Concrete slab cost in Mississippi

Statewide estimate from BLS wages and BEA prices. Reviewed Nov 4, 2026.

Statewide range (400 sq ft)
$2,150 – $4,600
Per sq ft
$5.25 – $10.50
before permit
Versus US midpoint
−12%
US $3,850
Metros covered
3

What does it cost to pour a concrete slab in Mississippi? Plan on $2,150 to $4,600 for 400 sq ft. Wages (0.79x the US blend), materials (price index 96.2) and permit costs (87.0) put the state below the national midpoint by 12%.

Inside Mississippi, the metros we cover range from $3,300 (Gulfport) to $3,400 (Jackson) at the midpoint. Pick your closest city in the table for a tighter number.

Estimate your concrete slab cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

4-5 inch slab with rebar or heavier mesh and standard base prep

Add-ons

Estimated cost for 400 sq ft in Mississippi (statewide), standard level

$2,900 to $3,850

About $6.85 to $9.05 per sq ft before permits. Labor is about 37% of the bill.

Cost breakdown
PartLowHigh
Materials$1,600$2,250
Labor$1,150$1,400
Permits and fees$130$260
Total$2,900$3,850
Save and get a PDF report

Cost breakdown for 400 sq ft in Mississippi

Part of the jobLowMidpointHighShare
Materials$1,150$1,900$2,70057%
Labor$940$1,250$1,55037%
Permits and fees$45$200$3506%
Total$2,150$3,400$4,600100%

Extras that change the Mississippi total

Extras are quoted nationally and then scaled to Mississippi by the average of the local wage index (0.79) and goods index (0.96), a factor of 0.87. Tick any of them in the estimator above to add them to your total. Treat these as planning figures: an add-on touches different trades than the main job, so the scaling is an approximation.

Add-on prices
Add-onLocal range
Add rebar reinforcement$350 – $1,050
Remove old concrete first$700 – $2,100

Concrete slab: what moves the price in Mississippi

  • Thickness and mix

    A 4-inch slab uses about 1.23 cubic yards of concrete per 100 sq ft; a 6-inch slab uses about 1.85. Stepping up from a 3,000 PSI to a 4,000-4,500 PSI mix adds $10-$40 per cubic yard (Estimators.us).

  • Base and reinforcement

    A compacted gravel base, vapor barrier, and wire mesh or rebar are priced separately by some contractors and bundled by others. Ask which one your quote does.

  • Truck and pump access

    If the mixer truck can't back up to the forms, someone has to wheelbarrow it in or hire a pump. Pump or line-pump hire is typically billed per day.

  • Small-job minimums

    Many crews have a minimum charge, so a 10x10 pad can cost more per square foot than a 20x20 slab.

  • Finish

    A broom finish is the baseline. Stamped, stained, or exposed-aggregate finishes are priced as add-ons on top of the slab.

Mississippi metro-by-metro prices

1 of the 3 metros sit above the statewide midpoint of $3,400, and the top-to-bottom gap is 3%. Each row prices the default size with that metro's own BLS wages and BEA price levels, so the gap between rows is real local variation rather than a flat markup.

MetroRange (400 sq ft)Midpointvs. state
Jackson, MS$2,150 – $4,650$3,400+1%
Hattiesburg, MS$2,100 – $4,600$3,350−1%
Gulfport, MS$2,100 – $4,550$3,300−2%

Mississippi seasons and concrete slab

Season matters for concrete slab. For each Mississippi metro below we took NOAA's 1991-2020 monthly normals from the nearest suitable station and counted comfortable months for pouring concrete.

Gulfport has the longest comfortable season of the metros we cover in Mississippi at 10 months (September through June); Jackson has the shortest at 7 (February through May and September through November). Rainfall runs from 51 inches a year in Jackson to 63 inches in Gulfport.

We do not adjust prices by month, because we have no reliable published data on seasonal pricing. Timing is still worth raising when you collect bids.

Climate by metro (NOAA 1991-2020 normals)
MetroJan avg low °FJul avg high °FPrecip (in/yr)Comfortable months
Jackson3892517: February through May and September through November
Gulfport42906310: September through June
Hattiesburg3892598: February through May and September through December

Related projects, priced for Mississippi

The table prices neighboring jobs at their usual sizes using statewide Mississippi wages and prices. Against national midpoints, detached garage comes out highest (−11%) and concrete driveway lowest (−16%), because each job leans on different trades.

Related projects with local prices
ProjectSizeRangevs. US
Concrete driveway600 sq ft$3,100 – $7,650−16%
Concrete patio300 sq ft$1,100 – $3,400−14%
Detached garage576 sq ft$25,700 – $51,600−11%
Stamped concrete400 sq ft$2,850 – $6,900−13%
Asphalt driveway600 sq ft$2,700 – $6,450−12%
Gravel driveway1,000 sq ft$2,200 – $8,950−12%

How Mississippi compares with nearby states

Mississippi ranks 49 of 51 (the 50 states plus DC) for concrete slab, where 1 is the most expensive. The costliest is Hawaii at $5,150 and the cheapest Arkansas at $3,350, both for 400 sq ft at the midpoint. Mississippi sits at $3,400. The five states closest by workforce center are listed below.

States near Mississippi, same project and size
StateDistanceRangeMidpointvs. here
Louisiana130 miles away$2,200 – $4,650$3,400+1%
Alabama180 miles away$2,150 – $4,650$3,400level
Arkansas330 miles away$2,100 – $4,550$3,350−1%
Tennessee330 miles away$2,250 – $4,800$3,550+5%
Georgia350 miles away$2,200 – $4,800$3,500+4%

What cement masons and concrete finishers and the other trades earn in Mississippi

Statewide wages come from BLS's state-level estimates, which blend big cities with small towns and rural areas. 4 trades drive the labor line for this job, and the weighted ratio against the national wage level is 0.79 for Mississippi.

