Concrete patio cost in Florida
Statewide estimate from BLS wages and BEA prices. Reviewed Nov 4, 2026.
- Statewide range (300 sq ft)
- $1,200 – $3,700
- Per sq ft
- $3.75 – $11
- before permit
- Versus US midpoint
- −7%
- US $2,650
- Metros covered
- 19
What does it cost to pour a concrete patio in Florida? Plan on $1,200 to $3,700 for 300 sq ft. Wages (0.87x the US blend), materials (price index 98.1) and permit costs (103.4) put the state below the national midpoint by 7%.
Inside Florida, the metros we cover range from $2,300 (Tallahassee) to $2,550 (Miami) at the midpoint. Pick your closest city in the table for a tighter number.
Estimate your concrete patio cost
Pick a size, a quality level and where you live. Prices update as you type.
Estimated cost for 300 sq ft in Florida (statewide), standard level
$1,950 to $2,950
About $5.90 to $8.80 per sq ft before permits. Labor is about 48% of the bill.
| Part | Low | High |
|---|---|---|
| Materials | $910 | $1,150 |
| Labor | $860 | $1,500 |
| Permits and fees | $160 | $310 |
| Total | $1,950 | $2,950 |
Cost breakdown for 300 sq ft in Florida
| Part of the job | Low | Midpoint | High | Share |
|---|---|---|---|---|
| Materials | $740 | $1,050 | $1,300 | 42% |
| Labor | $390 | $1,200 | $1,950 | 48% |
| Permits and fees | $50 | $230 | $410 | 10% |
| Total | $1,200 | $2,450 | $3,700 | 100% |
When Florida weather lets you pour
Weather decides when pouring concrete can happen, and Florida is not uniform. The table uses NOAA's 1991-2020 climate normals from the weather station nearest each metro we cover, and counts the months that are neither cold nor hot enough to complicate the job.
Miami has the longest comfortable season of the metros we cover in Florida at 12 months; Punta Gorda has the shortest at 7 (October through April). Rainfall runs from 46 inches a year in Lakeland to 68 inches in Pensacola.
We do not adjust prices by month, because we have no reliable published data on seasonal pricing. Timing is still worth raising when you collect bids.
| Metro | Jan avg low °F | Jul avg high °F | Precip (in/yr) | Comfortable months |
|---|---|---|---|---|
| Miami | 61 | 88 | 57 | 12: all year |
| Tampa | 53 | 91 | 49 | 8: October through May |
| Orlando | 50 | 92 | 51 | 8: October through May |
| Jacksonville | 47 | 92 | 48 | 9: September through May |
| North Port | 51 | 93 | 53 | 7: October through April |
| Cape Coral | 54 | 92 | 57 | 7: October through April |
| Lakeland | 52 | 93 | 46 | 7: October through April |
| Palm Bay | 49 | 91 | 56 | 9: September through May |
| Deltona | 50 | 93 | 50 | 8: October through May |
| Pensacola | 44 | 92 | 68 | 9: September through May |
| Tallahassee | 41 | 92 | 59 | 9: September through May |
| Naples | 56 | 91 | 50 | 8: October through May |
| Port St. Lucie | 51 | 90 | 51 | 10: September through June |
| Gainesville | 43 | 91 | 48 | 9: September through May |
| Crestview | 39 | 92 | 64 | 8: February through May and September through December |
| Ocala | 46 | 92 | 52 | 8: October through May |
| Panama City | 43 | 91 | 61 | 10: September through June |
| Sebastian | 52 | 91 | 53 | 10: September through June |
| Punta Gorda | 51 | 93 | 53 | 7: October through April |
What cement masons and concrete finishers and the other trades earn in Florida
Florida's labor line is priced from 4 trades, each compared with its US median wage. After weighting by each trade's share of the work, the state comes out at 0.87 times the national level.
Cement masons and concrete finishers (47-2051), 50% of the weighting: a median of $23.40 an hour, 15% below the US median of $27.41. The middle half of them earn between $21.95 and $27.53 an hour. About 15,240 work in the state. That is 15.3 per 10,000 jobs, compared with 13.3 nationally, which suggests plenty of local crews to bid.
For construction laborers (47-2061, weighted 30%) the local median is $21.17 an hour, which is 7% below the national $22.66. The middle half of them earn between $17.83 and $23.06 an hour. BLS counts 87,040 of them working in the state, 87.7 for every 10,000 jobs (US: 70.5), so the local bench is deeper than average.
Carpenters (47-2031), 10% of the weighting: a median of $23.98 an hour, 18% below the US median of $29.12. The middle half of them earn between $21.41 and $28.79 an hour. About 39,300 work in the state. That is 39.6 per 10,000 jobs, compared with 43.1 nationally, so the supply of crews looks typical.
Operating engineers and other construction equipment operators (47-2073), 10% of the weighting: a median of $23.75 an hour, 17% below the US median of $28.78. The middle half of them earn between $22.27 and $28.06 an hour. About 27,510 work in the state. That is 27.7 per 10,000 jobs, compared with 30.7 nationally, so the supply of crews looks typical.
