Concrete slab cost in Fort Smith, AR
Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.
- Typical range (400 sq ft)
- $2,050 – $4,400
- Per sq ft
- $4.95 – $10
- before permit
- Versus US midpoint
- −16%
- US $3,850
- Rank of 300 metros
- #299
- 1 = most expensive
Fort Smith homeowners pay roughly $2,050 to $4,400 to pour a concrete slab at 400 sq ft, or $4.95 to $10 per sq ft (permit not included). Against the US midpoint, Fort Smith is 16% lower. Cement masons and concrete finishers earn a median of $18.70 an hour in the Fort Smith area, 32% below the US median of $27.41.
Estimate your concrete slab cost
Pick a size, a quality level and where you live. Prices update as you type.
Estimated cost for 400 sq ft in Fort Smith, AR, standard level
$2,750 to $3,700
About $6.50 to $8.60 per sq ft before permits. Labor is about 36% of the bill.
| Part | Low | High |
|---|---|---|
| Materials | $1,550 | $2,150 |
| Labor | $1,050 | $1,250 |
| Permits and fees | $130 | $250 |
| Total | $2,750 | $3,700 |
Cost breakdown for 400 sq ft in Fort Smith, AR
| Part of the job | Low | Midpoint | High | Share |
|---|---|---|---|---|
| Materials | $1,100 | $1,850 | $2,600 | 58% |
| Labor | $860 | $1,150 | $1,450 | 36% |
| Permits and fees | $45 | $190 | $340 | 6% |
| Total | $2,050 | $3,200 | $4,400 | 100% |
What is behind the Fort Smith number
The wage side of the estimate leans on cement masons and concrete finishers, who do 50% of the hours on a typical job. Their local median is $18.70 an hour. Add the other trades involved and the blended wage index for Fort Smith is 0.72 (US = 1.00), which puts labor at 36% of the total.
On the materials line, the BEA goods price index for the Fort Smith metro is 93.6 (US = 100). The midpoint materials bill for 400 sq ft comes to $1,850, compared with $2,000 at national prices. Permit and inspection fees are scaled by the broader index (85.9) and land at $45 to $340.
Add-ons priced for Fort Smith
Extras are quoted nationally and then scaled to Fort Smith by the average of the local wage index (0.72) and goods index (0.94), a factor of 0.83. Tick any of them in the estimator above to add them to your total. Treat these as planning figures: an add-on touches different trades than the main job, so the scaling is an approximation.
| Add-on | Local range |
|---|---|
| Add rebar reinforcement | $330 – $990 |
| Remove old concrete first | $660 – $2,000 |
Planning more than one job in Fort Smith?
Because every project leans on different trades, Fort Smith's wage level does not move all prices equally. Against the US midpoint, asphalt driveway runs −15% and concrete driveway −22%.
| Project | Size | Range | vs. US |
|---|---|---|---|
| Concrete driveway | 600 sq ft | $2,900 – $7,150 | −22% |
| Concrete patio | 300 sq ft | $1,050 – $3,200 | −18% |
| Detached garage | 576 sq ft | $24,200 – $48,600 | −16% |
| Stamped concrete | 400 sq ft | $2,750 – $6,550 | −17% |
| Asphalt driveway | 600 sq ft | $2,650 – $6,200 | −15% |
| Gravel driveway | 1,000 sq ft | $2,100 – $8,550 | −16% |
Local wages behind the labor line
Wages are the part of this estimate that changes most from town to town. 4 trades carry the job here, and each is compared with its US median. The weighted result for Fort Smith is 0.72 times the national level.
For cement masons and concrete finishers (47-2051, weighted 50%) the local median is $18.70 an hour, which is 32% below the national $27.41. The middle half of them earn between $17.20 and $24.27 an hour. BLS counts 130 of them working in the area, 13.6 for every 10,000 jobs (US: 13.3), so the local bench is about average.
