Skip to content
CostLocal

Concrete driveway cost in College Station, TX

Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.

Typical range (600 sq ft)
$3,050 – $7,550
Per sq ft
$5 – $12.50
before permit
Versus US midpoint
−18%
US $6,450
Rank of 300 metros
#288
1 = most expensive

A concrete driveway in College Station, TX usually costs $3,050 to $7,550 for 600 sq ft. That works out to about $5 to $12.50 per sq ft before permits. Compared with the national midpoint that is $1,150 less. Cement masons and concrete finishers earn a median of $20.81 an hour in the College Station area, 24% below the US median of $27.41.

Estimate your concrete driveway cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

5-inch with rebar and saw-cut joints, a border or one color

Add-ons

Estimated cost for 600 sq ft in College Station, TX, standard level

$4,400 to $6,200

About $7.20 to $10 per sq ft before permits. Labor is about 64% of the bill.

Cost breakdown
PartLowHigh
Materials$1,600$1,950
Labor$2,750$4,100
Permits and fees$85$140
Total$4,400$6,200
Save and get a PDF report

Cost breakdown for 600 sq ft in College Station, TX

Part of the jobLowMidpointHighShare
Materials$1,300$1,750$2,25033%
Labor$1,700$3,400$5,10064%
Permits and fees$45$110$1802%
Total$3,050$5,300$7,550100%

Where the College Station price comes from

The wage side of the estimate leans on cement masons and concrete finishers, who do 50% of the hours on a typical job. Their local median is $20.81 an hour. Add the other trades involved and the blended wage index for College Station is 0.77 (US = 1.00), which puts labor at 64% of the total.

Materials are scaled with BEA's regional price parity for goods. College Station is at 93.8 against 100 for the US, so a materials line of $1,900 nationally becomes $1,750 here (midpoint, 600 sq ft). Permits follow the all-items index of 91.0: $45 to $180.

Is College Station cheap or dear? The local comparison

Same job, same size (600 sq ft), priced for the nearest metros. Austin is the priciest of the group at $5,800.

Comparison with nearby areas
AreaRangeMidpointvs. here
College Station, TXthis page$3,050 – $7,550$5,300
Waco, TX75 miles$3,100 – $7,650$5,350+1%
Austin, TX75 miles$3,300 – $8,250$5,800+9%
Killeen, TX85 miles$3,150 – $7,800$5,450+3%
Houston, TX95 miles$3,300 – $8,150$5,750+8%
Tyler, TX135 miles$3,100 – $7,650$5,400+2%
Texas (statewide)$3,250 – $8,100$5,700+7%
United States$3,650 – $9,200$6,450+21%

Out of the 300 metros we cover, College Station ranks #288 for the cost of this job (#1 is the most expensive). Statewide, College Station is 7% below the Texas figure.

Elsewhere in Texas

Texas metros compared with College Station
MetroSizeRangeMidpointvs. here
Dallas, TX4,049,800 jobs$3,400 – $8,450$5,950+12%
Houston, TX3,289,720 jobs$3,300 – $8,150$5,750+8%
Austin, TX1,293,690 jobs$3,300 – $8,250$5,800+9%
San Antonio, TX1,126,880 jobs$3,150 – $7,900$5,550+4%
El Paso, TX339,120 jobs$3,000 – $7,300$5,150−3%
McAllen, TX296,700 jobs$2,850 – $7,000$4,950−7%

Metros of a similar size

Big cities and small ones price differently, so here is College Station against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
Flint, MI135,040 jobs$3,800 – $9,800$6,800+29%
South Bend, IN131,670 jobs$3,750 – $9,600$6,650+26%
Evansville, IN135,250 jobs$3,900 – $10,000$6,950+31%
Fayetteville, NC131,430 jobs$3,100 – $7,550$5,300level

Why two College Station quotes can differ

  • Grading and drainage

    Professional grading runs $3-$8 per sq ft or $700-$2,500 for a typical job. A sloped lot or poor soil raises it.

  • Finish

    Decorative driveways run $10-$25 per sq ft installed: colors and borders at $10-$15, stamped patterns at $15-$20, and high-end finishes at $20-$25+ (HomeGuide).

  • Permits and the apron

    A driveway permit is typically $50-$200 and is often required for new work. The apron where the driveway meets the street can need a separate right-of-way permit.