For cement masons and concrete finishers (47-2051, weighted 50%) the local median is $21.14 an hour, which is 23% below the national $27.41. The middle half of them earn between $17.50 and $22.89 an hour. BLS counts 930 of them working in the state, 8.0 for every 10,000 jobs (US: 13.3), so the local bench is thinner than average.

Construction laborers (47-2061), 30% of the weighting: a median of $18.13 an hour, 20% below the US median of $22.66. The middle half of them earn between $16.25 and $22.01 an hour. About 8,800 work in the state. That is 75.7 per 10,000 jobs, compared with 70.5 nationally, so the supply of crews looks typical.

For operating engineers and other construction equipment operators (47-2073, weighted 10%) the local median is $22.79 an hour, which is 21% below the national $28.78. The middle half of them earn between $19.00 and $27.50 an hour. BLS counts 4,170 of them working in the state, 35.9 for every 10,000 jobs (US: 30.7), so the local bench is deeper than average.

For carpenters (47-2031, weighted 10%) the local median is $23.39 an hour, which is 20% below the national $29.12. The middle half of them earn between $18.47 and $25.23 an hour. BLS counts 2,950 of them working in the state, 25.4 for every 10,000 jobs (US: 43.1), so the local bench is thinner than average.

A crew paid at the 75th percentile for cement masons and concrete finishers ($22.89 an hour) would add about $50 to the statewide midpoint; one at the 25th percentile ($17.50) would take off about $110. Use that as a rough guide to how far a bid can sit from our midpoint on wages alone.

BLS counts 1,163,030 jobs across Mississippi (May 2025), which is 0.7% of US employment.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Cement masons and concrete finishers (47-2051)50%$17.50$21.14$22.89$27.410.77state
Construction laborers (47-2061)30%$16.25$18.13$22.01$22.660.80state
Operating engineers and other construction equipment operators (47-2073)10%$19.00$22.79$27.50$28.780.79state
Carpenters (47-2031)10%$18.47$23.39$25.23$29.120.80state
Blended100%0.79

Quality levels and sizes in Mississippi

The cited range is cut into three overlapping bands (basic, standard and premium) and scaled to statewide Mississippi wages and prices. The grid prices the same bands at 5 common sizes.

Basic

$2,150 to $3,150

4-inch broom-finish slab, light mesh, easy truck access

Standard

$2,900 to $3,850

4-5 inch slab with rebar or heavier mesh and standard base prep

Premium

$3,600 to $4,600

6-inch slab, heavy reinforcement, thick base, pump truck or tight access

Cost by size and quality level
SizeBasicStandardPremium
10x10 pad (100 sq ft)$570 – $910$820 – $1,150$1,100 – $1,400
12x12 (144 sq ft)$800 – $1,250$1,100 – $1,550$1,450 – $1,900
20x20 (400 sq ft)$2,150 – $3,150$2,900 – $3,850$3,600 – $4,600
24x24 garage floor (576 sq ft)$3,050 – $4,450$4,100 – $5,450$5,100 – $6,500
30x40 foundation (1,200 sq ft)$6,350 – $9,050$8,400 – $11,100$10,400 – $13,100

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $2,900 to $3,850 for Mississippi is attached.

Detailed concrete slab report for Mississippi, $9

Multi-page report for Mississippi: low, typical and high cost, a line-item breakdown of materials and labor by trade, permit notes, the best months to schedule, a quote comparison sheet, red flags, questions for contractors, checklists and every source. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Concrete slab in Mississippi: your questions

+How much does it cost to pour a concrete slab in Mississippi?

$2,150 to $4,600 for 400 sq ft, using statewide wages and prices. Metro areas inside Mississippi can sit above or below that.

+Which city in Mississippi is cheapest for concrete slab?

Gulfport at about $3,300 (midpoint, 400 sq ft). The priciest is Jackson at $3,400.

+Is concrete slab cheaper in Mississippi than the US average?

It is 12% cheaper: $3,400 against $3,850 for 400 sq ft at the midpoint.

+What share of the price is labor in Mississippi?

About 37% ($1,250). Materials are 57%. Statewide labor for this job is weighted 0.79x the national wage level.

+Does a concrete slab need a permit?

Often yes if it's structural (a garage floor or foundation) and often no for a small at-grade pad. Permit fees run $50-$400 depending on the city (HomeGuide).

+What do cement masons and concrete finishers earn in Mississippi?

The BLS statewide median is $21.14 an hour, against $27.41 for the US. The 25th to 75th percentile range is $17.50 to $22.89.

+Where does Mississippi rank for concrete slab costs?

49th most expensive of 51 (the 50 states plus DC) at the midpoint, $3,400 for 400 sq ft. Rank 1 is the costliest.

+What do basic and premium concrete slab work cost in Mississippi?

For 400 sq ft, basic work runs $2,150 to $3,150 and premium work $3,600 to $4,600. Basic means: 4-inch broom-finish slab, light mesh, easy truck access. Premium means: 6-inch slab, heavy reinforcement, thick base, pump truck or tight access.

+Does the season matter for concrete slab in Mississippi?

Yes where winters or summers are hard. Of the Mississippi metros we cover, Gulfport has the most comfortable months (10 of 12) based on NOAA 1991-2020 normals. Our prices do not change by month, so ask contractors whether they charge more or less in busy and slow seasons.

+What does "add rebar reinforcement" add in Mississippi?

$350 to $1,050 for 400 sq ft, from a national range scaled by the statewide wage and goods indexes.

Concrete slab by city in Mississippi

Concrete slab: all pricesMississippi cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.