Skip to content
CostLocal

Composite deck cost in Muskegon, MI

Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.

Typical range (300 sq ft)
$10,600 – $21,300
Per sq ft
$35.50 – $70.50
before permit
Versus US midpoint
−12%
US $18,100
Rank of 300 metros
#232
1 = most expensive

Muskegon homeowners pay roughly $10,600 to $21,300 to build a composite deck at 300 sq ft, or $35.50 to $70.50 per sq ft (permit not included). Against the US midpoint, Muskegon is 12% lower. Carpenters earn a median of $23.47 an hour in the Muskegon area, 19% below the US median of $29.12.

Estimate your composite deck cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

Mid-grade capped boards with railing and stairs

Add-ons

Estimated cost for 300 sq ft in Muskegon, MI, standard level

$13,800 to $18,100

About $46 to $60 per sq ft before permits. Labor is about 57% of the bill.

Cost breakdown
PartLowHigh
Materials$5,850$7,650
Labor$7,900$10,300
Permits and fees$75$110
Total$13,800$18,100
Save and get a PDF report

Cost breakdown for 300 sq ft in Muskegon, MI

Part of the jobLowMidpointHighShare
Materials$4,500$6,750$9,00042%
Labor$6,100$9,100$12,20057%
Permits and fees$45$95$1401%
Total$10,600$16,000$21,300100%

Why Muskegon prices look the way they do

Labor is 57% of the midpoint bill here, against 60% nationally. The mix of trades behind this job is carpenters (80%), construction laborers (20%). We weight each trade's local median wage by that share and compare it with the national median. In Muskegon the blended ratio comes out at 0.84.

On the materials line, the BEA goods price index for the Muskegon metro is 93.7 (US = 100). The midpoint materials bill for 300 sq ft comes to $6,750, compared with $7,200 at national prices. Permit and inspection fees are scaled by the broader index (92.5) and land at $45 to $140.

Cost by quality level and size in Muskegon

Three bands are cut from the same cited range and localized for Muskegon wages and prices. They overlap on purpose: a good standard job and a modest premium job can cost the same. The grid below prices the same bands at 4 common sizes.

Basic

$10,600 to $14,900

Entry-level composite boards, low deck, simple shape

Standard

$13,800 to $18,100

Mid-grade capped boards with railing and stairs

Premium

$17,000 to $21,300

Premium capped or PVC boards, multi-level, hidden fasteners

Cost by size and quality level
SizeBasicStandardPremium
10x12 (120 sq ft)$4,300 – $6,000$5,550 – $7,300$6,850 – $8,600
12x12 (144 sq ft)$5,100 – $7,200$6,650 – $8,750$8,200 – $10,300
16x20 (320 sq ft)$11,300 – $15,900$14,700 – $19,300$18,200 – $22,700
20x20 (400 sq ft)$14,100 – $19,800$18,400 – $24,100$22,700 – $28,300

Optional extras in Muskegon

Extras are quoted nationally and then scaled to Muskegon by the average of the local wage index (0.84) and goods index (0.94), a factor of 0.89. Tick any of them in the estimator above to add them to your total. Treat these as planning figures: an add-on touches different trades than the main job, so the scaling is an approximation.

Add-on prices
Add-onLocal range
Add a deck railing (approx. 0.3 ft per sq ft)$1,600 – $4,800

How Muskegon compares

Of the five closest metros, none is cheaper than Muskegon. Grand Rapids comes closest at about $17,400.

Comparison with nearby areas
AreaRangeMidpointvs. here
Muskegon, MIthis page$10,600 – $21,300$16,000
Grand Rapids, MI45 miles$11,600 – $23,300$17,400+9%
Sheboygan, WI70 miles$12,200 – $24,500$18,400+15%
Milwaukee, WI80 miles$12,400 – $24,800$18,600+17%
Racine, WI80 miles$12,000 – $24,100$18,000+13%
Kalamazoo, MI95 miles$11,900 – $23,900$17,900+12%
Michigan (statewide)$12,000 – $24,100$18,100+13%
United States$12,100 – $24,200$18,100+13%

Across 300 US metros, Muskegon comes in at #232 from the top. The priciest is Honolulu, HI at $25,200; the cheapest is Brownsville, TX at $13,500 (midpoints, 300 sq ft). Statewide, Muskegon is 12% below the Michigan figure.