What local crews earn in College Station

The labor line is built from BLS wage data, one trade at a time. This job draws on 4 trades. We compare each trade's local median with the US median, weight the ratios by how much of the job each trade does, and apply the blend to the national labor cost. For College Station the blend is 0.77.

Cement masons and concrete finishers (47-2051), 50% of the weighting: a median of $20.81 an hour, 24% below the US median of $27.41. The middle half of them earn between $18.10 and $23.54 an hour. About 260 work in the metro. That is 19.4 per 10,000 jobs, compared with 13.3 nationally, which suggests plenty of local crews to bid.

For construction laborers (47-2061, weighted 30%) the local median is $17.88 an hour, which is 21% below the national $22.66. The middle half of them earn between $16.43 and $20.78 an hour. BLS counts 770 of them working in the area, 57.4 for every 10,000 jobs (US: 70.5), so the local bench is thinner than average.

Operating engineers and other construction equipment operators (47-2073), 10% of the weighting: a median of $23.07 an hour, 20% below the US median of $28.78. The middle half of them earn between $21.42 and $27.69 an hour. About 590 work in the metro. That is 44.0 per 10,000 jobs, compared with 30.7 nationally, which suggests plenty of local crews to bid.

Carpenters (47-2031), 10% of the weighting: a median of $22.58 an hour, 22% below the US median of $29.12. The middle half of them earn between $20.77 and $26.89 an hour. About 170 work in the metro. That is 12.7 per 10,000 jobs, compared with 43.1 nationally, so expect fewer local crews to bid.

A quick sensitivity check: moving the lead trade (cement masons and concrete finishers) from the median to the 75th percentile wage adds about $220 to the midpoint estimate; the 25th percentile takes off about $220. That is a swing of roughly 4.1% to 4.1% of the total, which is useful for judging whether a bid reflects wages or something else, such as scope or margin.

College Station-Bryan has 134,040 jobs in total (BLS, May 2025), ranking 164th by size among the 300 metros on this site.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Cement masons and concrete finishers (47-2051)50%$18.10$20.81$23.54$27.410.76metro
Construction laborers (47-2061)30%$16.43$17.88$20.78$22.660.79metro
Operating engineers and other construction equipment operators (47-2073)10%$21.42$23.07$27.69$28.780.80metro
Carpenters (47-2031)10%$20.77$22.58$26.89$29.120.78metro
Blended100%0.77

What nearby projects cost in College Station

Jobs that often go together with concrete driveway are priced below at their usual sizes, using the same College Station wage and price inputs. Compared with national midpoints, asphalt driveway comes out highest (−12%) and concrete patio lowest (−15%); the gap comes from the trades each job uses.

Related projects with local prices
ProjectSizeRangevs. US
Asphalt driveway600 sq ft$2,700 – $6,500−12%
Gravel driveway1,000 sq ft$2,150 – $8,850−13%
Concrete slab400 sq ft$2,100 – $4,550−13%
Stamped concrete400 sq ft$2,800 – $6,800−14%
Paver patio300 sq ft$2,550 – $4,650−14%
Concrete patio300 sq ft$1,100 – $3,350−15%

College Station weather and the concrete driveway calendar

Climate numbers on this page come from NOAA's 1991-2020 U.S. Climate Normals at the nearest suitable station, College Stn (5 miles from the city center). They are 30-year averages, so any one year can run hotter, colder or wetter.

For pouring concrete, the comfortable months in College Station are October through May: 8 of 12. Outside them, June, July, August and September have an average daytime high of 90°F or more.

Heat matters for concrete as well. With average highs of 90°F or more in June, July, August and September, crews often start early, wet the base and plan for faster set times.

College Station gets about 42 inches of precipitation in a normal year. The wettest months are May, June and October (4.9 inches in October). Inside the workable window, February and April are the driest, at 2.9 and 2.9 inches. The station averages about 117 days a year at 90°F or above.

We do not adjust the estimate by month, because we have no reliable published data on seasonal pricing. It is still worth asking contractors whether an off-peak start date changes their bid.

