Concrete patio cost in Florida

Statewide estimate from BLS wages and BEA prices. Reviewed Nov 4, 2026.

Statewide range (300 sq ft)
$1,200 – $3,700
Per sq ft
$3.75 – $11
before permit
Versus US midpoint
−7%
US $2,650
Metros covered
19

What does it cost to pour a concrete patio in Florida? Plan on $1,200 to $3,700 for 300 sq ft. Wages (0.87x the US blend), materials (price index 98.1) and permit costs (103.4) put the state below the national midpoint by 7%.

Inside Florida, the metros we cover range from $2,300 (Tallahassee) to $2,550 (Miami) at the midpoint. Pick your closest city in the table for a tighter number.

Estimate your concrete patio cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

Colored or stained, saw-cut joints, minor grading

Add-ons

Estimated cost for 300 sq ft in Florida (statewide), standard level

$1,950 to $2,950

About $5.90 to $8.80 per sq ft before permits. Labor is about 48% of the bill.

Cost breakdown
PartLowHigh
Materials$910$1,150
Labor$860$1,500
Permits and fees$160$310
Total$1,950$2,950
Save and get a PDF report

Cost breakdown for 300 sq ft in Florida

Part of the jobLowMidpointHighShare
Materials$740$1,050$1,30042%
Labor$390$1,200$1,95048%
Permits and fees$50$230$41010%
Total$1,200$2,450$3,700100%

When Florida weather lets you pour

Weather decides when pouring concrete can happen, and Florida is not uniform. The table uses NOAA's 1991-2020 climate normals from the weather station nearest each metro we cover, and counts the months that are neither cold nor hot enough to complicate the job.

Miami has the longest comfortable season of the metros we cover in Florida at 12 months; Punta Gorda has the shortest at 7 (October through April). Rainfall runs from 46 inches a year in Lakeland to 68 inches in Pensacola.

We do not adjust prices by month, because we have no reliable published data on seasonal pricing. Timing is still worth raising when you collect bids.

Climate by metro (NOAA 1991-2020 normals)
MetroJan avg low °FJul avg high °FPrecip (in/yr)Comfortable months
Miami61885712: all year
Tampa5391498: October through May
Orlando5092518: October through May
Jacksonville4792489: September through May
North Port5193537: October through April
Cape Coral5492577: October through April
Lakeland5293467: October through April
Palm Bay4991569: September through May
Deltona5093508: October through May
Pensacola4492689: September through May
Tallahassee4192599: September through May
Naples5691508: October through May
Port St. Lucie51905110: September through June
Gainesville4391489: September through May
Crestview3992648: February through May and September through December
Ocala4692528: October through May
Panama City43916110: September through June
Sebastian52915310: September through June
Punta Gorda5193537: October through April

What cement masons and concrete finishers and the other trades earn in Florida

Florida's labor line is priced from 4 trades, each compared with its US median wage. After weighting by each trade's share of the work, the state comes out at 0.87 times the national level.

Cement masons and concrete finishers (47-2051), 50% of the weighting: a median of $23.40 an hour, 15% below the US median of $27.41. The middle half of them earn between $21.95 and $27.53 an hour. About 15,240 work in the state. That is 15.3 per 10,000 jobs, compared with 13.3 nationally, which suggests plenty of local crews to bid.

For construction laborers (47-2061, weighted 30%) the local median is $21.17 an hour, which is 7% below the national $22.66. The middle half of them earn between $17.83 and $23.06 an hour. BLS counts 87,040 of them working in the state, 87.7 for every 10,000 jobs (US: 70.5), so the local bench is deeper than average.

Carpenters (47-2031), 10% of the weighting: a median of $23.98 an hour, 18% below the US median of $29.12. The middle half of them earn between $21.41 and $28.79 an hour. About 39,300 work in the state. That is 39.6 per 10,000 jobs, compared with 43.1 nationally, so the supply of crews looks typical.

