Concrete slab cost in Hilton Head, SC
Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.
- Typical range (400 sq ft)
- $2,250 – $4,850
- Per sq ft
- $5.55 – $11
- before permit
- Versus US midpoint
- −7%
- US $3,850
- Rank of 300 metros
- #187
- 1 = most expensive
Local price for a concrete slab in the Hilton Head area: $2,250 to $4,850 for 400 sq ft. The low end is a basic job on easy ground; the high end is a premium spec with harder access. The midpoint runs 7% lower than the US figure. Cement masons and concrete finishers earn a median of $23.76 an hour in the Hilton Head area, 13% below the US median of $27.41.
Estimate your concrete slab cost
Pick a size, a quality level and where you live. Prices update as you type.
Estimated cost for 400 sq ft in Hilton Head, SC, standard level
$3,050 to $4,100
About $7.25 to $9.50 per sq ft before permits. Labor is about 40% of the bill.
| Part | Low | High |
|---|---|---|
| Materials | $1,600 | $2,250 |
| Labor | $1,300 | $1,550 |
| Permits and fees | $150 | $290 |
| Total | $3,050 | $4,100 |
Cost breakdown for 400 sq ft in Hilton Head, SC
| Part of the job | Low | Midpoint | High | Share |
|---|---|---|---|---|
| Materials | $1,150 | $1,950 | $2,700 | 54% |
| Labor | $1,050 | $1,400 | $1,800 | 40% |
| Permits and fees | $50 | $220 | $390 | 6% |
| Total | $2,250 | $3,550 | $4,850 | 100% |
Where the Hilton Head price comes from
The wage side of the estimate leans on cement masons and concrete finishers, who do 50% of the hours on a typical job. Their local median is $23.76 an hour. Add the other trades involved and the blended wage index for Hilton Head is 0.89 (US = 1.00), which puts labor at 40% of the total.
Materials are scaled with BEA's regional price parity for goods. Hilton Head is at 96.3 against 100 for the US, so a materials line of $2,000 nationally becomes $1,950 here (midpoint, 400 sq ft). Permits follow the all-items index of 98.0: $50 to $390.
Planning more than one job in Hilton Head?
Jobs that often go together with concrete slab are priced below at their usual sizes, using the same Hilton Head wage and price inputs. Compared with national midpoints, asphalt driveway comes out highest (−6%) and concrete driveway lowest (−9%); the gap comes from the trades each job uses.
| Project | Size | Range | vs. US |
|---|---|---|---|
| Concrete driveway | 600 sq ft | $3,350 – $8,400 | −9% |
| Concrete patio | 300 sq ft | $1,150 – $3,700 | −7% |
| Detached garage | 576 sq ft | $26,500 – $53,100 | −9% |
| Stamped concrete | 400 sq ft | $3,050 – $7,400 | −7% |
| Asphalt driveway | 600 sq ft | $2,850 – $6,900 | −6% |
| Gravel driveway | 1,000 sq ft | $2,350 – $9,550 | −6% |
Why two Hilton Head quotes can differ
Truck and pump access
If the mixer truck can't back up to the forms, someone has to wheelbarrow it in or hire a pump. Pump or line-pump hire is typically billed per day.
Small-job minimums
Many crews have a minimum charge, so a 10x10 pad can cost more per square foot than a 20x20 slab.
Finish
A broom finish is the baseline. Stamped, stained, or exposed-aggregate finishes are priced as add-ons on top of the slab.
The best months for concrete slab in Hilton Head
Climate numbers on this page come from NOAA's 1991-2020 U.S. Climate Normals at the nearest suitable station, Beaufort Mcas (10 miles from the city center). They are 30-year averages, so any one year can run hotter, colder or wetter.
For pouring concrete, the comfortable months in Hilton Head are February through June and September through December: 9 of 12. Outside them, January has an average overnight low of 40°F or below, and July and August have an average daytime high of 90°F or more.
