Stamped concrete cost in Springfield, MO

Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.

Typical range (400 sq ft)
$3,150 – $7,750
Per sq ft
$7.75 – $18.50
before permit
Versus US midpoint
−3%
US $5,600
Rank of 300 metros
#153
1 = most expensive

Local price for stamped concrete in the Springfield area: $3,150 to $7,750 for 400 sq ft. The low end is a basic job on easy ground; the high end is a premium spec with harder access. The midpoint lands close to the US figure. Building materials run about 6% below the US average here (BEA goods price index 94.2).

Estimate your stamped concrete cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

Two-tone color release and a border

Add-ons

Estimated cost for 400 sq ft in Springfield, MO, standard level

$4,550 to $6,350

About $11 to $15.50 per sq ft before permits. Labor is about 50% of the bill.

Cost breakdown
PartLowHigh
Materials$2,200$2,900
Labor$2,200$3,250
Permits and fees$120$230
Total$4,550$6,350
Save and get a PDF report

Cost breakdown for 400 sq ft in Springfield, MO

Part of the jobLowMidpointHighShare
Materials$1,700$2,550$3,40047%
Labor$1,400$2,750$4,05050%
Permits and fees$45$180$3103%
Total$3,150$5,450$7,750100%

Where the Springfield price comes from

Labor is 50% of the midpoint bill here, against 48% nationally. The mix of trades behind this job is cement masons and concrete finishers (60%), construction laborers (30%), operating engineers and other construction equipment operators (10%). We weight each trade's local median wage by that share and compare it with the national median. In Springfield the blended ratio comes out at 1.01.

Materials are scaled with BEA's regional price parity for goods. Springfield is at 94.2 against 100 for the US, so a materials line of $2,700 nationally becomes $2,550 here (midpoint, 400 sq ft). Permits follow the all-items index of 88.6: $45 to $310.

The best months for stamped concrete in Springfield

Climate numbers on this page come from NOAA's 1991-2020 U.S. Climate Normals at the nearest suitable station, Springfield Wbo (in the city). They are 30-year averages, so any one year can run hotter, colder or wetter.

For pouring concrete, the comfortable months in Springfield are April through October: 7 of 12. Outside them, January, February, March, November and December have an average overnight low of 40°F or below.

The 40°F line is a deliberately cautious stand-in. The American Concrete Institute's cold-weather guide (ACI 306R-16) defines cold-weather concreting around an average daily air temperature below 40°F, which is colder than our test of an average overnight low at or below 40°F, so we flag a few extra shoulder months. In cold weather crews may need heated enclosures, insulating blankets or accelerated mixes, and those measures can raise a quote.

Springfield gets about 47 inches of precipitation in a normal year. The wettest months are April, May and June (6.0 inches in May). Inside the workable window, August and October are the driest, at 3.6 and 3.6 inches. The station averages about 38 days a year at 90°F or above.

We do not adjust the estimate by month, because we have no reliable published data on seasonal pricing. It is still worth asking contractors whether an off-peak start date changes their bid.

Monthly normals, Springfield Wbo (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan43232.4Cold
Feb48262.4Cold
Mar58353.7Cold
Apr67445.2Workable
May75566.0Workable
Jun84644.9Workable
Jul88683.9Workable
Aug88673.6Workable
Sep81584.5Workable
Oct69463.6Workable
Nov57353.6Cold
Dec46272.6Cold

Cost by quality level and size in Springfield

The cited range is split into basic, standard and premium bands, then scaled to Springfield. Bands overlap, because plenty of standard jobs cost as much as a light premium one. Sizes run from 10x20 patio (200 sq ft) to 2-car driveway (600 sq ft).

Basic

$3,150 to $5,000

Basic pattern, one integral color

Standard

$4,550 to $6,350

Two-tone color release and a border

Premium

$5,900 to $7,750

Multi-color, hand-detailed, sealed to a high finish

Cost by size and quality level
SizeBasicStandardPremium
10x20 patio (200 sq ft)$1,600 – $2,550$2,350 – $3,300$3,050 – $4,000
20x20 patio (400 sq ft)$3,150 – $5,000$4,550 – $6,350$5,900 – $7,750
2-car driveway (600 sq ft)$4,700 – $7,400$6,750 – $9,450$8,750 – $11,500

Why two Springfield quotes can differ

  • Not included

    These prices don't include site prep that depends on the project: demolition, grading, or a thicker base.