A crew paid at the 75th percentile for cement masons and concrete finishers ($27.53 an hour) would add about $100 to the statewide midpoint; one at the 25th percentile ($21.95) would take off about $35. Use that as a rough guide to how far a bid can sit from our midpoint on wages alone.
BLS counts 9,929,860 jobs across Florida (May 2025), which is 6.4% of US employment.
| Trade | Weight | 25th pct | Median | 75th pct | US median | Ratio | Level used |
|---|---|---|---|---|---|---|---|
| Cement masons and concrete finishers (47-2051) | 50% | $21.95 | $23.40 | $27.53 | $27.41 | 0.85 | state |
| Construction laborers (47-2061) | 30% | $17.83 | $21.17 | $23.06 | $22.66 | 0.93 | state |
| Carpenters (47-2031) | 10% | $21.41 | $23.98 | $28.79 | $29.12 | 0.82 | state |
| Operating engineers and other construction equipment operators (47-2073) | 10% | $22.27 | $23.75 | $28.06 | $28.78 | 0.83 | state |
| Blended | 100% | 0.87 | |||||
Concrete patio cost by metro in Florida
2 of the 19 metros sit above the statewide midpoint of $2,450, and the top-to-bottom gap is 11%. Each row prices the default size with that metro's own BLS wages and BEA price levels, so the gap between rows is real local variation rather than a flat markup.
| Metro | Range (300 sq ft) | Midpoint | vs. state |
|---|---|---|---|
| Miami, FL | $1,250 – $3,850 | $2,550 | +4% |
| Naples, FL | $1,200 – $3,750 | $2,450 | +1% |
| North Port, FL | $1,150 – $3,700 | $2,450 | level |
| Tampa, FL | $1,150 – $3,700 | $2,400 | −1% |
| Crestview, FL | $1,150 – $3,650 | $2,400 | −1% |
| Jacksonville, FL | $1,150 – $3,650 | $2,400 | −1% |
| Cape Coral, FL | $1,150 – $3,650 | $2,400 | −1% |
| Punta Gorda, FL | $1,150 – $3,650 | $2,400 | −1% |
| Sebastian, FL | $1,150 – $3,650 | $2,400 | −2% |
| Palm Bay, FL | $1,150 – $3,650 | $2,400 | −2% |
| Port St. Lucie, FL | $1,150 – $3,650 | $2,400 | −2% |
| Deltona, FL | $1,150 – $3,600 | $2,400 | −2% |
| Panama City, FL | $1,150 – $3,600 | $2,400 | −2% |
| Orlando, FL | $1,150 – $3,600 | $2,400 | −2% |
| Pensacola, FL | $1,150 – $3,600 | $2,400 | −3% |
| Gainesville, FL | $1,150 – $3,550 | $2,350 | −4% |
| Lakeland, FL | $1,150 – $3,550 | $2,350 | −4% |
| Ocala, FL | $1,150 – $3,500 | $2,300 | −5% |
| Tallahassee, FL | $1,150 – $3,450 | $2,300 | −6% |
Extras that change the Florida total
Add-ons start from national price ranges and are scaled by 0.93 for Florida, which is the average of the area's wage index (0.87) and goods price index (0.98). The estimator above can add them to your total.
| Add-on | Local range |
|---|---|
| Add an acid or water-based stain | $830 – $2,800 |
Basic, standard or premium: Florida prices
Bands overlap on purpose, since a good standard job can cost as much as a light premium one. Below are the three bands for the default size, then a grid from 10x10 (100 sq ft) to 20x20 (400 sq ft).
Basic
$1,200 to $2,200
Plain gray slab, broom finish, flat yard
Standard
$1,950 to $2,950
Colored or stained, saw-cut joints, minor grading
Premium
$2,700 to $3,700
Exposed aggregate or heavy decorative finish, drainage work
| Size | Basic | Standard | Premium |
|---|---|---|---|
| 10x10 (100 sq ft) | $430 – $860 | $750 – $1,200 | $1,100 – $1,500 |
| 12x16 (192 sq ft) | $770 – $1,450 | $1,300 – $2,000 | $1,800 – $2,500 |
| 20x20 (400 sq ft) | $1,550 – $2,850 | $2,550 – $3,800 | $3,500 – $4,800 |
If you are planning more than one job in Florida
Each project weights the trades differently, so Florida's wage level does not push every price by the same amount. Compared with the US midpoint, paver patio is −6% and concrete driveway −9%.
| Project | Size | Range | vs. US |
|---|---|---|---|
| Concrete slab | 400 sq ft | $2,250 – $4,900 | −6% |
| Stamped concrete | 400 sq ft | $3,050 – $7,400 | −7% |
| Paver patio | 300 sq ft | $2,800 – $5,150 | −6% |
| Wood deck | 300 sq ft | $6,950 – $14,000 | −8% |
| Concrete driveway | 600 sq ft | $3,350 – $8,300 | −9% |
| Asphalt driveway | 600 sq ft | $2,900 – $6,950 | −6% |
Why two Florida quotes can differ
Finish
Plain concrete is $4-$12 per sq ft and a broom finish $6-$13; designs with several colors and decorative finishes run up to about $28 (HomeGuide).
