Concrete driveway cost in Hilton Head, SC
Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.
- Typical range (600 sq ft)
- $3,350 – $8,400
- Per sq ft
- $5.50 – $13.50
- before permit
- Versus US midpoint
- −9%
- US $6,450
- Rank of 300 metros
- #188
- 1 = most expensive
Hilton Head homeowners pay roughly $3,350 to $8,400 to pour a concrete driveway at 600 sq ft, or $5.50 to $13.50 per sq ft (permit not included). Against the US midpoint, Hilton Head is 9% lower. Cement masons and concrete finishers earn a median of $23.76 an hour in the Hilton Head area, 13% below the US median of $27.41.
Estimate your concrete driveway cost
Pick a size, a quality level and where you live. Prices update as you type.
Estimated cost for 600 sq ft in Hilton Head, SC, standard level
$4,850 to $6,900
About $7.95 to $11 per sq ft before permits. Labor is about 67% of the bill.
| Part | Low | High |
|---|---|---|
| Materials | $1,600 | $2,000 |
| Labor | $3,150 | $4,700 |
| Permits and fees | $95 | $150 |
| Total | $4,850 | $6,900 |
Cost breakdown for 600 sq ft in Hilton Head, SC
| Part of the job | Low | Midpoint | High | Share |
|---|---|---|---|---|
| Materials | $1,350 | $1,800 | $2,300 | 31% |
| Labor | $2,000 | $3,950 | $5,900 | 67% |
| Permits and fees | $50 | $120 | $200 | 2% |
| Total | $3,350 | $5,850 | $8,400 | 100% |
Why Hilton Head prices look the way they do
We price the labor side from BLS wage data for 4 trades: cement masons and concrete finishers at 50%, construction laborers at 30%, operating engineers and other construction equipment operators at 10%, carpenters at 10%. Weighted together, Hilton Head wages are 0.89 times the national level. Labor makes up about 67% of the midpoint estimate (69% at national prices).
On the materials line, the BEA goods price index for the Hilton Head metro is 96.3 (US = 100). The midpoint materials bill for 600 sq ft comes to $1,800, compared with $1,900 at national prices. Permit and inspection fees are scaled by the broader index (98.0) and land at $50 to $200.
Is Hilton Head cheap or dear? The local comparison
Contractors rarely work more than an hour or two from home, so the neighboring metros set a rough ceiling and floor for your quotes. Midpoints for 600 sq ft range from $5,450 to $5,950 across Hilton Head and its five closest metros.
| Area | Range | Midpoint | vs. here |
|---|---|---|---|
| Hilton Head, SCthis page | $3,350 – $8,400 | $5,850 | |
| Savannah, GA30 miles | $3,150 – $7,750 | $5,450 | −7% |
| Charleston, SC65 miles | $3,400 – $8,500 | $5,950 | +1% |
| Augusta, GA100 miles | $3,200 – $8,000 | $5,600 | −5% |
| Columbia, SC115 miles | $3,300 – $8,300 | $5,800 | −1% |
| Florence, SC135 miles | $3,300 – $8,150 | $5,700 | −3% |
| South Carolina (statewide) | $3,300 – $8,250 | $5,800 | −1% |
| United States | $3,650 – $9,200 | $6,450 | +9% |
Across 300 US metros, Hilton Head comes in at #188 from the top. The priciest is Kahului, HI at $10,000; the cheapest is McAllen, TX at $4,950 (midpoints, 600 sq ft). Statewide, Hilton Head is 2% above the South Carolina figure.