Construction laborers (47-2061), 30% of the weighting: a median of $17.77 an hour, 22% below the US median of $22.66. The middle half of them earn between $16.31 and $21.83 an hour. About 670 work in the metro. That is 70.1 per 10,000 jobs, compared with 70.5 nationally, so the supply of crews looks typical.
For operating engineers and other construction equipment operators (47-2073, weighted 10%) the local median is $20.11 an hour, which is 30% below the national $28.78. The middle half of them earn between $18.15 and $21.12 an hour. BLS counts 440 of them working in the area, 46.0 for every 10,000 jobs (US: 30.7), so the local bench is deeper than average.
For carpenters (47-2031, weighted 10%) the local median is $20.39 an hour, which is 30% below the national $29.12. The middle half of them earn between $17.84 and $23.62 an hour. BLS counts 240 of them working in the area, 25.1 for every 10,000 jobs (US: 43.1), so the local bench is thinner than average.
Quotes come from real crews, not medians. If the cement masons and concrete finishers on your job are paid at the 75th percentile ($24.27 an hour) instead of the median, the labor line grows by about $160. At the 25th percentile ($17.20) it shrinks by about $45. The total moves by 5.1% or 1.4%, so wages alone rarely explain a quote that is far outside our range.
For context on the local economy, BLS counts 95,560 jobs in the Fort Smith area. That makes it the 210th largest of the 300 metros we cover, with 0.06% of US employment.
| Trade | Weight | 25th pct | Median | 75th pct | US median | Ratio | Level used |
|---|---|---|---|---|---|---|---|
| Cement masons and concrete finishers (47-2051) | 50% | $17.20 | $18.70 | $24.27 | $27.41 | 0.68 | metro |
| Construction laborers (47-2061) | 30% | $16.31 | $17.77 | $21.83 | $22.66 | 0.78 | metro |
| Operating engineers and other construction equipment operators (47-2073) | 10% | $18.15 | $20.11 | $21.12 | $28.78 | 0.70 | metro |
| Carpenters (47-2031) | 10% | $17.84 | $20.39 | $23.62 | $29.12 | 0.70 | metro |
| Blended | 100% | 0.72 | |||||
When to schedule concrete slab in Fort Smith
We use NOAA's 1991-2020 climate normals for Ft Smith Rgnl Ap (in the city). These are 30-year monthly averages, not forecasts.
March through June and September through October are the stretches where pouring concrete runs into the fewest weather problems in Fort Smith (6 of 12 months). January, February, November and December have an average overnight low of 40°F or below; July and August have an average daytime high of 90°F or more.
The 40°F line is a deliberately cautious stand-in. The American Concrete Institute's cold-weather guide (ACI 306R-16) defines cold-weather concreting around an average daily air temperature below 40°F, which is colder than our test of an average overnight low at or below 40°F, so we flag a few extra shoulder months. In cold weather crews may need heated enclosures, insulating blankets or accelerated mixes, and those measures can raise a quote.
Heat matters for concrete as well. With average highs of 90°F or more in July and August, crews often start early, wet the base and plan for faster set times.
Fort Smith gets about 47 inches of precipitation in a normal year, including roughly 3 inches of snow. The wettest months are April, May and June (5.6 inches in May). Inside the workable window, March and September are the driest, at 3.9 and 4.0 inches. The station averages about 78 days a year at 90°F or above.
Does the season change the price? Probably, but we do not have a sourced seasonal price curve, so the estimator shows a year-round figure and does not adjust by month. When you collect quotes, ask whether scheduling in a slower month gets a better rate.
| Month | Avg high °F | Avg low °F | Precip (in) | For this job |
|---|---|---|---|---|
| Jan | 51 | 30 | 2.9 | Cold |
| Feb | 57 | 33 | 2.7 | Cold |
| Mar | 66 | 42 | 3.9 | Workable |
| Apr | 75 | 50 | 4.9 | Workable |
| May | 81 | 60 | 5.6 | Workable |
| Jun | 89 | 68 | 4.6 | Workable |
| Jul | 94 | 72 | 3.4 | Hot |
| Aug | 94 | 71 | 3.6 | Hot |
| Sep | 87 | 63 | 4.0 | Workable |
| Oct | 76 | 51 | 4.4 | Workable |
| Nov | 63 | 40 | 3.9 | Cold |
| Dec | 53 | 32 | 3.5 | Cold |
Fort Smith against nearby metros and the rest of Arkansas
Same job, same size (400 sq ft), priced for the nearest metros. Joplin is the priciest of the group at $3,650.