Site prep
Excavation, forms and a gravel base are the unglamorous part of the bill and vary most with soil and slope.
Size
Small patios carry fixed costs for forms and mobilization, so the per-square-foot price drops as the patio gets bigger.
Permit
Permits run $50-$400 where required. Many cities don't require one for a small at-grade patio.
Florida against its neighbors
Florida ranks 36 of 51 (the 50 states plus DC) for concrete patio, where 1 is the most expensive. The costliest is Hawaii at $3,650 and the cheapest Arkansas at $2,250, both for 300 sq ft at the midpoint. Florida sits at $2,450. The five states closest by workforce center are listed below.
| State | Distance | Range | Midpoint | vs. here |
|---|---|---|---|---|
| Georgia | 420 miles away | $1,150 – $3,550 | $2,350 | −3% |
| South Carolina | 430 miles away | $1,150 – $3,650 | $2,400 | −2% |
| Alabama | 480 miles away | $1,100 – $3,450 | $2,250 | −7% |
| North Carolina | 540 miles away | $1,150 – $3,600 | $2,400 | −2% |
| Mississippi | 550 miles away | $1,100 – $3,400 | $2,250 | −7% |
Get 3 local quotes
Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $1,950 to $2,950 for Florida is attached.
A detailed PDF report of this estimate, $9
The report lays out the concrete patio numbers for Florida line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.
Concrete patio in Florida: your questions
+How much does it cost to pour a concrete patio in Florida?
$1,200 to $3,700 for 300 sq ft, using statewide wages and prices. Metro areas inside Florida can sit above or below that.
+Which city in Florida is cheapest for concrete patio?
Tallahassee at about $2,300 (midpoint, 300 sq ft). The priciest is Miami at $2,550.
+Is concrete patio cheaper in Florida than the US average?
It is 7% cheaper: $2,450 against $2,650 for 300 sq ft at the midpoint.
+What share of the price is labor in Florida?
About 48% ($1,200). Materials are 42%. Statewide labor for this job is weighted 0.87x the national wage level.
+What do cement masons and concrete finishers earn in Florida?
The BLS statewide median is $23.40 an hour, against $27.41 for the US. The 25th to 75th percentile range is $21.95 to $27.53.
+Where does Florida rank for concrete patio costs?
36th most expensive of 51 (the 50 states plus DC) at the midpoint, $2,450 for 300 sq ft. Rank 1 is the costliest.
+What do basic and premium concrete patio work cost in Florida?
For 300 sq ft, basic work runs $1,200 to $2,200 and premium work $2,700 to $3,700. Basic means: plain gray slab, broom finish, flat yard. Premium means: exposed aggregate or heavy decorative finish, drainage work.
+Does the season matter for concrete patio in Florida?
Yes where winters or summers are hard. Of the Florida metros we cover, Miami has the most comfortable months (12 of 12) based on NOAA 1991-2020 normals. Our prices do not change by month, so ask contractors whether they charge more or less in busy and slow seasons.
+What does "add an acid or water-based stain" add in Florida?
$830 to $2,800 for 300 sq ft, from a national range scaled by the statewide wage and goods indexes.
Concrete patio by city in Florida
- Miami, FL$2,550 midpoint
- Naples, FL$2,450 midpoint
- North Port, FL$2,450 midpoint
- Tampa, FL$2,400 midpoint
- Crestview, FL$2,400 midpoint
- Jacksonville, FL$2,400 midpoint
- Cape Coral, FL$2,400 midpoint
- Punta Gorda, FL$2,400 midpoint
- Sebastian, FL$2,400 midpoint
- Palm Bay, FL$2,400 midpoint
- Port St. Lucie, FL$2,400 midpoint
- Deltona, FL$2,400 midpoint
- Panama City, FL$2,400 midpoint
- Orlando, FL$2,400 midpoint
- Pensacola, FL$2,400 midpoint
- Gainesville, FL$2,350 midpoint
- Lakeland, FL$2,350 midpoint
- Ocala, FL$2,300 midpoint
- Tallahassee, FL$2,300 midpoint
Where these numbers come from
Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.
- HomeGuide: How Much Does a Concrete Patio Cost? (2026) (accessed November 4, 2026)
- SimplyWise: Concrete Estimate Template: Free PDF + Excel (2026) (accessed November 4, 2026)
- HomeGuide: How Much Does Stamped Concrete Cost? (2026) (accessed November 4, 2026)
- BLS Occupational Employment and Wage Statistics, May 2025
- BEA Regional Price Parities, 2024
- NOAA NCEI U.S. Climate Normals, 1991-2020
Note on derived figures: Materials = SimplyWise's sample 200 sq ft broom-finish patio line ($500-$900 in materials) divided by 200 sq ft.