  • Pattern and color

    Basic to average coloring runs $8-$19 per sq ft. A 2-car stamped driveway runs $12-$18 per sq ft (HomeGuide); Estimators.us puts decorative slabs at $15-$30.

  • Specialist labor

    Stamping has to be done before the concrete sets, so crews arrive in larger teams and charge for it.

Who does the work: Springfield trade wages

The labor line is built from BLS wage data, one trade at a time. This job draws on 3 trades. We compare each trade's local median with the US median, weight the ratios by how much of the job each trade does, and apply the blend to the national labor cost. For Springfield the blend is 1.01.

Cement masons and concrete finishers (47-2051), 60% of the weighting: a median of $28.13 an hour, in line with the US median of $27.41. The middle half of them earn between $21.37 and $30.38 an hour. About 540 work in the metro. That is 24.2 per 10,000 jobs, compared with 13.3 nationally, which suggests plenty of local crews to bid.

For construction laborers (47-2061, weighted 30%) the local median is $23.00 an hour, which is in line with the national $22.66. The middle half of them earn between $19.26 and $28.96 an hour. BLS counts 1,020 of them working in the area, 45.7 for every 10,000 jobs (US: 70.5), so the local bench is thinner than average.

Operating engineers and other construction equipment operators (47-2073), 10% of the weighting: a median of $25.64 an hour, 11% below the US median of $28.78. The middle half of them earn between $23.04 and $35.39 an hour. About 530 work in the metro. That is 23.8 per 10,000 jobs, compared with 30.7 nationally, so expect fewer local crews to bid.

A quick sensitivity check: moving the lead trade (cement masons and concrete finishers) from the median to the 75th percentile wage adds about $130 to the midpoint estimate; the 25th percentile takes off about $400. That is a swing of roughly 7.3% to 2.4% of the total, which is useful for judging whether a bid reflects wages or something else, such as scope or margin.

Springfield has 223,030 jobs in total (BLS, May 2025), ranking 108th by size among the 300 metros on this site.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Cement masons and concrete finishers (47-2051)60%$21.37$28.13$30.38$27.411.03metro
Construction laborers (47-2061)30%$19.26$23.00$28.96$22.661.02metro
Operating engineers and other construction equipment operators (47-2073)10%$23.04$25.64$35.39$28.780.89metro
Blended100%1.01

Related projects, priced for Springfield

Jobs that often go together with stamped concrete are priced below at their usual sizes, using the same Springfield wage and price inputs. Compared with national midpoints, concrete driveway comes out highest (−2%) and asphalt driveway lowest (−7%); the gap comes from the trades each job uses.

Related projects with local prices
ProjectSizeRangevs. US
Concrete patio300 sq ft$1,200 – $3,850−4%
Concrete driveway600 sq ft$3,550 – $9,000−2%
Paver patio300 sq ft$2,900 – $5,250−3%
Concrete slab400 sq ft$2,350 – $5,000−4%
Asphalt driveway600 sq ft$2,850 – $6,900−7%
Gravel driveway1,000 sq ft$2,350 – $9,650−5%

Optional extras in Springfield

Add-ons start from national price ranges and are scaled by 0.98 for Springfield, which is the average of the area's wage index (1.01) and goods price index (0.94). The estimator above can add them to your total.

Add-on prices
Add-onLocal range
Add a vapor barrier$200 – $390

How Springfield compares

Same job, same size (400 sq ft), priced for the nearest metros. Jefferson City is the priciest of the group at $5,700. Fayetteville is the cheapest at $4,950.

