Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.

Typical range (300 sq ft)
$1,250 – $4,100
Per sq ft
$4 – $12.50
before permit
Versus US midpoint
+1%
US $2,650
Rank of 300 metros
#112
1 = most expensive

A concrete patio in South Bend, IN usually costs $1,250 to $4,100 for 300 sq ft. That works out to about $4 to $12.50 per sq ft before permits. That is within a few percent of the national midpoint, so there is little local premium or discount. Cement masons and concrete finishers earn a median of $28.61 an hour in the South Bend area, 4% above the US median of $27.41.

Estimate your concrete patio cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

Colored or stained, saw-cut joints, minor grading

Add-ons

Estimated cost for 300 sq ft in South Bend, IN, standard level

$2,100 to $3,250

About $6.50 to $9.85 per sq ft before permits. Labor is about 55% of the bill.

Cost breakdown
PartLowHigh
Materials$880$1,100
Labor$1,050$1,850
Permits and fees$140$270
Total$2,100$3,250
Save and get a PDF report

Cost breakdown for 300 sq ft in South Bend, IN

Part of the jobLowMidpointHighShare
Materials$710$990$1,25037%
Labor$490$1,450$2,45055%
Permits and fees$45$210$3708%
Total$1,250$2,650$4,100100%

Where the South Bend price comes from

We price the labor side from BLS wage data for 4 trades: cement masons and concrete finishers at 50%, construction laborers at 30%, carpenters at 10%, operating engineers and other construction equipment operators at 10%. Weighted together, South Bend wages are 1.08 times the national level. Labor makes up about 55% of the midpoint estimate (51% at national prices).

Materials are scaled with BEA's regional price parity for goods. South Bend is at 94.2 against 100 for the US, so a materials line of $1,050 nationally becomes $990 here (midpoint, 300 sq ft). Permits follow the all-items index of 92.9: $45 to $370.

Is South Bend cheap or dear? The local comparison

Of the five closest metros, all are cheaper than South Bend. Niles is the lowest at about $2,500 (midpoint, 300 sq ft), 30 miles away.

Comparison with nearby areas
AreaRangeMidpointvs. here
South Bend, INthis page$1,250 – $4,100$2,650
Elkhart, IN20 miles$1,250 – $4,050$2,650−1%
Niles, MI30 miles$1,200 – $3,850$2,500−6%
Kalamazoo, MI45 miles$1,200 – $3,900$2,550−5%
Fort Wayne, IN70 miles$1,250 – $4,050$2,650−1%
Grand Rapids, MI85 miles$1,200 – $3,950$2,600−3%
Indiana (statewide)$1,250 – $4,100$2,700+1%
United States$1,250 – $4,000$2,650−1%

Out of the 300 metros we cover, South Bend ranks #112 for the cost of this job (#1 is the most expensive). Statewide, South Bend is 1% below the Indiana figure.

Elsewhere in Indiana

Indiana metros compared with South Bend
MetroSizeRangeMidpointvs. here
Indianapolis, IN1,105,170 jobs$1,250 – $4,150$2,700+2%
Fort Wayne, IN225,520 jobs$1,250 – $4,050$2,650−1%
Evansville, IN135,250 jobs$1,250 – $4,200$2,750+3%
Elkhart, IN127,730 jobs$1,250 – $4,050$2,650−1%
Lafayette, IN102,200 jobs$1,250 – $4,050$2,650−1%
Bloomington, IN73,240 jobs$1,250 – $4,100$2,700+1%

Metros of a similar size

Big cities and small ones price differently, so here is South Bend against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
College Station, TX134,040 jobs$1,100 – $3,350$2,250−16%
Fayetteville, NC131,430 jobs$1,100 – $3,400$2,250−15%
Flint, MI135,040 jobs$1,250 – $4,150$2,700+2%
Olympia, WA130,300 jobs$1,400 – $4,700$3,050+15%

Add-ons priced for South Bend

Add-ons start from national price ranges and are scaled by 1.01 for South Bend, which is the average of the area's wage index (1.08) and goods price index (0.94). The estimator above can add them to your total.

Add-on prices
Add-onLocal range
Add an acid or water-based stain$910 – $3,050

What local crews earn in South Bend

The labor line is built from BLS wage data, one trade at a time. This job draws on 4 trades. We compare each trade's local median with the US median, weight the ratios by how much of the job each trade does, and apply the blend to the national labor cost. For South Bend the blend is 1.08.

