Shower pan cost in Miami, FL
Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.
- Typical range (1 pan)
- $850 – $2,750
- Per pan
- $820 – $2,180
- before permit
- Versus US midpoint
- −3%
- US $1,850
- Rank of 300 metros
- #139
- 1 = most expensive
Local price for a shower pan in the Miami area: $850 to $2,750 for 1 pan. The low end is a basic job on easy ground; the high end is a premium spec with harder access. The midpoint runs 3% lower than the US figure. Plumbers, pipefitters and steamfitters earn a median of $27.77 an hour in the Miami area, 9% below the US median of $30.67.
Estimate your shower pan cost
Pick a size, a quality level and where you live. Prices update as you type.
Estimated cost for 1 pan in Miami, FL, standard level
$1,400 to $2,200
About $1,228 to $1,772 per pan before permits. Labor is about 52% of the bill.
| Part | Low | High |
|---|---|---|
| Materials | $400 | $740 |
| Labor | $820 | $1,050 |
| Permits and fees | $200 | $410 |
| Total | $1,400 | $2,200 |
Cost breakdown for 1 pan in Miami, FL
| Part of the job | Low | Midpoint | High | Share |
|---|---|---|---|---|
| Materials | $160 | $570 | $980 | 32% |
| Labor | $660 | $930 | $1,200 | 52% |
| Permits and fees | $35 | $300 | $570 | 17% |
| Total | $850 | $1,800 | $2,750 | 100% |
Where the Miami price comes from
Labor is 52% of the midpoint bill here, against 56% nationally. The mix of trades behind this job is plumbers, pipefitters and steamfitters (50%), tile and stone setters (50%). We weight each trade's local median wage by that share and compare it with the national median. In Miami the blended ratio comes out at 0.89.
Materials are scaled with BEA's regional price parity for goods. Miami is at 103.6 against 100 for the US, so a materials line of $550 nationally becomes $570 here (midpoint, 1 pan). Permits follow the all-items index of 114.2: $35 to $570.
Cost by quality level and size in Miami
The cited range is split into basic, standard and premium bands, then scaled to Miami. Bands overlap, because plenty of standard jobs cost as much as a light premium one. Sizes run from one shower pan to one shower pan.
Basic
$850 to $1,600
Pre-made acrylic or fiberglass pan
Standard
$1,400 to $2,200
Tile-ready pan with tile finish
Premium
$2,000 to $2,750
Custom mud or stone pan
| Size | Basic | Standard | Premium |
|---|---|---|---|
| one shower pan | $850 – $1,600 | $1,400 – $2,200 | $2,000 – $2,750 |
What nearby projects cost in Miami
Jobs that often go together with shower pan are priced below at their usual sizes, using the same Miami wage and price inputs. Compared with national midpoints, kitchen remodel comes out highest (+1%) and bathroom remodel lowest (−4%); the gap comes from the trades each job uses.
| Project | Size | Range | vs. US |
|---|---|---|---|
| Bathroom remodel | 45 sq ft | $4,550 – $22,400 | −4% |
| Kitchen cabinets | 25 linear ft | $4,250 – $13,400 | −3% |
| Window replacement | 10 windows | $4,300 – $14,700 | −2% |
| Kitchen remodel | 120 sq ft | $18,600 – $31,800 | +1% |
| Kitchen backsplash | 30 sq ft | $290 – $1,450 | −4% |
Shower pan: what moves the price in Miami
Extras
Benches, trench drains and curb changes add $100-$600.
Tile
Tile for the shower costs $10-$50 per square foot installed, and that comes on top of the pan.
Permit
Plumbing permits are $30-$500, and many cities require one to replace a shower pan.
Who does the work: Miami trade wages
The labor line is built from BLS wage data, one trade at a time. This job draws on 2 trades. We compare each trade's local median with the US median, weight the ratios by how much of the job each trade does, and apply the blend to the national labor cost. For Miami the blend is 0.89.
Plumbers, pipefitters and steamfitters (47-2152), 50% of the weighting: a median of $27.77 an hour, 9% below the US median of $30.67. The middle half of them earn between $22.86 and $30.75 an hour. About 5,930 work in the metro. That is 21.0 per 10,000 jobs, compared with 30.0 nationally, so expect fewer local crews to bid.
Tile and stone setters (47-2044), 50% of the weighting: a median of $23.22 an hour, 13% below the US median of $26.77. The middle half of them earn between $18.80 and $30.47 an hour. About 950 work in the metro. That is 3.4 per 10,000 jobs, compared with 2.3 nationally, which suggests plenty of local crews to bid.
A quick sensitivity check: moving the lead trade (plumbers, pipefitters and steamfitters) from the median to the 75th percentile wage adds about $50 to the midpoint estimate; the 25th percentile takes off about $85. That is a swing of roughly 4.7% to 2.8% of the total, which is useful for judging whether a bid reflects wages or something else, such as scope or margin.