The 40°F line is a deliberately cautious stand-in. The American Concrete Institute's cold-weather guide (ACI 306R-16) defines cold-weather concreting around an average daily air temperature below 40°F, which is colder than our test of an average overnight low at or below 40°F, so we flag a few extra shoulder months. In cold weather crews may need heated enclosures, insulating blankets or accelerated mixes, and those measures can raise a quote.
Heat matters for concrete as well. With average highs of 90°F or more in July and August, crews often start early, wet the base and plan for faster set times.
Hilton Head gets about 45 inches of precipitation in a normal year. The wettest months are June, July and August (6.5 inches in August). Inside the workable window, May and November are the driest, at 2.5 and 2.5 inches. The station averages about 73 days a year at 90°F or above.
We do not adjust the estimate by month, because we have no reliable published data on seasonal pricing. It is still worth asking contractors whether an off-peak start date changes their bid.
| Month | Avg high °F | Avg low °F | Precip (in) | For this job |
|---|---|---|---|---|
| Jan | 60 | 40 | 2.9 | Cold |
| Feb | 64 | 43 | 2.9 | Workable |
| Mar | 70 | 49 | 3.1 | Workable |
| Apr | 77 | 56 | 3.1 | Workable |
| May | 84 | 64 | 2.5 | Workable |
| Jun | 89 | 71 | 5.0 | Workable |
| Jul | 92 | 75 | 5.6 | Hot |
| Aug | 90 | 74 | 6.5 | Hot |
| Sep | 86 | 70 | 4.0 | Workable |
| Oct | 78 | 59 | 3.8 | Workable |
| Nov | 69 | 48 | 2.5 | Workable |
| Dec | 63 | 43 | 3.2 | Workable |
Who does the work: Hilton Head trade wages
The labor line is built from BLS wage data, one trade at a time. This job draws on 4 trades. We compare each trade's local median with the US median, weight the ratios by how much of the job each trade does, and apply the blend to the national labor cost. For Hilton Head the blend is 0.89.
Cement masons and concrete finishers (47-2051), 50% of the weighting: a median of $23.76 an hour, 13% below the US median of $27.41. The middle half of them earn between $22.77 and $28.96 an hour. About 90 work in the metro. That is 11.0 per 10,000 jobs, compared with 13.3 nationally, so expect fewer local crews to bid.
For construction laborers (47-2061, weighted 30%) the local median is $21.99 an hour, which is in line with the national $22.66. The middle half of them earn between $18.13 and $25.12 an hour. BLS counts 910 of them working in the area, 111.1 for every 10,000 jobs (US: 70.5), so the local bench is deeper than average.
Operating engineers and other construction equipment operators (47-2073), 10% of the weighting: a median of $24.39 an hour, 15% below the US median of $28.78. The middle half of them earn between $23.23 and $28.60 an hour. About 320 work in the metro. That is 39.1 per 10,000 jobs, compared with 30.7 nationally, which suggests plenty of local crews to bid.
Carpenters (47-2031), 10% of the weighting: a median of $23.59 an hour, 19% below the US median of $29.12. The middle half of them earn between $21.25 and $29.40 an hour. About 440 work in the metro. That is 53.7 per 10,000 jobs, compared with 43.1 nationally, which suggests plenty of local crews to bid.
A quick sensitivity check: moving the lead trade (cement masons and concrete finishers) from the median to the 75th percentile wage adds about $150 to the midpoint estimate; the 25th percentile takes off about $30. That is a swing of roughly 0.8% to 4.2% of the total, which is useful for judging whether a bid reflects wages or something else, such as scope or margin.