| Area | Range | Midpoint | vs. here |
|---|---|---|---|
| Fort Smith, ARthis page | $2,050 – $4,400 | $3,200 | |
| Fayetteville, AR50 miles | $2,150 – $4,650 | $3,400 | +6% |
| Tulsa, OK110 miles | $2,200 – $4,650 | $3,400 | +6% |
| Joplin, MO115 miles | $2,350 – $4,950 | $3,650 | +14% |
| Little Rock, AR125 miles | $2,100 – $4,550 | $3,350 | +4% |
| Texarkana, TX135 miles | $2,050 – $4,450 | $3,250 | +1% |
| Arkansas (statewide) | $2,100 – $4,550 | $3,350 | +4% |
| United States | $2,450 – $5,200 | $3,850 | +19% |
Across 300 US metros, Fort Smith comes in at #299 from the top. The priciest is Kahului, HI at $5,300; the cheapest is McAllen, TX at $3,200 (midpoints, 400 sq ft). Statewide, Fort Smith is 4% below the Arkansas figure.
Other Arkansas metros
| Metro | Size | Range | Midpoint | vs. here |
|---|---|---|---|---|
| Little Rock, AR | 358,210 jobs | $2,100 – $4,550 | $3,350 | +4% |
| Fayetteville, AR | 275,180 jobs | $2,150 – $4,650 | $3,400 | +6% |
| Jonesboro, AR | 60,620 jobs | $2,050 – $4,450 | $3,250 | +1% |
Cities with a workforce like Fort Smith's
Big cities and small ones price differently, so here is Fort Smith against the 4 metros with the closest total employment.
| Metro | Size | Range | Midpoint | vs. here |
|---|---|---|---|---|
| Athens, GA | 95,800 jobs | $2,150 – $4,650 | $3,400 | +6% |
| Macon, GA | 95,030 jobs | $2,150 – $4,600 | $3,400 | +5% |
| Yakima, WA | 97,010 jobs | $2,850 – $5,950 | $4,400 | +37% |
| Barnstable, MA | 94,110 jobs | $2,650 – $5,450 | $4,050 | +26% |
Concrete slab: what moves the price in Fort Smith
Thickness and mix
A 4-inch slab uses about 1.23 cubic yards of concrete per 100 sq ft; a 6-inch slab uses about 1.85. Stepping up from a 3,000 PSI to a 4,000-4,500 PSI mix adds $10-$40 per cubic yard (Estimators.us).
Base and reinforcement
A compacted gravel base, vapor barrier, and wire mesh or rebar are priced separately by some contractors and bundled by others. Ask which one your quote does.
Truck and pump access
If the mixer truck can't back up to the forms, someone has to wheelbarrow it in or hire a pump. Pump or line-pump hire is typically billed per day.
Pick a size, pick a tier: concrete slab pricing in Fort Smith
Three bands are cut from the same cited range and localized for Fort Smith wages and prices. They overlap on purpose: a good standard job and a modest premium job can cost the same. The grid below prices the same bands at 5 common sizes.
