Concrete slab cost in Jackson, MS

Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.

Typical range (400 sq ft)
$2,150 – $4,650
Per sq ft
$5.30 – $10.50
before permit
Versus US midpoint
−11%
US $3,850
Rank of 300 metros
#264
1 = most expensive

Local price for a concrete slab in the Jackson area: $2,150 to $4,650 for 400 sq ft. The low end is a basic job on easy ground; the high end is a premium spec with harder access. The midpoint runs 11% lower than the US figure. Cement masons and concrete finishers earn a median of $21.79 an hour in the Jackson area, 21% below the US median of $27.41.

Estimate your concrete slab cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

4-5 inch slab with rebar or heavier mesh and standard base prep

Add-ons

Estimated cost for 400 sq ft in Jackson, MS, standard level

$2,900 to $3,900

About $6.90 to $9.10 per sq ft before permits. Labor is about 38% of the bill.

Cost breakdown
PartLowHigh
Materials$1,600$2,250
Labor$1,150$1,400
Permits and fees$140$260
Total$2,900$3,900
Save and get a PDF report

Cost breakdown for 400 sq ft in Jackson, MS

Part of the jobLowMidpointHighShare
Materials$1,150$1,900$2,70057%
Labor$960$1,300$1,60038%
Permits and fees$45$200$3606%
Total$2,150$3,400$4,650100%

What is behind the Jackson number

The wage side of the estimate leans on cement masons and concrete finishers, who do 50% of the hours on a typical job. Their local median is $21.79 an hour. Add the other trades involved and the blended wage index for Jackson is 0.80 (US = 1.00), which puts labor at 38% of the total.

Materials are scaled with BEA's regional price parity for goods. Jackson is at 96.2 against 100 for the US, so a materials line of $2,000 nationally becomes $1,900 here (midpoint, 400 sq ft). Permits follow the all-items index of 89.0: $45 to $360.

The best months for concrete slab in Jackson

Climate numbers on this page come from NOAA's 1991-2020 U.S. Climate Normals at the nearest suitable station, Jackson Hawkins Fld (5 miles from the city center). They are 30-year averages, so any one year can run hotter, colder or wetter.

For pouring concrete, the comfortable months in Jackson are February through May and September through November: 7 of 12. Outside them, January and December have an average overnight low of 40°F or below, and June, July and August have an average daytime high of 90°F or more.

The 40°F line is a deliberately cautious stand-in. The American Concrete Institute's cold-weather guide (ACI 306R-16) defines cold-weather concreting around an average daily air temperature below 40°F, which is colder than our test of an average overnight low at or below 40°F, so we flag a few extra shoulder months. In cold weather crews may need heated enclosures, insulating blankets or accelerated mixes, and those measures can raise a quote.

Heat matters for concrete as well. With average highs of 90°F or more in June, July and August, crews often start early, wet the base and plan for faster set times.

Jackson gets about 51 inches of precipitation in a normal year. The wettest months are January, March and April (5.3 inches in April). Inside the workable window, September and October are the driest, at 3.3 and 3.6 inches. The station averages about 83 days a year at 90°F or above.

We do not adjust the estimate by month, because we have no reliable published data on seasonal pricing. It is still worth asking contractors whether an off-peak start date changes their bid.

Monthly normals, Jackson Hawkins Fld (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan57385.1Cold
Feb62414.4Workable
Mar70484.8Workable
Apr77555.3Workable
May84633.9Workable
Jun90713.9Hot
Jul92734.7Hot
Aug92733.4Hot
Sep88683.3Workable
Oct79563.6Workable
Nov67454.2Workable
Dec60404.7Cold

Who does the work: Jackson trade wages

The labor line is built from BLS wage data, one trade at a time. This job draws on 4 trades. We compare each trade's local median with the US median, weight the ratios by how much of the job each trade does, and apply the blend to the national labor cost. For Jackson the blend is 0.80.

Cement masons and concrete finishers (47-2051), 50% of the weighting: a median of $21.79 an hour, 21% below the US median of $27.41. The middle half of them earn between $18.03 and $23.72 an hour. About 190 work in the metro. That is 7.0 per 10,000 jobs, compared with 13.3 nationally, so expect fewer local crews to bid.

