Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.

Typical range (60 linear ft)
$560 – $2,000
Per linear ft
$9.40 – $33
before permit
Versus US midpoint
−6%
US $1,350
Rank of 300 metros
#202
1 = most expensive

Hilton Head homeowners pay roughly $560 to $2,000 to install a French drain at 60 linear ft, or $9.40 to $33 per linear ft (permit not included). Against the US midpoint, Hilton Head is 6% lower. Construction laborers earn a median of $21.99 an hour in the Hilton Head area, 3% below the US median of $22.66.

Estimate your french drain cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

Standard drain with fabric, gravel and a pop-up outlet

Estimated cost for 60 linear ft in Hilton Head, SC, standard level

$990 to $1,550

About $16.50 to $26 per linear ft before permits. Labor is about 51% of the bill.

Cost breakdown
PartLowHigh
Materials$490$760
Labor$500$790
Permits and fees$0$0
Total$990$1,550
Save and get a PDF report

Cost breakdown for 60 linear ft in Hilton Head, SC

Part of the jobLowMidpointHighShare
Materials$280$620$97049%
Labor$290$650$1,00051%
Permits and fees$0$0$00%
Total$560$1,250$2,000100%

What is behind the Hilton Head number

Labor is 51% of the midpoint bill here, against 52% nationally. The mix of trades behind this job is construction laborers (50%), operating engineers and other construction equipment operators (30%), pipelayers (20%). We weight each trade's local median wage by that share and compare it with the national median. In Hilton Head the blended ratio comes out at 0.92.

On the materials line, the BEA goods price index for the Hilton Head metro is 96.3 (US = 100). The midpoint materials bill for 60 linear ft comes to $620, compared with $650 at national prices. Permit and inspection fees are scaled by the broader index (98.0) and land at $0 to $0.

Hilton Head: what basic, standard and premium work costs

Three bands are cut from the same cited range and localized for Hilton Head wages and prices. They overlap on purpose: a good standard job and a modest premium job can cost the same. The grid below prices the same bands at 3 common sizes.

Basic

$560 to $1,150

Shallow yard drain, easy digging

Standard

$990 to $1,550

Standard drain with fabric, gravel and a pop-up outlet

Premium

$1,400 to $2,000

Deep or long drain, hard soil, dry well or sump discharge

Cost by size and quality level
SizeBasicStandardPremium
short run (30 linear ft)$280 – $560$490 – $780$710 – $990
side yard (60 linear ft)$560 – $1,150$990 – $1,550$1,400 – $2,000
long run (120 linear ft)$1,150 – $2,250$2,000 – $3,100$2,800 – $3,950

What nearby projects cost in Hilton Head

Because every project leans on different trades, Hilton Head's wage level does not move all prices equally. Against the US midpoint, sod installation runs −3% and retaining wall −9%.

Related projects with local prices
ProjectSizeRangevs. US
Retaining wall200 sq ft of wall face$6,350 – $12,400−9%
Gravel driveway1,000 sq ft$2,350 – $9,550−6%
Sod installation1,500 sq ft$1,450 – $3,200−3%
Concrete slab400 sq ft$2,250 – $4,850−7%
Sprinkler system4,000 sq ft of lawn$3,750 – $9,300−7%
Inground pool450 sq ft$33,300 – $104,000−8%

Why two Hilton Head quotes can differ

  • Exterior versus interior

    A shallow exterior French drain is $10-$35 per linear foot; an interior basement drain is $40-$85 per foot, or $4,000-$17,000 installed (HomeGuide).

  • Where the water goes

    A sump pump adds $500-$1,800 and a dry well $50-$3,000+. Discharging to a storm drain can mean extra permit fees.

  • Depth and soil

    Rocky or clay soil and long trenches raise excavation time.

Local wages behind the labor line

Wages are the part of this estimate that changes most from town to town. 3 trades carry the job here, and each is compared with its US median. The weighted result for Hilton Head is 0.92 times the national level.

Construction laborers (47-2061), 50% of the weighting: a median of $21.99 an hour, in line with the US median of $22.66. The middle half of them earn between $18.13 and $25.12 an hour. About 910 work in the metro. That is 111.1 per 10,000 jobs, compared with 70.5 nationally, which suggests plenty of local crews to bid.

For operating engineers and other construction equipment operators (47-2073, weighted 30%) the local median is $24.39 an hour, which is 15% below the national $28.78. The middle half of them earn between $23.23 and $28.60 an hour. BLS counts 320 of them working in the area, 39.1 for every 10,000 jobs (US: 30.7), so the local bench is deeper than average.

Pipelayers (47-2151), 20% of the weighting: a median of $21.24 an hour, 10% below the US median of $23.56. The middle half of them earn between $19.77 and $22.26 an hour. About 80 work in the metro. That is 9.8 per 10,000 jobs, compared with 2.1 nationally, which suggests plenty of local crews to bid.

Quotes come from real crews, not medians. If the construction laborers on your job are paid at the 75th percentile ($25.12 an hour) instead of the median, the labor line grows by about $50. At the 25th percentile ($18.13) it shrinks by about $60. The total moves by 3.8% or 4.7%, so wages alone rarely explain a quote that is far outside our range.

For context on the local economy, BLS counts 81,920 jobs in the Hilton Head Island-Bluffton-Port Royal area. That makes it the 232nd largest of the 300 metros we cover, with 0.05% of US employment.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Construction laborers (47-2061)50%$18.13$21.99$25.12$22.660.97metro
Operating engineers and other construction equipment operators (47-2073)30%$23.23$24.39$28.60$28.780.85metro
Pipelayers (47-2151)20%$19.77$21.24$22.26$23.560.90metro
Blended100%0.92

When to schedule French drain in Hilton Head

We use NOAA's 1991-2020 climate normals for Beaufort Mcas (10 miles from the city center). These are 30-year monthly averages, not forecasts.