Operating engineers and other construction equipment operators (47-2073), 10% of the weighting: a median of $23.75 an hour, 17% below the US median of $28.78. The middle half of them earn between $22.27 and $28.06 an hour. About 27,510 work in the state. That is 27.7 per 10,000 jobs, compared with 30.7 nationally, so the supply of crews looks typical.

A crew paid at the 75th percentile for cement masons and concrete finishers ($27.53 an hour) would add about $100 to the statewide midpoint; one at the 25th percentile ($21.95) would take off about $35. Use that as a rough guide to how far a bid can sit from our midpoint on wages alone.

BLS counts 9,929,860 jobs across Florida (May 2025), which is 6.4% of US employment.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Cement masons and concrete finishers (47-2051)50%$21.95$23.40$27.53$27.410.85state
Construction laborers (47-2061)30%$17.83$21.17$23.06$22.660.93state
Carpenters (47-2031)10%$21.41$23.98$28.79$29.120.82state
Operating engineers and other construction equipment operators (47-2073)10%$22.27$23.75$28.06$28.780.83state
Blended100%0.87

Concrete patio cost by metro in Florida

2 of the 19 metros sit above the statewide midpoint of $2,450, and the top-to-bottom gap is 11%. Each row prices the default size with that metro's own BLS wages and BEA price levels, so the gap between rows is real local variation rather than a flat markup.

MetroRange (300 sq ft)Midpointvs. state
Miami, FL$1,250 – $3,850$2,550+4%
Naples, FL$1,200 – $3,750$2,450+1%
North Port, FL$1,150 – $3,700$2,450level
Tampa, FL$1,150 – $3,700$2,400−1%
Crestview, FL$1,150 – $3,650$2,400−1%
Jacksonville, FL$1,150 – $3,650$2,400−1%
Cape Coral, FL$1,150 – $3,650$2,400−1%
Punta Gorda, FL$1,150 – $3,650$2,400−1%
Sebastian, FL$1,150 – $3,650$2,400−2%
Palm Bay, FL$1,150 – $3,650$2,400−2%
Port St. Lucie, FL$1,150 – $3,650$2,400−2%
Deltona, FL$1,150 – $3,600$2,400−2%
Panama City, FL$1,150 – $3,600$2,400−2%
Orlando, FL$1,150 – $3,600$2,400−2%
Pensacola, FL$1,150 – $3,600$2,400−3%
Gainesville, FL$1,150 – $3,550$2,350−4%
Lakeland, FL$1,150 – $3,550$2,350−4%
Ocala, FL$1,150 – $3,500$2,300−5%
Tallahassee, FL$1,150 – $3,450$2,300−6%

Extras that change the Florida total

Add-ons start from national price ranges and are scaled by 0.93 for Florida, which is the average of the area's wage index (0.87) and goods price index (0.98). The estimator above can add them to your total.

Add-on prices
Add-onLocal range
Add an acid or water-based stain$830 – $2,800

Basic, standard or premium: Florida prices

Bands overlap on purpose, since a good standard job can cost as much as a light premium one. Below are the three bands for the default size, then a grid from 10x10 (100 sq ft) to 20x20 (400 sq ft).

Basic

$1,200 to $2,200

Plain gray slab, broom finish, flat yard

Standard

$1,950 to $2,950

Colored or stained, saw-cut joints, minor grading

Premium

$2,700 to $3,700

Exposed aggregate or heavy decorative finish, drainage work

Cost by size and quality level
SizeBasicStandardPremium
10x10 (100 sq ft)$430 – $860$750 – $1,200$1,100 – $1,500
12x16 (192 sq ft)$770 – $1,450$1,300 – $2,000$1,800 – $2,500
20x20 (400 sq ft)$1,550 – $2,850$2,550 – $3,800$3,500 – $4,800

If you are planning more than one job in Florida

Each project weights the trades differently, so Florida's wage level does not push every price by the same amount. Compared with the US midpoint, paver patio is −6% and concrete driveway −9%.