For construction laborers (47-2061, weighted 30%) the local median is $18.20 an hour, which is 20% below the national $22.66. The middle half of them earn between $16.61 and $22.26 an hour. BLS counts 2,020 of them working in the area, 74.6 for every 10,000 jobs (US: 70.5), so the local bench is about average.

Operating engineers and other construction equipment operators (47-2073), 10% of the weighting: a median of $22.76 an hour, 21% below the US median of $28.78. The middle half of them earn between $19.00 and $26.92 an hour. About 870 work in the metro. That is 32.1 per 10,000 jobs, compared with 30.7 nationally, so the supply of crews looks typical.

Carpenters (47-2031), 10% of the weighting: a median of $23.72 an hour, 19% below the US median of $29.12. The middle half of them earn between $20.46 and $25.17 an hour. About 660 work in the metro. That is 24.4 per 10,000 jobs, compared with 43.1 nationally, so expect fewer local crews to bid.

A quick sensitivity check: moving the lead trade (cement masons and concrete finishers) from the median to the 75th percentile wage adds about $55 to the midpoint estimate; the 25th percentile takes off about $110. That is a swing of roughly 3.2% to 1.7% of the total, which is useful for judging whether a bid reflects wages or something else, such as scope or margin.

Jackson has 270,730 jobs in total (BLS, May 2025), ranking 96th by size among the 300 metros on this site.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Cement masons and concrete finishers (47-2051)50%$18.03$21.79$23.72$27.410.79metro
Construction laborers (47-2061)30%$16.61$18.20$22.26$22.660.80metro
Operating engineers and other construction equipment operators (47-2073)10%$19.00$22.76$26.92$28.780.79metro
Carpenters (47-2031)10%$20.46$23.72$25.17$29.120.81metro
Blended100%0.80

What nearby projects cost in Jackson

Jobs that often go together with concrete slab are priced below at their usual sizes, using the same Jackson wage and price inputs. Compared with national midpoints, asphalt driveway comes out highest (−9%) and concrete driveway lowest (−15%); the gap comes from the trades each job uses.

Related projects with local prices
ProjectSizeRangevs. US
Concrete driveway600 sq ft$3,150 – $7,750−15%
Concrete patio300 sq ft$1,150 – $3,450−13%
Detached garage576 sq ft$25,700 – $51,500−11%
Stamped concrete400 sq ft$2,900 – $6,950−12%
Asphalt driveway600 sq ft$2,800 – $6,650−9%
Gravel driveway1,000 sq ft$2,200 – $8,950−12%

Extras that change the Jackson total

Add-ons start from national price ranges and are scaled by 0.88 for Jackson, which is the average of the area's wage index (0.80) and goods price index (0.96). The estimator above can add them to your total.

Add-on prices
Add-onLocal range
Add rebar reinforcement$350 – $1,050
Remove old concrete first$700 – $2,100

Why two Jackson quotes can differ

  • Truck and pump access

    If the mixer truck can't back up to the forms, someone has to wheelbarrow it in or hire a pump. Pump or line-pump hire is typically billed per day.

  • Small-job minimums

    Many crews have a minimum charge, so a 10x10 pad can cost more per square foot than a 20x20 slab.

  • Finish

    A broom finish is the baseline. Stamped, stained, or exposed-aggregate finishes are priced as add-ons on top of the slab.

Jackson: what basic, standard and premium work costs

The cited range is split into basic, standard and premium bands, then scaled to Jackson. Bands overlap, because plenty of standard jobs cost as much as a light premium one. Sizes run from 10x10 pad (100 sq ft) to 30x40 foundation (1,200 sq ft).

Basic

$2,150 to $3,150

4-inch broom-finish slab, light mesh, easy truck access

Standard

$2,900 to $3,900

4-5 inch slab with rebar or heavier mesh and standard base prep

Premium

$3,650 to $4,650

6-inch slab, heavy reinforcement, thick base, pump truck or tight access

Cost by size and quality level
SizeBasicStandardPremium
10x10 pad (100 sq ft)$570 – $920$830 – $1,150$1,100 – $1,450
12x12 (144 sq ft)$810 – $1,250$1,150 – $1,550$1,450 – $1,900
20x20 (400 sq ft)$2,150 – $3,150$2,900 – $3,900$3,650 – $4,650
24x24 garage floor (576 sq ft)$3,100 – $4,450$4,100 – $5,500$5,150 – $6,550
30x40 foundation (1,200 sq ft)$6,400 – $9,100$8,450 – $11,200$10,500 – $13,200

Is Jackson cheap or dear? The local comparison

Same job, same size (400 sq ft), priced for the nearest metros. Baton Rouge is the priciest of the group at $3,650. Monroe is the cheapest at $3,300.