Comparison with nearby areas
AreaRangeMidpointvs. here
Springfield, MOthis page$3,150 – $7,750$5,450
Joplin, MO75 miles$3,150 – $7,700$5,400−1%
Fayetteville, AR100 miles$2,900 – $7,050$4,950−9%
Jefferson City, MO105 miles$3,300 – $8,100$5,700+5%
Columbia, MO115 miles$3,250 – $8,000$5,650+3%
Kansas City, MO130 miles$3,250 – $8,050$5,650+4%
Missouri (statewide)$3,350 – $8,200$5,750+6%
United States$3,250 – $7,950$5,600+3%

Out of the 300 metros we cover, Springfield ranks #153 for the cost of this job (#1 is the most expensive). Statewide, Springfield is 6% below the Missouri figure.

Elsewhere in Missouri

Missouri metros compared with Springfield
MetroSizeRangeMidpointvs. here
St. Louis, MO1,341,320 jobs$3,550 – $8,850$6,200+14%
Kansas City, MO1,096,110 jobs$3,250 – $8,050$5,650+4%
Columbia, MO107,680 jobs$3,250 – $8,000$5,650+3%
Joplin, MO87,190 jobs$3,150 – $7,700$5,400−1%
Jefferson City, MO80,220 jobs$3,300 – $8,100$5,700+5%

Metros of a similar size

Big cities and small ones price differently, so here is Springfield against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
Fort Wayne, IN225,520 jobs$3,250 – $8,000$5,600+3%
Deltona, FL219,740 jobs$3,000 – $7,250$5,100−6%
Augusta, GA231,930 jobs$2,900 – $7,050$5,000−8%
Ann Arbor, MI219,730 jobs$3,200 – $7,950$5,600+3%

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $4,550 to $6,350 for Springfield, MO is attached.

A detailed PDF report of this estimate, $9

The report lays out the stamped concrete numbers for Springfield, MO line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Stamped concrete in Springfield: your questions

+How much does it cost to pour stamped concrete in Springfield?

For 400 sq ft, expect $3,150 to $7,750 in the Springfield area. A standard-spec job lands at $4,550 to $6,350. Small jobs usually cost more per sq ft and large ones less.

+What is the price per sq ft for stamped concrete in Springfield?

About $7.75 to $18.50 per sq ft for materials and labor, plus $45 to $310 for the permit if one is needed. The US range is $8 to $19.

+Is stamped concrete cheaper in Springfield or Joplin?

Joplin is 75 miles away. The midpoint for 400 sq ft there is $5,400, which is 1% less than Springfield ($5,450). Wage and materials indexes both feed that gap.

+How much of the bill is labor in Springfield?

About 50% at the midpoint, or $2,750 out of $5,450. Materials are 47% and permits 3%. Nationally, labor is 48%.

+What would 20x20 patio (400 sq ft) cost in Springfield?

$3,150 to $7,750. Pick a different size in the estimator above to get your own number.

+Does stamped concrete need a permit in Springfield?

Often, but rules are set by your city or county building office, so call before you hire. Budget $45 to $310 for fees in the Springfield area (our national range of $50 to $350 scaled by the local price level).

+Is Springfield expensive for stamped concrete compared with the rest of Missouri?

Springfield is 6% below the Missouri statewide estimate ($5,750 at the midpoint). We cover 6 metros in Missouri; see the state page to compare them.

+What do cement masons and concrete finishers earn in Springfield?

The BLS median is $28.13 an hour in the Springfield area, compared with $27.41 nationally. The 25th to 75th percentile range is $21.37 to $30.38.

+What do basic and premium stamped concrete work cost in Springfield?

For 400 sq ft, basic work runs $3,150 to $5,000 and premium work $5,900 to $7,750. Basic means: basic pattern, one integral color. Premium means: multi-color, hand-detailed, sealed to a high finish.

+When is the best time to pour stamped concrete in Springfield?

Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are April through October. August and October are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.

+What does "add a vapor barrier" add in Springfield?

$200 to $390 for 400 sq ft, from a national range scaled by the local wage and goods indexes.

Stamped concrete near Springfield

Stamped concrete: all pricesStamped concrete in MissouriAll projects in SpringfieldMissouri cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.

Note on derived figures: Materials = SimplyWise's 200 sq ft stamped-patio line ($900-$1,800), divided by 200 sq ft.