh, easy truck access. Premium means: 6-inch slab, heavy reinforcement, thick base, pump truck or tight access.

+When is the best time to pour a concrete slab in Oklahoma City?

Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are April through June and September through October. April and October are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.

+What does "add rebar reinforcement" add in Oklahoma City?

$350 to $1,050 for 400 sq ft, from a national range scaled by the local wage and goods indexes.

Concrete slab near Oklahoma City

Concrete slab: all pricesConcrete slab in OklahomaAll projects in Oklahoma CityOklahoma cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.