Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.

Typical range (450 sq ft)
$31,900 – $99,700
Per sq ft
$70.50 – $221
before permit
Versus US midpoint
−12%
US $74,500
Rank of 300 metros
#266
1 = most expensive

Local price for an inground pool in the Roanoke area: $31,900 to $99,700 for 450 sq ft. The low end is a basic job on easy ground; the high end is a premium spec with harder access. The midpoint runs 12% lower than the US figure. Construction laborers earn a median of $18.34 an hour in the Roanoke area, 19% below the US median of $22.66.

Estimate your inground pool cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

Fiberglass pool, standard size

Estimated cost for 450 sq ft in Roanoke, VA, standard level

$52,200 to $79,400

About $116 to $176 per sq ft before permits. Labor is about 47% of the bill.

Cost breakdown
PartLowHigh
Materials$27,300$41,500
Labor$24,800$37,600
Permits and fees$150$220
Total$52,200$79,400
Save and get a PDF report

Cost breakdown for 450 sq ft in Roanoke, VA

Part of the jobLowMidpointHighShare
Materials$16,500$34,400$52,30052%
Labor$15,200$31,200$47,20047%
Permits and fees$95$190$2800%
Total$31,900$65,800$99,700100%

Why Roanoke prices look the way they do

Labor is 47% of the midpoint bill here, against 52% nationally. The mix of trades behind this job is construction laborers (40%), operating engineers and other construction equipment operators (30%), brickmasons and blockmasons (20%), plumbers, pipefitters and steamfitters (10%). We weight each trade's local median wage by that share and compare it with the national median. In Roanoke the blended ratio comes out at 0.81.

Materials are scaled with BEA's regional price parity for goods. Roanoke is at 96.8 against 100 for the US, so a materials line of $35,600 nationally becomes $34,400 here (midpoint, 450 sq ft). Permits follow the all-items index of 93.6: $95 to $280.

How Roanoke compares

Same job, same size (450 sq ft), priced for the nearest metros. Charlottesville is the priciest of the group at $71,000.

Comparison with nearby areas
AreaRangeMidpointvs. here
Roanoke, VAthis page$31,900 – $99,700$65,800
Blacksburg, VA35 miles$33,000 – $103,000$68,000+3%
Lynchburg, VA40 miles$32,400 – $101,500$66,900+2%
Winston, NC85 miles$32,300 – $101,000$66,600+1%
Charlottesville, VA85 miles$34,400 – $107,500$71,000+8%
Greensboro, NC90 miles$32,500 – $101,500$67,000+2%
Virginia (statewide)$34,800 – $108,500$71,800+9%
United States$36,100 – $113,000$74,500+13%

Out of the 300 metros we cover, Roanoke ranks #266 for the cost of this job (#1 is the most expensive). Statewide, Roanoke is 8% below the Virginia figure.

Elsewhere in Virginia

Virginia metros compared with Roanoke
MetroSizeRangeMidpointvs. here
Virginia Beach, VA763,060 jobs$32,700 – $102,000$67,400+2%
Richmond, VA660,350 jobs$33,700 – $105,000$69,400+6%
Charlottesville, VA114,780 jobs$34,400 – $107,500$71,000+8%
Lynchburg, VA97,190 jobs$32,400 – $101,500$66,900+2%
Blacksburg, VA74,070 jobs$33,000 – $103,000$68,000+3%
Winchester, VA67,740 jobs$33,200 – $104,000$68,600+4%

Metros of a similar size

Big cities and small ones price differently, so here is Roanoke against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
Hickory, NC154,090 jobs$32,800 – $102,500$67,700+3%
Gainesville, FL152,670 jobs$32,500 – $101,500$67,100+2%
Brownsville, TX157,450 jobs$30,400 – $95,000$62,700−5%
Killeen, TX150,580 jobs$31,800 – $99,400$65,600level

Who does the work: Roanoke trade wages

The labor line is built from BLS wage data, one trade at a time. This job draws on 4 trades. We compare each trade's local median with the US median, weight the ratios by how much of the job each trade does, and apply the blend to the national labor cost. For Roanoke the blend is 0.81.