Related projects with local prices
ProjectSizeRangevs. US
Concrete slab400 sq ft$2,250 – $4,900−6%
Stamped concrete400 sq ft$3,050 – $7,400−7%
Paver patio300 sq ft$2,800 – $5,150−6%
Wood deck300 sq ft$6,950 – $14,000−8%
Concrete driveway600 sq ft$3,350 – $8,300−9%
Asphalt driveway600 sq ft$2,900 – $6,950−6%

Why two Florida quotes can differ

  • Finish

    Plain concrete is $4-$12 per sq ft and a broom finish $6-$13; designs with several colors and decorative finishes run up to about $28 (HomeGuide).

  • Site prep

    Excavation, forms and a gravel base are the unglamorous part of the bill and vary most with soil and slope.

  • Size

    Small patios carry fixed costs for forms and mobilization, so the per-square-foot price drops as the patio gets bigger.

  • Permit

    Permits run $50-$400 where required. Many cities don't require one for a small at-grade patio.

Florida against its neighbors

Florida ranks 36 of 51 (the 50 states plus DC) for concrete patio, where 1 is the most expensive. The costliest is Hawaii at $3,650 and the cheapest Arkansas at $2,250, both for 300 sq ft at the midpoint. Florida sits at $2,450. The five states closest by workforce center are listed below.

States near Florida, same project and size
StateDistanceRangeMidpointvs. here
Georgia420 miles away$1,150 – $3,550$2,350−3%
South Carolina430 miles away$1,150 – $3,650$2,400−2%
Alabama480 miles away$1,100 – $3,450$2,250−7%
North Carolina540 miles away$1,150 – $3,600$2,400−2%
Mississippi550 miles away$1,100 – $3,400$2,250−7%

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $1,950 to $2,950 for Florida is attached.

A detailed PDF report of this estimate, $9

The report lays out the concrete patio numbers for Florida line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Concrete patio in Florida: your questions

+How much does it cost to pour a concrete patio in Florida?

$1,200 to $3,700 for 300 sq ft, using statewide wages and prices. Metro areas inside Florida can sit above or below that.

+Which city in Florida is cheapest for concrete patio?

Tallahassee at about $2,300 (midpoint, 300 sq ft). The priciest is Miami at $2,550.

+Is concrete patio cheaper in Florida than the US average?

It is 7% cheaper: $2,450 against $2,650 for 300 sq ft at the midpoint.

+What share of the price is labor in Florida?

About 48% ($1,200). Materials are 42%. Statewide labor for this job is weighted 0.87x the national wage level.

+What do cement masons and concrete finishers earn in Florida?

The BLS statewide median is $23.40 an hour, against $27.41 for the US. The 25th to 75th percentile range is $21.95 to $27.53.

+Where does Florida rank for concrete patio costs?

36th most expensive of 51 (the 50 states plus DC) at the midpoint, $2,450 for 300 sq ft. Rank 1 is the costliest.

+What do basic and premium concrete patio work cost in Florida?

For 300 sq ft, basic work runs $1,200 to $2,200 and premium work $2,700 to $3,700. Basic means: plain gray slab, broom finish, flat yard. Premium means: exposed aggregate or heavy decorative finish, drainage work.

+Does the season matter for concrete patio in Florida?

Yes where winters or summers are hard. Of the Florida metros we cover, Miami has the most comfortable months (12 of 12) based on NOAA 1991-2020 normals. Our prices do not change by month, so ask contractors whether they charge more or less in busy and slow seasons.

+What does "add an acid or water-based stain" add in Florida?

$830 to $2,800 for 300 sq ft, from a national range scaled by the statewide wage and goods indexes.

Concrete patio by city in Florida

Concrete patio: all pricesFlorida cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.

Note on derived figures: Materials = SimplyWise's sample 200 sq ft broom-finish patio line ($500-$900 in materials) divided by 200 sq ft.