Composite deck cost in Huntington, WV
Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.
- Typical range (300 sq ft)
- $11,000 – $22,000
- Per sq ft
- $36.50 – $73
- before permit
- Versus US midpoint
- −9%
- US $18,100
- Rank of 300 metros
- #176
- 1 = most expensive
Huntington homeowners pay roughly $11,000 to $22,000 to build a composite deck at 300 sq ft, or $36.50 to $73 per sq ft (permit not included). Against the US midpoint, Huntington is 9% lower. Carpenters earn a median of $25.00 an hour in the Huntington area, 14% below the US median of $29.12.
Estimate your composite deck cost
Pick a size, a quality level and where you live. Prices update as you type.
Estimated cost for 300 sq ft in Huntington, WV, standard level
$14,300 to $18,700
About $47.50 to $62 per sq ft before permits. Labor is about 57% of the bill.
| Part | Low | High |
|---|---|---|
| Materials | $6,000 | $7,850 |
| Labor | $8,200 | $10,800 |
| Permits and fees | $70 | $110 |
| Total | $14,300 | $18,700 |
Cost breakdown for 300 sq ft in Huntington, WV
| Part of the job | Low | Midpoint | High | Share |
|---|---|---|---|---|
| Materials | $4,600 | $6,950 | $9,250 | 42% |
| Labor | $6,350 | $9,500 | $12,700 | 57% |
| Permits and fees | $45 | $90 | $130 | 1% |
| Total | $11,000 | $16,500 | $22,000 | 100% |
What is behind the Huntington number
We price the labor side from BLS wage data for 2 trades: carpenters at 80%, construction laborers at 20%. Weighted together, Huntington wages are 0.88 times the national level. Labor makes up about 57% of the midpoint estimate (60% at national prices).
On the materials line, the BEA goods price index for the Huntington metro is 96.3 (US = 100). The midpoint materials bill for 300 sq ft comes to $6,950, compared with $7,200 at national prices. Permit and inspection fees are scaled by the broader index (88.4) and land at $45 to $130.
Local wages behind the labor line
Wages are the part of this estimate that changes most from town to town. 2 trades carry the job here, and each is compared with its US median. The weighted result for Huntington is 0.88 times the national level.
For carpenters (47-2031, weighted 80%) the local median is $25.00 an hour, which is 14% below the national $29.12. The middle half of them earn between $19.78 and $30.27 an hour. BLS counts 780 of them working in the area, 55.4 for every 10,000 jobs (US: 43.1), so the local bench is deeper than average.
Construction laborers (47-2061), 20% of the weighting: a median of $21.72 an hour, 4% below the US median of $22.66. The middle half of them earn between $17.76 and $28.49 an hour. About 1,580 work in the metro. That is 112.3 per 10,000 jobs, compared with 70.5 nationally, which suggests plenty of local crews to bid.
Quotes come from real crews, not medians. If the carpenters on your job are paid at the 75th percentile ($30.27 an hour) instead of the median, the labor line grows by about $1,550. At the 25th percentile ($19.78) it shrinks by about $1,550. The total moves by 9.5% or 9.4%, so wages alone rarely explain a quote that is far outside our range.
For context on the local economy, BLS counts 140,740 jobs in the Huntington-Ashland area. That makes it the 159th largest of the 300 metros we cover, with 0.09% of US employment.
| Trade | Weight | 25th pct | Median | 75th pct | US median | Ratio | Level used |
|---|---|---|---|---|---|---|---|
| Carpenters (47-2031) | 80% | $19.78 | $25.00 | $30.27 | $29.12 | 0.86 | metro |
| Construction laborers (47-2061) | 20% | $17.76 | $21.72 | $28.49 | $22.66 | 0.96 | metro |
| Blended | 100% | 0.88 | |||||
What nearby projects cost in Huntington
Because every project leans on different trades, Huntington's wage level does not move all prices equally. Against the US midpoint, gutters runs −1% and paver patio −10%.
| Project | Size | Range | vs. US |
|---|---|---|---|
| Wood deck | 300 sq ft | $7,000 – $14,000 | −7% |
| Concrete patio | 300 sq ft | $1,200 – $3,800 | −4% |
| Paver patio | 300 sq ft | $2,700 – $4,900 | −10% |
| Gutters | 160 linear ft | $1,300 – $4,150 | −1% |
When to schedule composite deck in Huntington
We use NOAA's 1991-2020 climate normals for Huntington Tri State Ap (5 miles from the city center). These are 30-year monthly averages, not forecasts.