Other South Carolina metros
| Metro | Size | Range | Midpoint | vs. here |
|---|---|---|---|---|
| Greenville, SC | 434,900 jobs | $3,350 – $8,350 | $5,850 | level |
| Columbia, SC | 394,200 jobs | $3,300 – $8,300 | $5,800 | −1% |
| Charleston, SC | 394,170 jobs | $3,400 – $8,500 | $5,950 | +1% |
| Spartanburg, SC | 165,150 jobs | $3,300 – $8,150 | $5,700 | −3% |
| Myrtle Beach, SC | 146,260 jobs | $3,150 – $7,800 | $5,500 | −7% |
| Florence, SC | 89,060 jobs | $3,300 – $8,150 | $5,700 | −3% |
Cities with a workforce like Hilton Head's
Big cities and small ones price differently, so here is Hilton Head against the 4 metros with the closest total employment.
| Metro | Size | Range | Midpoint | vs. here |
|---|---|---|---|---|
| Bowling Green, KY | 82,160 jobs | $3,350 – $8,350 | $5,850 | level |
| Idaho Falls, ID | 81,840 jobs | $3,450 – $8,750 | $6,100 | +4% |
| Houma, LA | 83,440 jobs | $3,150 – $7,900 | $5,550 | −6% |
| Johnson City, TN | 81,690 jobs | $3,250 – $8,050 | $5,650 | −4% |
What nearby projects cost in Hilton Head
Because every project leans on different trades, Hilton Head's wage level does not move all prices equally. Against the US midpoint, asphalt driveway runs −6% and concrete patio −7%.
| Project | Size | Range | vs. US |
|---|---|---|---|
| Asphalt driveway | 600 sq ft | $2,850 – $6,900 | −6% |
| Gravel driveway | 1,000 sq ft | $2,350 – $9,550 | −6% |
| Concrete slab | 400 sq ft | $2,250 – $4,850 | −7% |
| Stamped concrete | 400 sq ft | $3,050 – $7,400 | −7% |
| Paver patio | 300 sq ft | $2,800 – $5,100 | −7% |
| Concrete patio | 300 sq ft | $1,150 – $3,700 | −7% |
Pick a size, pick a tier: concrete driveway pricing in Hilton Head
Three bands are cut from the same cited range and localized for Hilton Head wages and prices. They overlap on purpose: a good standard job and a modest premium job can cost the same. The grid below prices the same bands at 4 common sizes.
Basic
$3,350 to $5,350
Plain gray, 4-inch broom finish, flat site
Standard
$4,850 to $6,900
5-inch with rebar and saw-cut joints, a border or one color
Premium
$6,350 to $8,400
6-inch for heavy vehicles, stamped or colored, grading needed
| Size | Basic | Standard | Premium |
|---|---|---|---|
| 1-car (12x20), 240 sq ft | $1,350 – $2,200 | $2,000 – $2,850 | $2,650 – $3,450 |
| 2-car (20x24), 480 sq ft | $2,700 – $4,300 | $3,900 – $5,550 | $5,150 – $6,750 |
| 2-car + apron (600 sq ft) | $3,350 – $5,350 | $4,850 – $6,900 | $6,350 – $8,400 |
| 3-car (900 sq ft) | $5,000 – $8,000 | $7,250 – $10,200 | $9,500 – $12,500 |
Why two Hilton Head quotes can differ
Thickness
HomeGuide prices a standard 4-inch driveway at $6-$15/sq ft and a 6-inch one, recommended for heavy vehicles, at $8-$20/sq ft.
Old driveway removal
Tearing out the old surface adds about $2-$6 per sq ft, and some cities want the haul-off documented.
Grading and drainage
Professional grading runs $3-$8 per sq ft or $700-$2,500 for a typical job. A sloped lot or poor soil raises it.
Local wages behind the labor line
Wages are the part of this estimate that changes most from town to town. 4 trades carry the job here, and each is compared with its US median. The weighted result for Hilton Head is 0.89 times the national level.
For cement masons and concrete finishers (47-2051, weighted 50%) the local median is $23.76 an hour, which is 13% below the national $27.41. The middle half of them earn between $22.77 and $28.96 an hour. BLS counts 90 of them working in the area, 11.0 for every 10,000 jobs (US: 13.3), so the local bench is thinner than average.