Comparison with nearby areas
AreaRangeMidpointvs. here
Jackson, MSthis page$2,150 – $4,650$3,400
Hattiesburg, MS100 miles$2,100 – $4,600$3,350−1%
Monroe, LA115 miles$2,100 – $4,500$3,300−4%
Slidell, LA140 miles$2,200 – $4,650$3,450+1%
Tuscaloosa, AL145 miles$2,150 – $4,600$3,350−1%
Baton Rouge, LA145 miles$2,350 – $4,950$3,650+7%
Mississippi (statewide)$2,150 – $4,600$3,400−1%
United States$2,450 – $5,200$3,850+12%

Out of the 300 metros we cover, Jackson ranks #264 for the cost of this job (#1 is the most expensive). Statewide, Jackson is 1% above the Mississippi figure.

Elsewhere in Mississippi

Mississippi metros compared with Jackson
MetroSizeRangeMidpointvs. here
Gulfport, MS158,310 jobs$2,100 – $4,550$3,300−3%
Hattiesburg, MS62,230 jobs$2,100 – $4,600$3,350−1%

Metros of a similar size

Big cities and small ones price differently, so here is Jackson against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
Ogden, UT271,370 jobs$2,350 – $4,950$3,650+7%
Poughkeepsie, NY268,970 jobs$2,700 – $5,750$4,250+24%
Winston, NC271,980 jobs$2,200 – $4,700$3,450+2%
Chattanooga, TN268,750 jobs$2,200 – $4,750$3,450+2%

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $2,900 to $3,900 for Jackson, MS is attached.

Detailed concrete slab report for Jackson, MS, $9

The report lays out the concrete slab numbers for Jackson, MS line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Concrete slab in Jackson: your questions

+How much does it cost to pour a concrete slab in Jackson?

For 400 sq ft, expect $2,150 to $4,650 in the Jackson area. A standard-spec job lands at $2,900 to $3,900. Small jobs usually cost more per sq ft and large ones less.

+What is the price per sq ft for concrete slab in Jackson?

About $5.30 to $10.50 per sq ft for materials and labor, plus $45 to $360 for the permit if one is needed. The US range is $6 to $12.

+Is concrete slab cheaper in Jackson or Hattiesburg?

Hattiesburg is 100 miles away. The midpoint for 400 sq ft there is $3,350, which is 1% less than Jackson ($3,400). Wage and materials indexes both feed that gap.

+How much of the bill is labor in Jackson?

About 38% at the midpoint, or $1,300 out of $3,400. Materials are 57% and permits 6%. Nationally, labor is 42%.

+What would 20x20 (400 sq ft) cost in Jackson?

$2,150 to $4,650. Pick a different size in the estimator above to get your own number.

+Does concrete slab need a permit in Jackson?

Often, but rules are set by your city or county building office, so call before you hire. Budget $45 to $360 for fees in the Jackson area (our national range of $50 to $400 scaled by the local price level).

+Is Jackson expensive for concrete slab compared with the rest of Mississippi?

Jackson is 1% above the Mississippi statewide estimate ($3,400 at the midpoint). We cover 3 metros in Mississippi; see the state page to compare them.

+What do cement masons and concrete finishers earn in Jackson?

The BLS median is $21.79 an hour in the Jackson area, compared with $27.41 nationally. The 25th to 75th percentile range is $18.03 to $23.72.

+What do basic and premium concrete slab work cost in Jackson?

For 400 sq ft, basic work runs $2,150 to $3,150 and premium work $3,650 to $4,650. Basic means: 4-inch broom-finish slab, light mesh, easy truck access. Premium means: 6-inch slab, heavy reinforcement, thick base, pump truck or tight access.

+When is the best time to pour a concrete slab in Jackson?

Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are February through May and September through November. September and October are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.

+What does "add rebar reinforcement" add in Jackson?

$350 to $1,050 for 400 sq ft, from a national range scaled by the local wage and goods indexes.

Concrete slab near Jackson

Concrete slab: all pricesConcrete slab in MississippiAll projects in JacksonMississippi cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.