February through December is the stretch where exterior installation runs into the fewest weather problems in Huntington (11 of 12 months). January has an average daytime high under 45°F.
In January the average high stays below 45°F. Sealants, adhesives and some materials, such as vinyl, are harder to install well in the cold, and short daylight cuts the working day.
Huntington gets about 45 inches of precipitation in a normal year, including roughly 20 inches of snow. The wettest months are May, June and July (5.1 inches in July). Inside the workable window, October and November are the driest, at 3.0 and 3.1 inches. The station averages about 25 days a year at 90°F or above.
Does the season change the price? Probably, but we do not have a sourced seasonal price curve, so the estimator shows a year-round figure and does not adjust by month. When you collect quotes, ask whether scheduling in a slower month gets a better rate.
| Month | Avg high °F | Avg low °F | Precip (in) | For this job |
|---|---|---|---|---|
| Jan | 43 | 26 | 3.1 | Cold |
| Feb | 47 | 29 | 3.4 | Workable |
| Mar | 57 | 36 | 4.2 | Workable |
| Apr | 69 | 46 | 3.9 | Workable |
| May | 76 | 54 | 4.5 | Workable |
| Jun | 83 | 62 | 4.2 | Workable |
| Jul | 86 | 66 | 5.1 | Workable |
| Aug | 86 | 65 | 4.0 | Workable |
| Sep | 80 | 58 | 3.2 | Workable |
| Oct | 69 | 46 | 3.0 | Workable |
| Nov | 57 | 37 | 3.1 | Workable |
| Dec | 47 | 30 | 3.6 | Workable |
Huntington against nearby metros and the rest of West Virginia
Same job, same size (300 sq ft), priced for the nearest metros. Columbus is the priciest of the group at $19,100. Kingsport is the cheapest at $16,000.
| Area | Range | Midpoint | vs. here |
|---|---|---|---|
| Huntington, WVthis page | $11,000 – $22,000 | $16,500 | |
| Charleston, WV60 miles | $10,800 – $21,600 | $16,200 | −2% |
| Lexington, KY100 miles | $11,000 – $22,100 | $16,600 | level |
| Columbus, OH110 miles | $12,700 – $25,500 | $19,100 | +16% |
| Cincinnati, OH115 miles | $11,900 – $23,900 | $17,900 | +9% |
| Kingsport, TN120 miles | $10,600 – $21,300 | $16,000 | −3% |
| West Virginia (statewide) | $10,600 – $21,300 | $15,900 | −3% |
| United States | $12,100 – $24,200 | $18,100 | +10% |
Across 300 US metros, Huntington comes in at #176 from the top. The priciest is Honolulu, HI at $25,200; the cheapest is Brownsville, TX at $13,500 (midpoints, 300 sq ft). Statewide, Huntington is 4% above the West Virginia figure.
Other West Virginia metros
| Metro | Size | Range | Midpoint | vs. here |
|---|---|---|---|---|
| Charleston, WV | 103,450 jobs | $10,800 – $21,600 | $16,200 | −2% |
| Morgantown, WV | 67,370 jobs | $10,700 – $21,400 | $16,100 | −3% |
| Wheeling, WV | 58,130 jobs | $10,800 – $21,700 | $16,300 | −1% |
Cities with a workforce like Huntington's
Big cities and small ones price differently, so here is Huntington against the 4 metros with the closest total employment.
| Metro | Size | Range | Midpoint | vs. here |
|---|---|---|---|---|
| Vallejo, CA | 144,130 jobs | $14,300 – $28,600 | $21,400 | +30% |
| Cedar Rapids, IA | 139,260 jobs | $11,600 – $23,300 | $17,500 | +6% |
| Myrtle Beach, SC | 146,260 jobs | $10,400 – $20,800 | $15,600 | −6% |
| Rockford, IL | 137,650 jobs | $13,200 – $26,500 | $19,900 | +20% |
Extras that change the Huntington total
Extras are quoted nationally and then scaled to Huntington by the average of the local wage index (0.88) and goods index (0.96), a factor of 0.92. Tick any of them in the estimator above to add them to your total. Treat these as planning figures: an add-on touches different trades than the main job, so the scaling is an approximation.
| Add-on | Local range |
|---|---|
| Add a deck railing (approx. 0.3 ft per sq ft) | $1,650 – $4,950 |
Huntington: what basic, standard and premium work costs
Three bands are cut from the same cited range and localized for Huntington wages and prices. They overlap on purpose: a good standard job and a modest premium job can cost the same. The grid below prices the same bands at 4 common sizes.