Basic
$2,050 to $2,950
4-inch broom-finish slab, light mesh, easy truck access
Standard
$2,750 to $3,700
4-5 inch slab with rebar or heavier mesh and standard base prep
Premium
$3,450 to $4,400
6-inch slab, heavy reinforcement, thick base, pump truck or tight access
| Size | Basic | Standard | Premium |
|---|---|---|---|
| 10x10 pad (100 sq ft) | $540 – $870 | $780 – $1,100 | $1,050 – $1,350 |
| 12x12 (144 sq ft) | $760 – $1,200 | $1,050 – $1,500 | $1,400 – $1,800 |
| 20x20 (400 sq ft) | $2,050 – $2,950 | $2,750 – $3,700 | $3,450 – $4,400 |
| 24x24 garage floor (576 sq ft) | $2,900 – $4,200 | $3,900 – $5,200 | $4,850 – $6,200 |
| 30x40 foundation (1,200 sq ft) | $6,000 – $8,600 | $7,950 – $10,600 | $9,900 – $12,500 |
Get 3 local quotes
Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $2,750 to $3,700 for Fort Smith, AR is attached.
Detailed concrete slab report for Fort Smith, AR, $9
Multi-page report for Fort Smith, AR: low, typical and high cost, a line-item breakdown of materials and labor by trade, permit notes, the best months to schedule, a quote comparison sheet, red flags, questions for contractors, checklists and every source. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.
Concrete slab in Fort Smith: your questions
+How much does it cost to pour a concrete slab in Fort Smith?
For 400 sq ft, expect $2,050 to $4,400 in the Fort Smith area. A standard-spec job lands at $2,750 to $3,700. Small jobs usually cost more per sq ft and large ones less.
+What is the price per sq ft for concrete slab in Fort Smith?
About $4.95 to $10 per sq ft for materials and labor, plus $45 to $340 for the permit if one is needed. The US range is $6 to $12.
+Is concrete slab cheaper in Fort Smith or Fayetteville?
Fayetteville is 50 miles away. The midpoint for 400 sq ft there is $3,400, which is 6% more than Fort Smith ($3,200). Wage and materials indexes both feed that gap.
+How much of the bill is labor in Fort Smith?
About 36% at the midpoint, or $1,150 out of $3,200. Materials are 58% and permits 6%. Nationally, labor is 42%.
+What would 20x20 (400 sq ft) cost in Fort Smith?
$2,050 to $4,400. Pick a different size in the estimator above to get your own number.
+Does concrete slab need a permit in Fort Smith?
Often, but rules are set by your city or county building office, so call before you hire. Budget $45 to $340 for fees in the Fort Smith area (our national range of $50 to $400 scaled by the local price level).
+Is Fort Smith expensive for concrete slab compared with the rest of Arkansas?
Fort Smith is 4% below the Arkansas statewide estimate ($3,350 at the midpoint). We cover 4 metros in Arkansas; see the state page to compare them.
+What do cement masons and concrete finishers earn in Fort Smith?
The BLS median is $18.70 an hour in the Fort Smith area, compared with $27.41 nationally. The 25th to 75th percentile range is $17.20 to $24.27.
+What do basic and premium concrete slab work cost in Fort Smith?
For 400 sq ft, basic work runs $2,050 to $2,950 and premium work $3,450 to $4,400. Basic means: 4-inch broom-finish slab, light mesh, easy truck access. Premium means: 6-inch slab, heavy reinforcement, thick base, pump truck or tight access.
+When is the best time to pour a concrete slab in Fort Smith?
Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are March through June and September through October. March and September are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.
+What does "add rebar reinforcement" add in Fort Smith?
$330 to $990 for 400 sq ft, from a national range scaled by the local wage and goods indexes.
Concrete slab near Fort Smith
Where these numbers come from
Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.
- HomeGuide: How Much Does a Concrete Slab Cost? (2026) (accessed November 4, 2026)
- Estimators.us: Concrete Slab Cost in 2026 | $6-$12/Sq Ft Guide (accessed November 4, 2026)
- HomeGuide: How Much Does a Concrete Patio Cost? (2026) (accessed November 4, 2026)
- HomeGuide: How Much Does a Concrete Driveway Cost? (2026) (accessed November 4, 2026)
- BLS Occupational Employment and Wage Statistics, May 2025
- BEA Regional Price Parities, 2024
- NOAA NCEI U.S. Climate Normals, 1991-2020