Cement masons and concrete finishers (47-2051), 50% of the weighting: a median of $28.61 an hour, 4% above the US median of $27.41. The middle half of them earn between $23.26 and $31.63 an hour. About 130 work in the metro. That is 9.9 per 10,000 jobs, compared with 13.3 nationally, so expect fewer local crews to bid.

For construction laborers (47-2061, weighted 30%) the local median is $24.46 an hour, which is 8% above the national $22.66. The middle half of them earn between $21.07 and $30.16 an hour. BLS counts 800 of them working in the area, 60.8 for every 10,000 jobs (US: 70.5), so the local bench is about average.

Carpenters (47-2031), 10% of the weighting: a median of $29.66 an hour, in line with the US median of $29.12. The middle half of them earn between $23.63 and $33.69 an hour. About 500 work in the metro. That is 38.0 per 10,000 jobs, compared with 43.1 nationally, so the supply of crews looks typical.

Operating engineers and other construction equipment operators (47-2073), 10% of the weighting: a median of $38.68 an hour, 34% above the US median of $28.78. The middle half of them earn between $29.07 and $46.44 an hour. About 360 work in the metro. That is 27.3 per 10,000 jobs, compared with 30.7 nationally, so the supply of crews looks typical.

A quick sensitivity check: moving the lead trade (cement masons and concrete finishers) from the median to the 75th percentile wage adds about $75 to the midpoint estimate; the 25th percentile takes off about $130. That is a swing of roughly 5.0% to 2.8% of the total, which is useful for judging whether a bid reflects wages or something else, such as scope or margin.

South Bend-Mishawaka has 131,670 jobs in total (BLS, May 2025), ranking 165th by size among the 300 metros on this site.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Cement masons and concrete finishers (47-2051)50%$23.26$28.61$31.63$27.411.04metro
Construction laborers (47-2061)30%$21.07$24.46$30.16$22.661.08metro
Carpenters (47-2031)10%$23.63$29.66$33.69$29.121.02metro
Operating engineers and other construction equipment operators (47-2073)10%$29.07$38.68$46.44$28.781.34metro
Blended100%1.08

Cost by quality level and size in South Bend

The cited range is split into basic, standard and premium bands, then scaled to South Bend. Bands overlap, because plenty of standard jobs cost as much as a light premium one. Sizes run from 10x10 (100 sq ft) to 20x20 (400 sq ft).

Basic

$1,250 to $2,400

Plain gray slab, broom finish, flat yard

Standard

$2,100 to $3,250

Colored or stained, saw-cut joints, minor grading

Premium

$2,950 to $4,100

Exposed aggregate or heavy decorative finish, drainage work

Cost by size and quality level
SizeBasicStandardPremium
10x10 (100 sq ft)$440 – $910$790 – $1,250$1,150 – $1,600
12x16 (192 sq ft)$810 – $1,600$1,400 – $2,150$1,950 – $2,750
20x20 (400 sq ft)$1,650 – $3,100$2,750 – $4,200$3,850 – $5,300

Why two South Bend quotes can differ

  • Size

    Small patios carry fixed costs for forms and mobilization, so the per-square-foot price drops as the patio gets bigger.

  • Permit

    Permits run $50-$400 where required. Many cities don't require one for a small at-grade patio.

  • Finish

    Plain concrete is $4-$12 per sq ft and a broom finish $6-$13; designs with several colors and decorative finishes run up to about $28 (HomeGuide).

What nearby projects cost in South Bend

Jobs that often go together with concrete patio are priced below at their usual sizes, using the same South Bend wage and price inputs. Compared with national midpoints, concrete driveway comes out highest (+4%) and wood deck lowest (−2%); the gap comes from the trades each job uses.

Related projects with local prices
ProjectSizeRangevs. US
Concrete slab400 sq ft$2,500 – $5,150level
Stamped concrete400 sq ft$3,250 – $8,050+1%
Paver patio300 sq ft$3,100 – $5,600+3%
Wood deck300 sq ft$7,400 – $14,900−2%
Concrete driveway600 sq ft$3,750 – $9,600+4%
Asphalt driveway600 sq ft$3,100 – $7,650+3%

South Bend weather and the concrete patio calendar

Climate numbers on this page come from NOAA's 1991-2020 U.S. Climate Normals at the nearest suitable station, South Bend Michiana Rgnl Ap (5 miles from the city center). They are 30-year averages, so any one year can run hotter, colder or wetter.