Other Michigan metros

Michigan metros compared with Muskegon
MetroSizeRangeMidpointvs. here
Detroit, MI1,904,530 jobs$12,800 – $25,700$19,200+21%
Grand Rapids, MI598,260 jobs$11,600 – $23,300$17,400+9%
Ann Arbor, MI219,730 jobs$12,300 – $24,700$18,500+16%
Lansing, MI217,180 jobs$12,400 – $24,900$18,600+17%
Flint, MI135,040 jobs$12,100 – $24,300$18,200+14%
Kalamazoo, MI121,790 jobs$11,900 – $23,900$17,900+12%

Cities with a workforce like Muskegon's

Big cities and small ones price differently, so here is Muskegon against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
Terre Haute, IN65,120 jobs$11,700 – $23,500$17,600+10%
Vineland, NJ62,300 jobs$13,400 – $26,900$20,200+26%
Dalton, GA65,300 jobs$9,800 – $19,700$14,700−8%
Hattiesburg, MS62,230 jobs$10,400 – $20,700$15,600−3%

Related projects, priced for Muskegon

Because every project leans on different trades, Muskegon's wage level does not move all prices equally. Against the US midpoint, gutters runs +2% and wood deck −10%.

Related projects with local prices
ProjectSizeRangevs. US
Wood deck300 sq ft$6,750 – $13,600−10%
Concrete patio300 sq ft$1,200 – $3,850−4%
Paver patio300 sq ft$2,900 – $5,300−3%
Gutters160 linear ft$1,350 – $4,250+2%

Composite deck: what moves the price in Muskegon

  • Board grade

    Composite materials run $16-$32 per sq ft and the installed price is $40-$80 per sq ft, including the substructure (HomeGuide).

  • Labor

    Labor for composite is $24-$48 per sq ft, higher than wood because the boards need extra parts and more careful assembly.

  • Drainage

    Ground-level decks over poorly draining yards may need $1,000-$4,000 of drainage work first.

Local wages behind the labor line

Wages are the part of this estimate that changes most from town to town. 2 trades carry the job here, and each is compared with its US median. The weighted result for Muskegon is 0.84 times the national level.

For carpenters (47-2031, weighted 80%) the local median is $23.47 an hour, which is 19% below the national $29.12. The middle half of them earn between $21.00 and $29.72 an hour. BLS counts 140 of them working in the area, 22.5 for every 10,000 jobs (US: 43.1), so the local bench is thinner than average.

Construction laborers (47-2061), 20% of the weighting: a median of $22.60 an hour, in line with the US median of $22.66. The middle half of them earn between $18.99 and $28.27 an hour. About 270 work in the metro. That is 43.3 per 10,000 jobs, compared with 70.5 nationally, so expect fewer local crews to bid.

Quotes come from real crews, not medians. If the carpenters on your job are paid at the 75th percentile ($29.72 an hour) instead of the median, the labor line grows by about $1,850. At the 25th percentile ($21.00) it shrinks by about $730. The total moves by 11.6% or 4.6%, so wages alone rarely explain a quote that is far outside our range.

For context on the local economy, BLS counts 62,340 jobs in the Muskegon-Norton Shores area. That makes it the 278th largest of the 300 metros we cover, with 0.04% of US employment.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Carpenters (47-2031)80%$21.00$23.47$29.72$29.120.81metro
Construction laborers (47-2061)20%$18.99$22.60$28.27$22.661.00metro
Blended100%0.84

When to schedule composite deck in Muskegon

We use NOAA's 1991-2020 climate normals for Muskegon Co Ap (5 miles from the city center). These are 30-year monthly averages, not forecasts.