For construction laborers (47-2061, weighted 40%) the local median is $18.34 an hour, which is 19% below the national $22.66. The middle half of them earn between $17.27 and $21.31 an hour. BLS counts 1,210 of them working in the area, 78.6 for every 10,000 jobs (US: 70.5), so the local bench is about average.

Operating engineers and other construction equipment operators (47-2073), 30% of the weighting: a median of $23.56 an hour, 18% below the US median of $28.78. The middle half of them earn between $22.03 and $27.91 an hour. About 480 work in the metro. That is 31.2 per 10,000 jobs, compared with 30.7 nationally, so the supply of crews looks typical.

For brickmasons and blockmasons (47-2021, weighted 20%) the local median is $23.30 an hour, which is 22% below the national $29.87. The middle half of them earn between $18.61 and $25.57 an hour. BLS counts 70 of them working in the area, 4.5 for every 10,000 jobs (US: 3.4), so the local bench is deeper than average.

Plumbers, pipefitters and steamfitters (47-2152), 10% of the weighting: a median of $24.86 an hour, 19% below the US median of $30.67. The middle half of them earn between $21.88 and $29.53 an hour. About 560 work in the metro. That is 36.4 per 10,000 jobs, compared with 30.0 nationally, which suggests plenty of local crews to bid.

A quick sensitivity check: moving the lead trade (construction laborers) from the median to the 75th percentile wage adds about $2,050 to the midpoint estimate; the 25th percentile takes off about $730. That is a swing of roughly 1.1% to 3.1% of the total, which is useful for judging whether a bid reflects wages or something else, such as scope or margin.

Roanoke has 153,980 jobs in total (BLS, May 2025), ranking 153rd by size among the 300 metros on this site.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Construction laborers (47-2061)40%$17.27$18.34$21.31$22.660.81metro
Operating engineers and other construction equipment operators (47-2073)30%$22.03$23.56$27.91$28.780.82metro
Brickmasons and blockmasons (47-2021)20%$18.61$23.30$25.57$29.870.78metro
Plumbers, pipefitters and steamfitters (47-2152)10%$21.88$24.86$29.53$30.670.81metro
Blended100%0.81

Cost by quality level and size in Roanoke

The cited range is split into basic, standard and premium bands, then scaled to Roanoke. Bands overlap, because plenty of standard jobs cost as much as a light premium one. Sizes run from small pool (400 sq ft) to large (800 sq ft).

Basic

$31,900 to $59,000

Vinyl-liner pool, small size

Standard

$52,200 to $79,400

Fiberglass pool, standard size

Premium

$72,600 to $99,700

Concrete or gunite, large with custom features

Cost by size and quality level
SizeBasicStandardPremium
small pool (400 sq ft)$28,400 – $52,500$46,400 – $70,600$64,500 – $88,700
average (512 sq ft)$36,300 – $67,100$59,400 – $90,300$82,600 – $113,500
large (800 sq ft)$56,600 – $105,000$92,700 – $141,000$129,000 – $177,000

Related projects, priced for Roanoke

Jobs that often go together with inground pool are priced below at their usual sizes, using the same Roanoke wage and price inputs. Compared with national midpoints, French drain comes out highest (−9%) and paver patio lowest (−12%); the gap comes from the trades each job uses.

Related projects with local prices
ProjectSizeRangevs. US
Aluminum fence150 linear ft$3,400 – $10,300−10%
Paver patio300 sq ft$2,650 – $4,750−12%
Concrete patio300 sq ft$1,150 – $3,600−10%
Wood deck300 sq ft$6,700 – $13,400−11%
French drain60 linear ft$540 – $1,900−9%
Retaining wall200 sq ft of wall face$6,100 – $12,100−11%

The best months for inground pool in Roanoke

Climate numbers on this page come from NOAA's 1991-2020 U.S. Climate Normals at the nearest suitable station, Roanoke Rgnl Ap (5 miles from the city center). They are 30-year averages, so any one year can run hotter, colder or wetter.

For pouring concrete, the comfortable months in Roanoke are April through October: 7 of 12. Outside them, January, February, March, November and December have an average overnight low of 40°F or below.