September through June is the stretch where digging, grading and setting material in the ground runs into the fewest weather problems in Hilton Head (10 of 12 months). July and August have an average daytime high of 90°F or more.

Hilton Head gets about 45 inches of precipitation in a normal year. The wettest months are June, July and August (6.5 inches in August). Inside the workable window, May and November are the driest, at 2.5 and 2.5 inches. The station averages about 73 days a year at 90°F or above.

Does the season change the price? Probably, but we do not have a sourced seasonal price curve, so the estimator shows a year-round figure and does not adjust by month. When you collect quotes, ask whether scheduling in a slower month gets a better rate.

Monthly normals, Beaufort Mcas (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan60402.9Workable
Feb64432.9Workable
Mar70493.1Workable
Apr77563.1Workable
May84642.5Workable
Jun89715.0Workable
Jul92755.6Hot
Aug90746.5Hot
Sep86704.0Workable
Oct78593.8Workable
Nov69482.5Workable
Dec63433.2Workable

Hilton Head against nearby metros and the rest of South Carolina

Same job, same size (60 linear ft), priced for the nearest metros. Hilton Head is the priciest of the group. Savannah is the cheapest at $1,200.

Comparison with nearby areas
AreaRangeMidpointvs. here
Hilton Head, SCthis page$560 – $2,000$1,250
Savannah, GA30 miles$540 – $1,900$1,200−5%
Charleston, SC65 miles$560 – $1,950$1,250level
Augusta, GA100 miles$540 – $1,900$1,200−5%
Columbia, SC115 miles$550 – $1,950$1,250−2%
Florence, SC135 miles$550 – $1,950$1,250−3%
South Carolina (statewide)$550 – $1,950$1,250−2%
United States$600 – $2,100$1,350+6%

Across 300 US metros, Hilton Head comes in at #202 from the top. The priciest is San Francisco, CA at $1,900; the cheapest is McAllen, TX at $1,100 (midpoints, 60 linear ft). Statewide, Hilton Head is 2% above the South Carolina figure.

Other South Carolina metros

South Carolina metros compared with Hilton Head
MetroSizeRangeMidpointvs. here
Greenville, SC434,900 jobs$560 – $1,950$1,250−1%
Columbia, SC394,200 jobs$550 – $1,950$1,250−2%
Charleston, SC394,170 jobs$560 – $1,950$1,250level
Spartanburg, SC165,150 jobs$550 – $1,950$1,250−2%
Myrtle Beach, SC146,260 jobs$530 – $1,850$1,200−6%
Florence, SC89,060 jobs$550 – $1,950$1,250−3%

Cities with a workforce like Hilton Head's

Big cities and small ones price differently, so here is Hilton Head against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
Bowling Green, KY82,160 jobs$580 – $2,050$1,300+4%
Idaho Falls, ID81,840 jobs$600 – $2,100$1,350+7%
Houma, LA83,440 jobs$530 – $1,850$1,200−7%
Johnson City, TN81,690 jobs$540 – $1,900$1,200−4%

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $990 to $1,550 for Hilton Head, SC is attached.

Take this estimate with you: PDF report, $9

The report lays out the french drain numbers for Hilton Head, SC line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

French drain in Hilton Head: your questions

+How much does it cost to install a French drain in Hilton Head?

For 60 linear ft, expect $560 to $2,000 in the Hilton Head area. A standard-spec job lands at $990 to $1,550. Small jobs usually cost more per linear ft and large ones less.

+What is the price per linear ft for French drain in Hilton Head?

About $9.40 to $33 per linear ft for materials and labor, plus $0 to $0 for the permit if one is needed. The US range is $10 to $35.

+Is French drain cheaper in Hilton Head or Savannah?

Savannah is 30 miles away. The midpoint for 60 linear ft there is $1,200, which is 5% less than Hilton Head ($1,250). Wage and materials indexes both feed that gap.

+How much of the bill is labor in Hilton Head?

About 51% at the midpoint, or $650 out of $1,250. Materials are 49% and permits 0%. Nationally, labor is 52%.

+What would side yard (60 linear ft) cost in Hilton Head?

$560 to $2,000. Pick a different size in the estimator above to get your own number.

+Does French drain need a permit in Hilton Head?

Often, but rules are set by your city or county building office, so call before you hire. Budget $0 to $0 for fees in the Hilton Head area (our national range of $0 to $0 scaled by the local price level).

+Is Hilton Head expensive for French drain compared with the rest of South Carolina?

Hilton Head is 2% above the South Carolina statewide estimate ($1,250 at the midpoint). We cover 7 metros in South Carolina; see the state page to compare them.

+What do construction laborers earn in Hilton Head?

The BLS median is $21.99 an hour in the Hilton Head area, compared with $22.66 nationally. The 25th to 75th percentile range is $18.13 to $25.12.

+What do basic and premium French drain work cost in Hilton Head?

For 60 linear ft, basic work runs $560 to $1,150 and premium work $1,400 to $2,000. Basic means: shallow yard drain, easy digging. Premium means: deep or long drain, hard soil, dry well or sump discharge.

+When is the best time to install a French drain in Hilton Head?

Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are September through June. May and November are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.

French drain near Hilton Head

French drain: all pricesFrench drain in South CarolinaAll projects in Hilton HeadSouth Carolina cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.

Note on derived figures: Materials = 48% of the installed price, from Cost to Renovate's mid-range 'Outdoor Living' category split (44% labor, 48% materials). It is a category average, not a French-drain figure, so the materials line here is a rough one.