Miami-Fort Lauderdale-West Palm Beach has 2,819,940 jobs in total (BLS, May 2025), ranking 9th by size among the 300 metros on this site.
| Trade | Weight | 25th pct | Median | 75th pct | US median | Ratio | Level used |
|---|---|---|---|---|---|---|---|
| Plumbers, pipefitters and steamfitters (47-2152) | 50% | $22.86 | $27.77 | $30.75 | $30.67 | 0.91 | metro |
| Tile and stone setters (47-2044) | 50% | $18.80 | $23.22 | $30.47 | $26.77 | 0.87 | metro |
| Blended | 100% | 0.89 | |||||
Is Miami cheap or dear? The local comparison
Same job, same size (1 pan), priced for the nearest metros. Miami is the priciest of the group. Cape Coral is the cheapest at $1,650.
| Area | Range | Midpoint | vs. here |
|---|---|---|---|
| Miami, FLthis page | $850 – $2,750 | $1,800 | |
| Naples, FL55 miles | $870 – $2,700 | $1,800 | −1% |
| Port St. Lucie, FL80 miles | $800 – $2,550 | $1,650 | −7% |
| Cape Coral, FL100 miles | $790 – $2,550 | $1,650 | −8% |
| Punta Gorda, FL110 miles | $810 – $2,550 | $1,700 | −6% |
| Sebastian, FL110 miles | $820 – $2,550 | $1,700 | −6% |
| Florida (statewide) | $810 – $2,600 | $1,700 | −6% |
| United States | $930 – $2,800 | $1,850 | +3% |
Out of the 300 metros we cover, Miami ranks #139 for the cost of this job (#1 is the most expensive). Statewide, Miami is 6% above the Florida figure.
Elsewhere in Florida
| Metro | Size | Range | Midpoint | vs. here |
|---|---|---|---|---|
| Tampa, FL | 1,447,120 jobs | $790 – $2,500 | $1,650 | −8% |
| Orlando, FL | 1,411,730 jobs | $820 – $2,600 | $1,700 | −6% |
| Jacksonville, FL | 765,930 jobs | $830 – $2,600 | $1,700 | −5% |
| North Port, FL | 339,940 jobs | $820 – $2,600 | $1,700 | −5% |
| Cape Coral, FL | 304,790 jobs | $790 – $2,550 | $1,650 | −8% |
| Lakeland, FL | 265,280 jobs | $780 – $2,500 | $1,650 | −9% |
Metros of a similar size
Big cities and small ones price differently, so here is Miami against the 4 metros with the closest total employment.
| Metro | Size | Range | Midpoint | vs. here |
|---|---|---|---|---|
| Atlanta, GA | 2,889,670 jobs | $850 – $2,650 | $1,750 | −3% |
| Boston, MA | 2,703,890 jobs | $1,300 – $3,500 | $2,400 | +33% |
| Philadelphia, PA | 2,897,830 jobs | $1,100 – $3,100 | $2,100 | +16% |
| Phoenix, AZ | 2,375,760 jobs | $910 – $2,750 | $1,850 | +1% |
Get 3 local quotes
Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $1,400 to $2,200 for Miami, FL is attached.
A detailed PDF report of this estimate, $9
The report lays out the shower pan numbers for Miami, FL line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.
Shower pan in Miami: your questions
+How much does it cost to install a shower pan in Miami?
For 1 pan, expect $850 to $2,750 in the Miami area. A standard-spec job lands at $1,400 to $2,200. Small jobs usually cost more per pan and large ones less.
+What is the price per pan for shower pan in Miami?
About $820 to $2,180 per pan for materials and labor, plus $35 to $570 for the permit if one is needed. The US range is $900 to $2,300.
+Is shower pan cheaper in Miami or Naples?
Naples is 55 miles away. The midpoint for 1 pan there is $1,800, which is 1% less than Miami ($1,800). Wage and materials indexes both feed that gap.
+How much of the bill is labor in Miami?
About 52% at the midpoint, or $930 out of $1,800. Materials are 32% and permits 17%. Nationally, labor is 56%.
+What would one shower pan cost in Miami?
$850 to $2,750. Pick a different size in the estimator above to get your own number.
+Does shower pan need a permit in Miami?
Often, but rules are set by your city or county building office, so call before you hire. Budget $35 to $570 for fees in the Miami area (our national range of $30 to $500 scaled by the local price level).
+Is Miami expensive for shower pan compared with the rest of Florida?
Miami is 6% above the Florida statewide estimate ($1,700 at the midpoint). We cover 19 metros in Florida; see the state page to compare them.
+What do plumbers, pipefitters and steamfitters earn in Miami?
The BLS median is $27.77 an hour in the Miami area, compared with $30.67 nationally. The 25th to 75th percentile range is $22.86 to $30.75.
+What do basic and premium shower pan work cost in Miami?
For 1 pan, basic work runs $850 to $1,600 and premium work $2,000 to $2,750. Basic means: pre-made acrylic or fiberglass pan. Premium means: custom mud or stone pan.
Shower pan near Miami
Where these numbers come from
Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.