Paver patio cost in Green Bay, WI
Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.
- Typical range (300 sq ft)
- $3,150 – $5,700
- Per sq ft
- $10.50 – $18
- before permit
- Versus US midpoint
- +5%
- US $4,250
- Rank of 300 metros
- #102
- 1 = most expensive
If you want to install a paver patio in Green Bay, plan on $3,150 to $5,700 for 300 sq ft, all in. Per sq ft, that is $10.50 to $18 for materials and labor, with the permit on top. The local midpoint runs 5% higher than the national one. Construction laborers earn a median of $26.39 an hour in the Green Bay area, 16% above the US median of $22.66.
Estimate your paver patio cost
Pick a size, a quality level and where you live. Prices update as you type.
Estimated cost for 300 sq ft in Green Bay, WI, standard level
$3,900 to $4,950
About $12.50 to $15.50 per sq ft before permits. Labor is about 65% of the bill.
| Part | Low | High |
|---|---|---|
| Materials | $1,300 | $1,500 |
| Labor | $2,500 | $3,200 |
| Permits and fees | $100 | $230 |
| Total | $3,900 | $4,950 |
Cost breakdown for 300 sq ft in Green Bay, WI
| Part of the job | Low | Midpoint | High | Share |
|---|---|---|---|---|
| Materials | $1,150 | $1,400 | $1,700 | 32% |
| Labor | $2,000 | $2,850 | $3,700 | 65% |
| Permits and fees | $0 | $160 | $330 | 4% |
| Total | $3,150 | $4,400 | $5,700 | 100% |
Where the Green Bay price comes from
The wage side of the estimate leans on construction laborers, who do 50% of the hours on a typical job. Their local median is $26.39 an hour. Add the other trades involved and the blended wage index for Green Bay is 1.12 (US = 1.00), which puts labor at 65% of the total.
On the materials line, the BEA goods price index for the Green Bay metro is 93.8 (US = 100). The midpoint materials bill for 300 sq ft comes to $1,400, compared with $1,500 at national prices. Permit and inspection fees are scaled by the broader index (93.1) and land at $0 to $330.
Why two Green Bay quotes can differ
Excavation and grading
Digging out is $1-$5 per sq ft; regrading a sloped yard is $0.40-$2.00 per sq ft.
Pattern
Herringbone and curves take longer to lay and waste more stone than a running bond.
Permit
At-grade patios often need no permit; add a retaining wall, a cover, or a connection to the house and that changes.
Related projects, priced for Green Bay
Because every project leans on different trades, Green Bay's wage level does not move all prices equally. Against the US midpoint, concrete driveway runs +8% and wood deck −2%.
| Project | Size | Range | vs. US |
|---|---|---|---|
| Concrete patio | 300 sq ft | $1,250 – $4,200 | +4% |
| Stamped concrete | 400 sq ft | $3,350 – $8,300 | +4% |
| Retaining wall | 200 sq ft of wall face | $7,600 – $13,800 | +4% |
| Wood deck | 300 sq ft | $7,400 – $14,800 | −2% |
| Concrete slab | 400 sq ft | $2,550 – $5,300 | +2% |
| Concrete driveway | 600 sq ft | $3,850 – $9,950 | +8% |
Optional extras in Green Bay
Extras are quoted nationally and then scaled to Green Bay by the average of the local wage index (1.12) and goods index (0.94), a factor of 1.03. Tick any of them in the estimator above to add them to your total. Treat these as planning figures: an add-on touches different trades than the main job, so the scaling is an approximation.
| Add-on | Local range |
|---|---|
| Excavation and haul-away | $310 – $1,550 |
Climate in Green Bay: timing your paver patio job
We use NOAA's 1991-2020 climate normals for Green Bay (5 miles from the city center). These are 30-year monthly averages, not forecasts.
April through October is the stretch where digging, grading and setting material in the ground runs into the fewest weather problems in Green Bay (7 of 12 months). January, February, March, November and December have an average overnight low at or below freezing (32°F).
In January, February, March, November and December the average low is at or below freezing, which means frozen ground and slower digging, compaction and sod or stone placement. NOAA counts about 152 days a year with a low at or below 32°F at this station.
Green Bay gets about 32 inches of precipitation in a normal year, including roughly 56 inches of snow. The wettest months are June, July and August (4.1 inches in June). Inside the workable window, April and October are the driest, at 3.0 and 2.7 inches. The station averages about 6 days a year at 90°F or above.