Basic
$11,000 to $15,400
Entry-level composite boards, low deck, simple shape
Standard
$14,300 to $18,700
Mid-grade capped boards with railing and stairs
Premium
$17,600 to $22,000
Premium capped or PVC boards, multi-level, hidden fasteners
| Size | Basic | Standard | Premium |
|---|---|---|---|
| 10x12 (120 sq ft) | $4,400 – $6,200 | $5,750 – $7,550 | $7,100 – $8,900 |
| 12x12 (144 sq ft) | $5,300 – $7,450 | $6,900 – $9,050 | $8,500 – $10,600 |
| 16x20 (320 sq ft) | $11,700 – $16,400 | $15,300 – $20,000 | $18,800 – $23,500 |
| 20x20 (400 sq ft) | $14,600 – $20,500 | $19,000 – $24,900 | $23,500 – $29,300 |
Specs and site conditions that change a Huntington bid
Engineering
Large or complex decks may need a structural engineer at $100-$220 an hour to get a permit.
Board grade
Composite materials run $16-$32 per sq ft and the installed price is $40-$80 per sq ft, including the substructure (HomeGuide).
Labor
Labor for composite is $24-$48 per sq ft, higher than wood because the boards need extra parts and more careful assembly.
Get 3 local quotes
Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $14,300 to $18,700 for Huntington, WV is attached.
A detailed PDF report of this estimate, $9
Multi-page report for Huntington, WV: low, typical and high cost, a line-item breakdown of materials and labor by trade, permit notes, the best months to schedule, a quote comparison sheet, red flags, questions for contractors, checklists and every source. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.
Composite deck in Huntington: your questions
+How much does it cost to build a composite deck in Huntington?
For 300 sq ft, expect $11,000 to $22,000 in the Huntington area. A standard-spec job lands at $14,300 to $18,700. Small jobs usually cost more per sq ft and large ones less.
+What is the price per sq ft for composite deck in Huntington?
About $36.50 to $73 per sq ft for materials and labor, plus $45 to $130 for the permit if one is needed. The US range is $40 to $80.
+Is composite deck cheaper in Huntington or Charleston?
Charleston is 60 miles away. The midpoint for 300 sq ft there is $16,200, which is 2% less than Huntington ($16,500). Wage and materials indexes both feed that gap.
+How much of the bill is labor in Huntington?
About 57% at the midpoint, or $9,500 out of $16,500. Materials are 42% and permits 1%. Nationally, labor is 60%.
+What would 16x20 (320 sq ft) cost in Huntington?
$11,700 to $23,500. Pick a different size in the estimator above to get your own number.
+Does composite deck need a permit in Huntington?
Often, but rules are set by your city or county building office, so call before you hire. Budget $45 to $130 for fees in the Huntington area (our national range of $50 to $150 scaled by the local price level).
+Is Huntington expensive for composite deck compared with the rest of West Virginia?
Huntington is 4% above the West Virginia statewide estimate ($15,900 at the midpoint). We cover 4 metros in West Virginia; see the state page to compare them.
+What do carpenters earn in Huntington?
The BLS median is $25.00 an hour in the Huntington area, compared with $29.12 nationally. The 25th to 75th percentile range is $19.78 to $30.27.
+What do basic and premium composite deck work cost in Huntington?
For 300 sq ft, basic work runs $11,000 to $15,400 and premium work $17,600 to $22,000. Basic means: entry-level composite boards, low deck, simple shape. Premium means: premium capped or PVC boards, multi-level, hidden fasteners.
+When is the best time to build a composite deck in Huntington?
Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are February through December. October and November are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.
+What does "add a deck railing" add in Huntington?
$1,650 to $4,950 for 300 sq ft, from a national range scaled by the local wage and goods indexes.
Composite deck near Huntington
Where these numbers come from
Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.
- HomeGuide: How Much Does Composite Decking Cost? (2026) (accessed November 4, 2026)
- HomeGuide: 2026 Building Permit Costs | Fees & Cost Calculator (accessed November 4, 2026)
- BLS Occupational Employment and Wage Statistics, May 2025
- BEA Regional Price Parities, 2024
- NOAA NCEI U.S. Climate Normals, 1991-2020