April through November is the stretch where exterior installation runs into the fewest weather problems in Muskegon (8 of 12 months). January, February, March and December have an average daytime high under 45°F.

In January, February, March and December the average high stays below 45°F. Sealants, adhesives and some materials, such as vinyl, are harder to install well in the cold, and short daylight cuts the working day.

Muskegon gets about 35 inches of precipitation in a normal year, including roughly 87 inches of snow. The wettest months are April, May and October (3.8 inches in October). Inside the workable window, July and November are the driest, at 2.8 and 2.9 inches. The station averages about 3 days a year at 90°F or above.

Does the season change the price? Probably, but we do not have a sourced seasonal price curve, so the estimator shows a year-round figure and does not adjust by month. When you collect quotes, ask whether scheduling in a slower month gets a better rate.

Monthly normals, Muskegon Co Ap (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan33212.4Cold
Feb35212.1Cold
Mar44272.4Cold
Apr57373.5Workable
May68483.4Workable
Jun78573.0Workable
Jul82622.8Workable
Aug80613.1Workable
Sep73543.3Workable
Oct61433.8Workable
Nov48342.9Workable
Dec37262.4Cold

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $13,800 to $18,100 for Muskegon, MI is attached.

Detailed composite deck report for Muskegon, MI, $9

Multi-page report for Muskegon, MI: low, typical and high cost, a line-item breakdown of materials and labor by trade, permit notes, the best months to schedule, a quote comparison sheet, red flags, questions for contractors, checklists and every source. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Composite deck in Muskegon: your questions

+How much does it cost to build a composite deck in Muskegon?

For 300 sq ft, expect $10,600 to $21,300 in the Muskegon area. A standard-spec job lands at $13,800 to $18,100. Small jobs usually cost more per sq ft and large ones less.

+What is the price per sq ft for composite deck in Muskegon?

About $35.50 to $70.50 per sq ft for materials and labor, plus $45 to $140 for the permit if one is needed. The US range is $40 to $80.

+Is composite deck cheaper in Muskegon or Grand Rapids?

Grand Rapids is 45 miles away. The midpoint for 300 sq ft there is $17,400, which is 9% more than Muskegon ($16,000). Wage and materials indexes both feed that gap.

+How much of the bill is labor in Muskegon?

About 57% at the midpoint, or $9,100 out of $16,000. Materials are 42% and permits 1%. Nationally, labor is 60%.

+What would 16x20 (320 sq ft) cost in Muskegon?

$11,300 to $22,700. Pick a different size in the estimator above to get your own number.

+Does composite deck need a permit in Muskegon?

Often, but rules are set by your city or county building office, so call before you hire. Budget $45 to $140 for fees in the Muskegon area (our national range of $50 to $150 scaled by the local price level).

+Is Muskegon expensive for composite deck compared with the rest of Michigan?

Muskegon is 12% below the Michigan statewide estimate ($18,100 at the midpoint). We cover 10 metros in Michigan; see the state page to compare them.

+What do carpenters earn in Muskegon?

The BLS median is $23.47 an hour in the Muskegon area, compared with $29.12 nationally. The 25th to 75th percentile range is $21.00 to $29.72.

+What do basic and premium composite deck work cost in Muskegon?

For 300 sq ft, basic work runs $10,600 to $14,900 and premium work $17,000 to $21,300. Basic means: entry-level composite boards, low deck, simple shape. Premium means: premium capped or PVC boards, multi-level, hidden fasteners.

+When is the best time to build a composite deck in Muskegon?

Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are April through November. July and November are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.

+What does "add a deck railing" add in Muskegon?

$1,600 to $4,800 for 300 sq ft, from a national range scaled by the local wage and goods indexes.

Composite deck near Muskegon

Composite deck: all pricesComposite deck in MichiganAll projects in MuskegonMichigan cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.