The 40°F line is a deliberately cautious stand-in. The American Concrete Institute's cold-weather guide (ACI 306R-16) defines cold-weather concreting around an average daily air temperature below 40°F, which is colder than our test of an average overnight low at or below 40°F, so we flag a few extra shoulder months. In cold weather crews may need heated enclosures, insulating blankets or accelerated mixes, and those measures can raise a quote.

Roanoke gets about 43 inches of precipitation in a normal year, including roughly 15 inches of snow. The wettest months are May, June and July (4.7 inches in June). Inside the workable window, August and October are the driest, at 3.4 and 3.0 inches. The station averages about 30 days a year at 90°F or above.

We do not adjust the estimate by month, because we have no reliable published data on seasonal pricing. It is still worth asking contractors whether an off-peak start date changes their bid.

Monthly normals, Roanoke Rgnl Ap (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan47293.2Cold
Feb51312.9Cold
Mar59383.5Cold
Apr70463.5Workable
May77554.3Workable
Jun84634.7Workable
Jul88674.3Workable
Aug87663.4Workable
Sep80594.1Workable
Oct70483.0Workable
Nov59383.0Cold
Dec50323.1Cold

Why two Roanoke quotes can differ

  • Pool type

    Vinyl pools are $25,000-$65,000, fiberglass $45,000-$100,000, and concrete or gunite $50,000-$120,000 (HomeGuide).

  • Maintenance

    Pool maintenance is $80-$150 a month; concrete pools also need an acid wash every 3-5 years at $300-$1,000.

  • Permit

    A building permit for a pool is $100-$300 and contractors often include it. Many cities add plumbing and electrical permits.

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $52,200 to $79,400 for Roanoke, VA is attached.

Take this estimate with you: PDF report, $9

Multi-page report for Roanoke, VA: low, typical and high cost, a line-item breakdown of materials and labor by trade, permit notes, the best months to schedule, a quote comparison sheet, red flags, questions for contractors, checklists and every source. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Inground pool in Roanoke: your questions

+How much does it cost to install an inground pool in Roanoke?

For 450 sq ft, expect $31,900 to $99,700 in the Roanoke area. A standard-spec job lands at $52,200 to $79,400. Small jobs usually cost more per sq ft and large ones less.

+What is the price per sq ft for inground pool in Roanoke?

About $70.50 to $221 per sq ft for materials and labor, plus $95 to $280 for the permit if one is needed. The US range is $80 to $250.

+Is inground pool cheaper in Roanoke or Blacksburg?

Blacksburg is 35 miles away. The midpoint for 450 sq ft there is $68,000, which is 3% more than Roanoke ($65,800). Wage and materials indexes both feed that gap.

+How much of the bill is labor in Roanoke?

About 47% at the midpoint, or $31,200 out of $65,800. Materials are 52% and permits 0%. Nationally, labor is 52%.

+What would average (512 sq ft) cost in Roanoke?

$36,300 to $113,500. Pick a different size in the estimator above to get your own number.

+Does inground pool need a permit in Roanoke?

Often, but rules are set by your city or county building office, so call before you hire. Budget $95 to $280 for fees in the Roanoke area (our national range of $100 to $300 scaled by the local price level).

+Is Roanoke expensive for inground pool compared with the rest of Virginia?

Roanoke is 8% below the Virginia statewide estimate ($71,800 at the midpoint). We cover 8 metros in Virginia; see the state page to compare them.

+What do construction laborers earn in Roanoke?

The BLS median is $18.34 an hour in the Roanoke area, compared with $22.66 nationally. The 25th to 75th percentile range is $17.27 to $21.31.

+What do basic and premium inground pool work cost in Roanoke?

For 450 sq ft, basic work runs $31,900 to $59,000 and premium work $72,600 to $99,700. Basic means: vinyl-liner pool, small size. Premium means: concrete or gunite, large with custom features.

+When is the best time to install an inground pool in Roanoke?

Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are April through October. August and October are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.

Inground pool near Roanoke

Inground pool: all pricesInground pool in VirginiaAll projects in RoanokeVirginia cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.

Note on derived figures: Materials = 48% of the installed price, from Cost to Renovate's mid-range 'Outdoor Living' category split. It is a category average, not a pool-specific one, so read the pool materials line loosely.