Hilton Head Island-Bluffton-Port Royal has 81,920 jobs in total (BLS, May 2025), ranking 232nd by size among the 300 metros on this site.
| Trade | Weight | 25th pct | Median | 75th pct | US median | Ratio | Level used |
|---|---|---|---|---|---|---|---|
| Cement masons and concrete finishers (47-2051) | 50% | $22.77 | $23.76 | $28.96 | $27.41 | 0.87 | metro |
| Construction laborers (47-2061) | 30% | $18.13 | $21.99 | $25.12 | $22.66 | 0.97 | metro |
| Operating engineers and other construction equipment operators (47-2073) | 10% | $23.23 | $24.39 | $28.60 | $28.78 | 0.85 | metro |
| Carpenters (47-2031) | 10% | $21.25 | $23.59 | $29.40 | $29.12 | 0.81 | metro |
| Blended | 100% | 0.89 | |||||
Optional extras in Hilton Head
Add-ons start from national price ranges and are scaled by 0.93 for Hilton Head, which is the average of the area's wage index (0.89) and goods price index (0.96). The estimator above can add them to your total.
| Add-on | Local range |
|---|---|
| Add rebar reinforcement | $370 – $1,100 |
| Remove old concrete first | $740 – $2,200 |
Cost by quality level and size in Hilton Head
The cited range is split into basic, standard and premium bands, then scaled to Hilton Head. Bands overlap, because plenty of standard jobs cost as much as a light premium one. Sizes run from 10x10 pad (100 sq ft) to 30x40 foundation (1,200 sq ft).
Basic
$2,250 to $3,300
4-inch broom-finish slab, light mesh, easy truck access
Standard
$3,050 to $4,100
4-5 inch slab with rebar or heavier mesh and standard base prep
Premium
$3,850 to $4,850
6-inch slab, heavy reinforcement, thick base, pump truck or tight access
| Size | Basic | Standard | Premium |
|---|---|---|---|
| 10x10 pad (100 sq ft) | $610 – $970 | $880 – $1,250 | $1,150 – $1,500 |
| 12x12 (144 sq ft) | $850 – $1,300 | $1,200 – $1,650 | $1,550 – $2,000 |
| 20x20 (400 sq ft) | $2,250 – $3,300 | $3,050 – $4,100 | $3,850 – $4,850 |
| 24x24 garage floor (576 sq ft) | $3,250 – $4,700 | $4,350 – $5,750 | $5,400 – $6,850 |
| 30x40 foundation (1,200 sq ft) | $6,700 – $9,550 | $8,850 – $11,700 | $11,000 – $13,800 |
Is Hilton Head cheap or dear? The local comparison
Same job, same size (400 sq ft), priced for the nearest metros. Charleston is the priciest of the group at $3,600. Savannah is the cheapest at $3,400.
| Area | Range | Midpoint | vs. here |
|---|---|---|---|
| Hilton Head, SCthis page | $2,250 – $4,850 | $3,550 | |
| Savannah, GA30 miles | $2,150 – $4,650 | $3,400 | −4% |
| Charleston, SC65 miles | $2,300 – $4,900 | $3,600 | +1% |
| Augusta, GA100 miles | $2,200 – $4,750 | $3,450 | −3% |
| Columbia, SC115 miles | $2,250 – $4,800 | $3,550 | −1% |
| Florence, SC135 miles | $2,250 – $4,750 | $3,500 | −2% |
| South Carolina (statewide) | $2,250 – $4,800 | $3,550 | −1% |
| United States | $2,450 – $5,200 | $3,850 | +7% |
Out of the 300 metros we cover, Hilton Head ranks #187 for the cost of this job (#1 is the most expensive). Statewide, Hilton Head is 1% above the South Carolina figure.
Elsewhere in South Carolina
| Metro | Size | Range | Midpoint | vs. here |
|---|---|---|---|---|
| Greenville, SC | 434,900 jobs | $2,250 – $4,850 | $3,550 | level |
| Columbia, SC | 394,200 jobs | $2,250 – $4,800 | $3,550 | −1% |
| Charleston, SC | 394,170 jobs | $2,300 – $4,900 | $3,600 | +1% |
| Spartanburg, SC | 165,150 jobs | $2,250 – $4,800 | $3,500 | −2% |
| Myrtle Beach, SC | 146,260 jobs | $2,150 – $4,700 | $3,400 | −4% |
| Florence, SC | 89,060 jobs | $2,250 – $4,750 | $3,500 | −2% |
Metros of a similar size
Big cities and small ones price differently, so here is Hilton Head against the 4 metros with the closest total employment.