Monthly normals, College Stn (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan62413.4Workable
Feb66452.9Workable
Mar73523.4Workable
Apr79582.9Workable
May86664.6Workable
Jun92734.0Hot
Jul95752.0Hot
Aug97753.1Hot
Sep91703.5Hot
Oct82604.9Workable
Nov71503.3Workable
Dec63433.7Workable

Extras that change the College Station total

Add-ons start from national price ranges and are scaled by 0.86 for College Station, which is the average of the area's wage index (0.77) and goods price index (0.94). The estimator above can add them to your total.

Add-on prices
Add-onLocal range
Add rebar reinforcement$510 – $1,550
Remove the old driveway$1,050 – $3,100

Pick a size, pick a tier: concrete driveway pricing in College Station

The cited range is split into basic, standard and premium bands, then scaled to College Station. Bands overlap, because plenty of standard jobs cost as much as a light premium one. Sizes run from 1-car (12x20), 240 sq ft to 3-car (900 sq ft).

Basic

$3,050 to $4,850

Plain gray, 4-inch broom finish, flat site

Standard

$4,400 to $6,200

5-inch with rebar and saw-cut joints, a border or one color

Premium

$5,750 to $7,550

6-inch for heavy vehicles, stamped or colored, grading needed

Cost by size and quality level
SizeBasicStandardPremium
1-car (12x20), 240 sq ft$1,250 – $2,000$1,800 – $2,550$2,400 – $3,150
2-car (20x24), 480 sq ft$2,450 – $3,900$3,550 – $5,000$4,600 – $6,050
2-car + apron (600 sq ft)$3,050 – $4,850$4,400 – $6,200$5,750 – $7,550
3-car (900 sq ft)$4,550 – $7,250$6,550 – $9,200$8,550 – $11,200

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $4,400 to $6,200 for College Station, TX is attached.

Detailed concrete driveway report for College Station, TX, $9

The report lays out the concrete driveway numbers for College Station, TX line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Concrete driveway in College Station: your questions

+How much does it cost to pour a concrete driveway in College Station?

For 600 sq ft, expect $3,050 to $7,550 in the College Station area. A standard-spec job lands at $4,400 to $6,200. Small jobs usually cost more per sq ft and large ones less.

+What is the price per sq ft for concrete driveway in College Station?

About $5 to $12.50 per sq ft for materials and labor, plus $45 to $180 for the permit if one is needed. The US range is $6 to $15.

+Is concrete driveway cheaper in College Station or Waco?

Waco is 75 miles away. The midpoint for 600 sq ft there is $5,350, which is 1% more than College Station ($5,300). Wage and materials indexes both feed that gap.

+How much of the bill is labor in College Station?

About 64% at the midpoint, or $3,400 out of $5,300. Materials are 33% and permits 2%. Nationally, labor is 69%.

+What would 2-car + apron (600 sq ft) cost in College Station?

$3,050 to $7,550. Pick a different size in the estimator above to get your own number.

+Does concrete driveway need a permit in College Station?

Often, but rules are set by your city or county building office, so call before you hire. Budget $45 to $180 for fees in the College Station area (our national range of $50 to $200 scaled by the local price level).

+Is College Station expensive for concrete driveway compared with the rest of Texas?

College Station is 7% below the Texas statewide estimate ($5,700 at the midpoint). We cover 21 metros in Texas; see the state page to compare them.

+What do cement masons and concrete finishers earn in College Station?

The BLS median is $20.81 an hour in the College Station area, compared with $27.41 nationally. The 25th to 75th percentile range is $18.10 to $23.54.

+What do basic and premium concrete driveway work cost in College Station?

For 600 sq ft, basic work runs $3,050 to $4,850 and premium work $5,750 to $7,550. Basic means: plain gray, 4-inch broom finish, flat site. Premium means: 6-inch for heavy vehicles, stamped or colored, grading needed.

+When is the best time to pour a concrete driveway in College Station?

Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are October through May. February and April are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.

+What does "add rebar reinforcement" add in College Station?

$510 to $1,550 for 600 sq ft, from a national range scaled by the local wage and goods indexes.

Concrete driveway near College Station

Concrete driveway: all pricesConcrete driveway in TexasAll projects in College StationTexas cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.

Note on derived figures: Materials = SimplyWise's sample 600 sq ft, 4-inch driveway line ($1,400-$2,400 in materials) divided by 600 sq ft.