Construction laborers (47-2061), 30% of the weighting: a median of $21.99 an hour, in line with the US median of $22.66. The middle half of them earn between $18.13 and $25.12 an hour. About 910 work in the metro. That is 111.1 per 10,000 jobs, compared with 70.5 nationally, which suggests plenty of local crews to bid.
For operating engineers and other construction equipment operators (47-2073, weighted 10%) the local median is $24.39 an hour, which is 15% below the national $28.78. The middle half of them earn between $23.23 and $28.60 an hour. BLS counts 320 of them working in the area, 39.1 for every 10,000 jobs (US: 30.7), so the local bench is deeper than average.
For carpenters (47-2031, weighted 10%) the local median is $23.59 an hour, which is 19% below the national $29.12. The middle half of them earn between $21.25 and $29.40 an hour. BLS counts 440 of them working in the area, 53.7 for every 10,000 jobs (US: 43.1), so the local bench is deeper than average.
Quotes come from real crews, not medians. If the cement masons and concrete finishers on your job are paid at the 75th percentile ($28.96 an hour) instead of the median, the labor line grows by about $420. At the 25th percentile ($22.77) it shrinks by about $80. The total moves by 7.1% or 1.4%, so wages alone rarely explain a quote that is far outside our range.
For context on the local economy, BLS counts 81,920 jobs in the Hilton Head Island-Bluffton-Port Royal area. That makes it the 232nd largest of the 300 metros we cover, with 0.05% of US employment.
| Trade | Weight | 25th pct | Median | 75th pct | US median | Ratio | Level used |
|---|---|---|---|---|---|---|---|
| Cement masons and concrete finishers (47-2051) | 50% | $22.77 | $23.76 | $28.96 | $27.41 | 0.87 | metro |
| Construction laborers (47-2061) | 30% | $18.13 | $21.99 | $25.12 | $22.66 | 0.97 | metro |
| Operating engineers and other construction equipment operators (47-2073) | 10% | $23.23 | $24.39 | $28.60 | $28.78 | 0.85 | metro |
| Carpenters (47-2031) | 10% | $21.25 | $23.59 | $29.40 | $29.12 | 0.81 | metro |
| Blended | 100% | 0.89 | |||||
Add-ons priced for Hilton Head
Extras are quoted nationally and then scaled to Hilton Head by the average of the local wage index (0.89) and goods index (0.96), a factor of 0.93. Tick any of them in the estimator above to add them to your total. Treat these as planning figures: an add-on touches different trades than the main job, so the scaling is an approximation.
| Add-on | Local range |
|---|---|
| Add rebar reinforcement | $560 – $1,650 |
| Remove the old driveway | $1,100 – $3,350 |
When to schedule concrete driveway in Hilton Head
We use NOAA's 1991-2020 climate normals for Beaufort Mcas (10 miles from the city center). These are 30-year monthly averages, not forecasts.
February through June and September through December are the stretches where pouring concrete runs into the fewest weather problems in Hilton Head (9 of 12 months). January has an average overnight low of 40°F or below; July and August have an average daytime high of 90°F or more.
The 40°F line is a deliberately cautious stand-in. The American Concrete Institute's cold-weather guide (ACI 306R-16) defines cold-weather concreting around an average daily air temperature below 40°F, which is colder than our test of an average overnight low at or below 40°F, so we flag a few extra shoulder months. In cold weather crews may need heated enclosures, insulating blankets or accelerated mixes, and those measures can raise a quote.
Heat matters for concrete as well. With average highs of 90°F or more in July and August, crews often start early, wet the base and plan for faster set times.
Hilton Head gets about 45 inches of precipitation in a normal year. The wettest months are June, July and August (6.5 inches in August). Inside the workable window, May and November are the driest, at 2.5 and 2.5 inches. The station averages about 73 days a year at 90°F or above.