| Metro | Size | Range | Midpoint | vs. here |
|---|---|---|---|---|
| Bowling Green, KY | 82,160 jobs | $2,250 – $4,850 | $3,550 | −1% |
| Idaho Falls, ID | 81,840 jobs | $2,350 – $4,950 | $3,650 | +2% |
| Houma, LA | 83,440 jobs | $2,150 – $4,600 | $3,400 | −5% |
| Johnson City, TN | 81,690 jobs | $2,200 – $4,750 | $3,450 | −3% |
Get 3 local quotes
Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $3,050 to $4,100 for Hilton Head, SC is attached.
A detailed PDF report of this estimate, $9
Multi-page report for Hilton Head, SC: low, typical and high cost, a line-item breakdown of materials and labor by trade, permit notes, the best months to schedule, a quote comparison sheet, red flags, questions for contractors, checklists and every source. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.
Concrete slab in Hilton Head: your questions
+How much does it cost to pour a concrete slab in Hilton Head?
For 400 sq ft, expect $2,250 to $4,850 in the Hilton Head area. A standard-spec job lands at $3,050 to $4,100. Small jobs usually cost more per sq ft and large ones less.
+What is the price per sq ft for concrete slab in Hilton Head?
About $5.55 to $11 per sq ft for materials and labor, plus $50 to $390 for the permit if one is needed. The US range is $6 to $12.
+Is concrete slab cheaper in Hilton Head or Savannah?
Savannah is 30 miles away. The midpoint for 400 sq ft there is $3,400, which is 4% less than Hilton Head ($3,550). Wage and materials indexes both feed that gap.
+How much of the bill is labor in Hilton Head?
About 40% at the midpoint, or $1,400 out of $3,550. Materials are 54% and permits 6%. Nationally, labor is 42%.
+What would 20x20 (400 sq ft) cost in Hilton Head?
$2,250 to $4,850. Pick a different size in the estimator above to get your own number.
+Does concrete slab need a permit in Hilton Head?
Often, but rules are set by your city or county building office, so call before you hire. Budget $50 to $390 for fees in the Hilton Head area (our national range of $50 to $400 scaled by the local price level).
+Is Hilton Head expensive for concrete slab compared with the rest of South Carolina?
Hilton Head is 1% above the South Carolina statewide estimate ($3,550 at the midpoint). We cover 7 metros in South Carolina; see the state page to compare them.
+What do cement masons and concrete finishers earn in Hilton Head?
The BLS median is $23.76 an hour in the Hilton Head area, compared with $27.41 nationally. The 25th to 75th percentile range is $22.77 to $28.96.
+What do basic and premium concrete slab work cost in Hilton Head?
For 400 sq ft, basic work runs $2,250 to $3,300 and premium work $3,850 to $4,850. Basic means: 4-inch broom-finish slab, light mesh, easy truck access. Premium means: 6-inch slab, heavy reinforcement, thick base, pump truck or tight access.
+When is the best time to pour a concrete slab in Hilton Head?
Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are February through June and September through December. May and November are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.
+What does "add rebar reinforcement" add in Hilton Head?
$370 to $1,100 for 400 sq ft, from a national range scaled by the local wage and goods indexes.
Concrete slab near Hilton Head
Where these numbers come from
Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.
- HomeGuide: How Much Does a Concrete Slab Cost? (2026) (accessed November 4, 2026)
- Estimators.us: Concrete Slab Cost in 2026 | $6-$12/Sq Ft Guide (accessed November 4, 2026)
- HomeGuide: How Much Does a Concrete Patio Cost? (2026) (accessed November 4, 2026)
- HomeGuide: How Much Does a Concrete Driveway Cost? (2026) (accessed November 4, 2026)
- BLS Occupational Employment and Wage Statistics, May 2025
- BEA Regional Price Parities, 2024
- NOAA NCEI U.S. Climate Normals, 1991-2020