Does the season change the price? Probably, but we do not have a sourced seasonal price curve, so the estimator shows a year-round figure and does not adjust by month. When you collect quotes, ask whether scheduling in a slower month gets a better rate.
| Month | Avg high °F | Avg low °F | Precip (in) | For this job |
|---|---|---|---|---|
| Jan | 26 | 11 | 1.4 | Cold |
| Feb | 29 | 13 | 1.2 | Cold |
| Mar | 40 | 24 | 2.0 | Cold |
| Apr | 54 | 35 | 3.0 | Workable |
| May | 67 | 46 | 3.4 | Workable |
| Jun | 77 | 56 | 4.1 | Workable |
| Jul | 81 | 60 | 3.6 | Workable |
| Aug | 79 | 58 | 3.4 | Workable |
| Sep | 72 | 50 | 3.2 | Workable |
| Oct | 58 | 40 | 2.7 | Workable |
| Nov | 44 | 29 | 2.0 | Cold |
| Dec | 31 | 18 | 1.8 | Cold |
Pick a size, pick a tier: paver patio pricing in Green Bay
Three bands are cut from the same cited range and localized for Green Bay wages and prices. They overlap on purpose: a good standard job and a modest premium job can cost the same. The grid below prices the same bands at 4 common sizes.
Basic
$3,150 to $4,150
Basic concrete pavers, simple pattern, level yard
Standard
$3,900 to $4,950
Mid-grade pavers, a border or curve, some regrading
Premium
$4,700 to $5,700
Natural stone or clay brick, complex pattern, slope or retaining edge
| Size | Basic | Standard | Premium |
|---|---|---|---|
| 12x12 (144 sq ft) | $1,500 – $2,050 | $1,950 – $2,500 | $2,350 – $2,900 |
| 16x16 (256 sq ft) | $2,700 – $3,550 | $3,350 – $4,250 | $4,000 – $4,900 |
| 20x20 (400 sq ft) | $4,200 – $5,500 | $5,200 – $6,500 | $6,200 – $7,500 |
| pool deck (800 sq ft) | $8,350 – $10,900 | $10,300 – $12,800 | $12,200 – $14,700 |
Green Bay labor market for paver patio
Wages are the part of this estimate that changes most from town to town. 3 trades carry the job here, and each is compared with its US median. The weighted result for Green Bay is 1.12 times the national level.
Construction laborers (47-2061), 50% of the weighting: a median of $26.39 an hour, 16% above the US median of $22.66. The middle half of them earn between $22.53 and $31.63 an hour. About 1,160 work in the metro. That is 66.5 per 10,000 jobs, compared with 70.5 nationally, so the supply of crews looks typical.
Brickmasons and blockmasons (47-2021), 30% of the weighting: a median of $33.64 an hour, 13% above the US median of $29.87. The middle half of them earn between $25.94 and $43.23 an hour. About 70 work in the metro. That is 4.0 per 10,000 jobs, compared with 3.4 nationally, which suggests plenty of local crews to bid.
For landscaping and groundskeeping workers (37-3011, weighted 20%) the local median is $18.72 an hour, which is in line with the national $18.82. The middle half of them earn between $16.53 and $21.91 an hour. BLS counts 930 of them working in the area, 53.3 for every 10,000 jobs (US: 61.3), so the local bench is about average.
Quotes come from real crews, not medians. If the construction laborers on your job are paid at the 75th percentile ($31.63 an hour) instead of the median, the labor line grows by about $290. At the 25th percentile ($22.53) it shrinks by about $220. The total moves by 6.7% or 4.9%, so wages alone rarely explain a quote that is far outside our range.
For context on the local economy, BLS counts 174,550 jobs in the Green Bay area. That makes it the 133rd largest of the 300 metros we cover, with 0.11% of US employment.
| Trade | Weight | 25th pct | Median | 75th pct | US median | Ratio | Level used |
|---|---|---|---|---|---|---|---|
| Construction laborers (47-2061) | 50% | $22.53 | $26.39 | $31.63 | $22.66 | 1.16 | metro |
| Brickmasons and blockmasons (47-2021) | 30% | $25.94 | $33.64 | $43.23 | $29.87 | 1.13 | metro |
| Landscaping and groundskeeping workers (37-3011) | 20% | $16.53 | $18.72 | $21.91 | $18.82 | 0.99 | metro |
| Blended | 100% | 1.12 | |||||
Green Bay against nearby metros and the rest of Wisconsin
Same job, same size (300 sq ft), priced for the nearest metros. Appleton is the priciest of the group at $4,750. Muskegon is the cheapest at $4,100.
| Area | Range | Midpoint | vs. here |
|---|---|---|---|
| Green Bay, WIthis page | $3,150 – $5,700 | $4,400 | |
| Appleton, WI20 miles | $3,350 – $6,100 | $4,750 | +7% |
| Oshkosh, WI45 miles | $3,150 – $5,750 | $4,450 | level |
| Sheboygan, WI50 miles | $3,300 – $5,950 | $4,600 | +4% |
| Wausau, WI90 miles | $3,200 – $5,750 | $4,450 | +1% |
| Muskegon, MI105 miles | $2,900 – $5,300 | $4,100 | −7% |
| Wisconsin (statewide) | $3,300 – $5,950 | $4,600 | +4% |
| United States | $3,000 – $5,450 | $4,250 | −4% |
Across 300 US metros, Green Bay comes in at #102 from the top. The priciest is Kahului, HI at $5,650; the cheapest is Dothan, AL at $3,500 (midpoints, 300 sq ft). Statewide, Green Bay is 4% below the Wisconsin figure.