For pouring concrete, the comfortable months in South Bend are May through October: 6 of 12. Outside them, January, February, March, April, November and December have an average overnight low of 40°F or below.

The 40°F line is a deliberately cautious stand-in. The American Concrete Institute's cold-weather guide (ACI 306R-16) defines cold-weather concreting around an average daily air temperature below 40°F, which is colder than our test of an average overnight low at or below 40°F, so we flag a few extra shoulder months. In cold weather crews may need heated enclosures, insulating blankets or accelerated mixes, and those measures can raise a quote.

South Bend gets about 39 inches of precipitation in a normal year, including roughly 65 inches of snow. The wettest months are May, June and August (4.2 inches in May). Inside the workable window, September and October are the driest, at 3.5 and 3.7 inches. The station averages about 14 days a year at 90°F or above.

We do not adjust the estimate by month, because we have no reliable published data on seasonal pricing. It is still worth asking contractors whether an off-peak start date changes their bid.

Monthly normals, South Bend Michiana Rgnl Ap (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan31172.7Cold
Feb35192.3Cold
Mar46272.4Cold
Apr59373.5Cold
May70484.2Workable
Jun79584.0Workable
Jul83623.8Workable
Aug81614.0Workable
Sep74533.5Workable
Oct62423.7Workable
Nov48322.8Cold
Dec36232.4Cold

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $2,100 to $3,250 for South Bend, IN is attached.

A detailed PDF report of this estimate, $9

The report lays out the concrete patio numbers for South Bend, IN line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Concrete patio in South Bend: your questions

+How much does it cost to pour a concrete patio in South Bend?

For 300 sq ft, expect $1,250 to $4,100 in the South Bend area. A standard-spec job lands at $2,100 to $3,250. Small jobs usually cost more per sq ft and large ones less.

+What is the price per sq ft for concrete patio in South Bend?

About $4 to $12.50 per sq ft for materials and labor, plus $45 to $370 for the permit if one is needed. The US range is $4 to $12.

+Is concrete patio cheaper in South Bend or Elkhart?

Elkhart is 20 miles away. The midpoint for 300 sq ft there is $2,650, which is 1% less than South Bend ($2,650). Wage and materials indexes both feed that gap.

+How much of the bill is labor in South Bend?

About 55% at the midpoint, or $1,450 out of $2,650. Materials are 37% and permits 8%. Nationally, labor is 51%.

+What would 12x16 (192 sq ft) cost in South Bend?

$810 to $2,750. Pick a different size in the estimator above to get your own number.

+Does concrete patio need a permit in South Bend?

Often, but rules are set by your city or county building office, so call before you hire. Budget $45 to $370 for fees in the South Bend area (our national range of $50 to $400 scaled by the local price level).

+Is South Bend expensive for concrete patio compared with the rest of Indiana?

South Bend is 1% below the Indiana statewide estimate ($2,700 at the midpoint). We cover 8 metros in Indiana; see the state page to compare them.

+What do cement masons and concrete finishers earn in South Bend?

The BLS median is $28.61 an hour in the South Bend area, compared with $27.41 nationally. The 25th to 75th percentile range is $23.26 to $31.63.

+What do basic and premium concrete patio work cost in South Bend?

For 300 sq ft, basic work runs $1,250 to $2,400 and premium work $2,950 to $4,100. Basic means: plain gray slab, broom finish, flat yard. Premium means: exposed aggregate or heavy decorative finish, drainage work.

+When is the best time to pour a concrete patio in South Bend?

Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are May through October. September and October are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.

+What does "add an acid or water-based stain" add in South Bend?

$910 to $3,050 for 300 sq ft, from a national range scaled by the local wage and goods indexes.

Concrete patio near South Bend

Concrete patio: all pricesConcrete patio in IndianaAll projects in South BendIndiana cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.

Note on derived figures: Materials = SimplyWise's sample 200 sq ft broom-finish patio line ($500-$900 in materials) divided by 200 sq ft.