Does the season change the price? Probably, but we do not have a sourced seasonal price curve, so the estimator shows a year-round figure and does not adjust by month. When you collect quotes, ask whether scheduling in a slower month gets a better rate.
| Month | Avg high °F | Avg low °F | Precip (in) | For this job |
|---|---|---|---|---|
| Jan | 60 | 40 | 2.9 | Cold |
| Feb | 64 | 43 | 2.9 | Workable |
| Mar | 70 | 49 | 3.1 | Workable |
| Apr | 77 | 56 | 3.1 | Workable |
| May | 84 | 64 | 2.5 | Workable |
| Jun | 89 | 71 | 5.0 | Workable |
| Jul | 92 | 75 | 5.6 | Hot |
| Aug | 90 | 74 | 6.5 | Hot |
| Sep | 86 | 70 | 4.0 | Workable |
| Oct | 78 | 59 | 3.8 | Workable |
| Nov | 69 | 48 | 2.5 | Workable |
| Dec | 63 | 43 | 3.2 | Workable |
Get 3 local quotes
Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $4,850 to $6,900 for Hilton Head, SC is attached.
Take this estimate with you: PDF report, $9
The report lays out the concrete driveway numbers for Hilton Head, SC line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.
Concrete driveway in Hilton Head: your questions
+How much does it cost to pour a concrete driveway in Hilton Head?
For 600 sq ft, expect $3,350 to $8,400 in the Hilton Head area. A standard-spec job lands at $4,850 to $6,900. Small jobs usually cost more per sq ft and large ones less.
+What is the price per sq ft for concrete driveway in Hilton Head?
About $5.50 to $13.50 per sq ft for materials and labor, plus $50 to $200 for the permit if one is needed. The US range is $6 to $15.
+Is concrete driveway cheaper in Hilton Head or Savannah?
Savannah is 30 miles away. The midpoint for 600 sq ft there is $5,450, which is 7% less than Hilton Head ($5,850). Wage and materials indexes both feed that gap.
+How much of the bill is labor in Hilton Head?
About 67% at the midpoint, or $3,950 out of $5,850. Materials are 31% and permits 2%. Nationally, labor is 69%.
+What would 2-car + apron (600 sq ft) cost in Hilton Head?
$3,350 to $8,400. Pick a different size in the estimator above to get your own number.
+Does concrete driveway need a permit in Hilton Head?
Often, but rules are set by your city or county building office, so call before you hire. Budget $50 to $200 for fees in the Hilton Head area (our national range of $50 to $200 scaled by the local price level).
+Is Hilton Head expensive for concrete driveway compared with the rest of South Carolina?
Hilton Head is 2% above the South Carolina statewide estimate ($5,800 at the midpoint). We cover 7 metros in South Carolina; see the state page to compare them.
+What do cement masons and concrete finishers earn in Hilton Head?
The BLS median is $23.76 an hour in the Hilton Head area, compared with $27.41 nationally. The 25th to 75th percentile range is $22.77 to $28.96.
+What do basic and premium concrete driveway work cost in Hilton Head?
For 600 sq ft, basic work runs $3,350 to $5,350 and premium work $6,350 to $8,400. Basic means: plain gray, 4-inch broom finish, flat site. Premium means: 6-inch for heavy vehicles, stamped or colored, grading needed.
+When is the best time to pour a concrete driveway in Hilton Head?
Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are February through June and September through December. May and November are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.
+What does "add rebar reinforcement" add in Hilton Head?
$560 to $1,650 for 600 sq ft, from a national range scaled by the local wage and goods indexes.
Concrete driveway near Hilton Head
Where these numbers come from
Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.
- HomeGuide: How Much Does a Concrete Driveway Cost? (2026) (accessed November 4, 2026)
- SimplyWise: Concrete Estimate Template: Free PDF + Excel (2026) (accessed November 4, 2026)
- HomeGuide: 2026 Building Permit Costs | Fees & Cost Calculator (accessed November 4, 2026)
- BLS Occupational Employment and Wage Statistics, May 2025
- BEA Regional Price Parities, 2024
- NOAA NCEI U.S. Climate Normals, 1991-2020
Note on derived figures: Materials = SimplyWise's sample 600 sq ft, 4-inch driveway line ($1,400-$2,400 in materials) divided by 600 sq ft.