Other Wisconsin metros
| Metro | Size | Range | Midpoint | vs. here |
|---|---|---|---|---|
| Milwaukee, WI | 820,780 jobs | $3,450 – $6,300 | $4,900 | +11% |
| Madison, WI | 408,070 jobs | $3,350 – $6,100 | $4,700 | +7% |
| Appleton, WI | 124,230 jobs | $3,350 – $6,100 | $4,750 | +7% |
| Oshkosh, WI | 93,750 jobs | $3,150 – $5,750 | $4,450 | level |
| Eau Claire, WI | 86,060 jobs | $3,300 – $6,000 | $4,650 | +5% |
| La Crosse, WI | 84,380 jobs | $3,300 – $6,000 | $4,650 | +5% |
Cities with a workforce like Green Bay's
Big cities and small ones price differently, so here is Green Bay against the 4 metros with the closest total employment.
| Metro | Size | Range | Midpoint | vs. here |
|---|---|---|---|---|
| Reading, PA | 174,670 jobs | $3,100 – $5,650 | $4,350 | −1% |
| Naples, FL | 173,880 jobs | $2,900 – $5,300 | $4,100 | −7% |
| Anchorage, AK | 177,050 jobs | $3,350 – $6,050 | $4,700 | +6% |
| Mobile, AL | 172,550 jobs | $2,600 – $4,750 | $3,700 | −17% |
Get 3 local quotes
Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $3,900 to $4,950 for Green Bay, WI is attached.
A detailed PDF report of this estimate, $9
Multi-page report for Green Bay, WI: low, typical and high cost, a line-item breakdown of materials and labor by trade, permit notes, the best months to schedule, a quote comparison sheet, red flags, questions for contractors, checklists and every source. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.
Paver patio in Green Bay: your questions
+How much does it cost to install a paver patio in Green Bay?
For 300 sq ft, expect $3,150 to $5,700 in the Green Bay area. A standard-spec job lands at $3,900 to $4,950. Small jobs usually cost more per sq ft and large ones less.
+What is the price per sq ft for paver patio in Green Bay?
About $10.50 to $18 per sq ft for materials and labor, plus $0 to $330 for the permit if one is needed. The US range is $10 to $17.
+Is paver patio cheaper in Green Bay or Appleton?
Appleton is 20 miles away. The midpoint for 300 sq ft there is $4,750, which is 7% more than Green Bay ($4,400). Wage and materials indexes both feed that gap.
+How much of the bill is labor in Green Bay?
About 65% at the midpoint, or $2,850 out of $4,400. Materials are 32% and permits 4%. Nationally, labor is 60%.
+What would 20x20 (400 sq ft) cost in Green Bay?
$4,200 to $7,500. Pick a different size in the estimator above to get your own number.
+Does paver patio need a permit in Green Bay?
Often, but rules are set by your city or county building office, so call before you hire. Budget $0 to $330 for fees in the Green Bay area (our national range of $0 to $350 scaled by the local price level).
+Is Green Bay expensive for paver patio compared with the rest of Wisconsin?
Green Bay is 4% below the Wisconsin statewide estimate ($4,600 at the midpoint). We cover 12 metros in Wisconsin; see the state page to compare them.
+What do construction laborers earn in Green Bay?
The BLS median is $26.39 an hour in the Green Bay area, compared with $22.66 nationally. The 25th to 75th percentile range is $22.53 to $31.63.
+What do basic and premium paver patio work cost in Green Bay?
For 300 sq ft, basic work runs $3,150 to $4,150 and premium work $4,700 to $5,700. Basic means: basic concrete pavers, simple pattern, level yard. Premium means: natural stone or clay brick, complex pattern, slope or retaining edge.
+When is the best time to install a paver patio in Green Bay?
Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are April through October. April and October are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.
+What does "excavation and haul-away" add in Green Bay?
$310 to $1,550 for 300 sq ft, from a national range scaled by the local wage and goods indexes.
Paver patio near Green Bay
Where these numbers come from
Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.
- HomeGuide: 2026 Paver Patio Cost | Paver Installation Costs (accessed November 4, 2026)
- HomeGuide: How Much Does Stamped Concrete Cost? (2026) (accessed November 4, 2026)
- HomeGuide: 2026 Building Permit Costs | Fees & Cost Calculator (accessed November 4, 2026)
- BLS Occupational Employment and Wage Statistics, May 2025
- BEA Regional Price Parities, 2024
- NOAA NCEI U.S. Climate Normals, 1991-2020