Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.

Typical range (400 sq ft)
$2,850 – $5,900
Per sq ft
$6.95 – $13.50
before permit
Versus US midpoint
+14%
US $3,850
Rank of 300 metros
#14
1 = most expensive

Minneapolis homeowners pay roughly $2,850 to $5,900 to pour a concrete slab at 400 sq ft, or $6.95 to $13.50 per sq ft (permit not included). Against the US midpoint, Minneapolis is 14% higher. Cement masons and concrete finishers earn a median of $34.98 an hour in the Minneapolis area, 28% above the US median of $27.41.

Estimate your concrete slab cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

4-5 inch slab with rebar or heavier mesh and standard base prep

Add-ons

Estimated cost for 400 sq ft in Minneapolis, MN, standard level

$3,750 to $5,000

About $9 to $11.50 per sq ft before permits. Labor is about 47% of the bill.

Cost breakdown
PartLowHigh
Materials$1,750$2,400
Labor$1,850$2,300
Permits and fees$160$310
Total$3,750$5,000
Save and get a PDF report

Cost breakdown for 400 sq ft in Minneapolis, MN

Part of the jobLowMidpointHighShare
Materials$1,250$2,050$2,90047%
Labor$1,550$2,050$2,60047%
Permits and fees$50$240$4205%
Total$2,850$4,350$5,900100%

What is behind the Minneapolis number

Labor is 47% of the midpoint bill here, against 42% nationally. The mix of trades behind this job is cement masons and concrete finishers (50%), construction laborers (30%), operating engineers and other construction equipment operators (10%), carpenters (10%). We weight each trade's local median wage by that share and compare it with the national median. In Minneapolis the blended ratio comes out at 1.29.

On the materials line, the BEA goods price index for the Minneapolis metro is 103.1 (US = 100). The midpoint materials bill for 400 sq ft comes to $2,050, compared with $2,000 at national prices. Permit and inspection fees are scaled by the broader index (104.8) and land at $50 to $420.

Cost by quality level and size in Minneapolis

Three bands are cut from the same cited range and localized for Minneapolis wages and prices. They overlap on purpose: a good standard job and a modest premium job can cost the same. The grid below prices the same bands at 5 common sizes.

Basic

$2,850 to $4,050

4-inch broom-finish slab, light mesh, easy truck access

Standard

$3,750 to $5,000

4-5 inch slab with rebar or heavier mesh and standard base prep

Premium

$4,650 to $5,900

6-inch slab, heavy reinforcement, thick base, pump truck or tight access

Cost by size and quality level
SizeBasicStandardPremium
10x10 pad (100 sq ft)$750 – $1,150$1,050 – $1,500$1,350 – $1,800
12x12 (144 sq ft)$1,050 – $1,600$1,450 – $2,000$1,850 – $2,400
20x20 (400 sq ft)$2,850 – $4,050$3,750 – $5,000$4,650 – $5,900
24x24 garage floor (576 sq ft)$4,050 – $5,750$5,350 – $7,050$6,600 – $8,300
30x40 foundation (1,200 sq ft)$8,400 – $11,800$10,900 – $14,300$13,500 – $16,800

What nearby projects cost in Minneapolis

Because every project leans on different trades, Minneapolis's wage level does not move all prices equally. Against the US midpoint, concrete driveway runs +21% and detached garage +15%.

Related projects with local prices
ProjectSizeRangevs. US
Concrete driveway600 sq ft$4,350 – $11,200+21%
Concrete patio300 sq ft$1,400 – $4,700+17%
Detached garage576 sq ft$33,300 – $66,800+15%
Stamped concrete400 sq ft$3,750 – $9,250+16%
Asphalt driveway600 sq ft$3,450 – $8,650+16%
Gravel driveway1,000 sq ft$3,000 – $12,100+19%

Why two Minneapolis quotes can differ

  • Base and reinforcement

    A compacted gravel base, vapor barrier, and wire mesh or rebar are priced separately by some contractors and bundled by others. Ask which one your quote does.

  • Truck and pump access

    If the mixer truck can't back up to the forms, someone has to wheelbarrow it in or hire a pump. Pump or line-pump hire is typically billed per day.

  • Small-job minimums

    Many crews have a minimum charge, so a 10x10 pad can cost more per square foot than a 20x20 slab.

Extras that change the Minneapolis total

Extras are quoted nationally and then scaled to Minneapolis by the average of the local wage index (1.29) and goods index (1.03), a factor of 1.16. Tick any of them in the estimator above to add them to your total. Treat these as planning figures: an add-on touches different trades than the main job, so the scaling is an approximation.

Add-on prices
Add-onLocal range
Add rebar reinforcement$460 – $1,400
Remove old concrete first$930 – $2,800

When to schedule concrete slab in Minneapolis

We use NOAA's 1991-2020 climate normals for Lower St Anthony Falls (in the city). These are 30-year monthly averages, not forecasts.

May through October is the stretch where pouring concrete runs into the fewest weather problems in Minneapolis (6 of 12 months). January, February, March, April, November and December have an average overnight low of 40°F or below.

The 40°F line is a deliberately cautious stand-in. The American Concrete Institute's cold-weather guide (ACI 306R-16) defines cold-weather concreting around an average daily air temperature below 40°F, which is colder than our test of an average overnight low at or below 40°F, so we flag a few extra shoulder months. In cold weather crews may need heated enclosures, insulating blankets or accelerated mixes, and those measures can raise a quote.

Minneapolis gets about 34 inches of precipitation in a normal year. The wettest months are June, July and August (4.8 inches in June). Inside the workable window, September and October are the driest, at 3.4 and 3.0 inches. The station averages about 18 days a year at 90°F or above.

Does the season change the price? Probably, but we do not have a sourced seasonal price curve, so the estimator shows a year-round figure and does not adjust by month. When you collect quotes, ask whether scheduling in a slower month gets a better rate.

Monthly normals, Lower St Anthony Falls (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan2280.9Cold
Feb27120.9Cold
Mar40241.6Cold
Apr55363.3Cold
May69494.3Workable
Jun79594.8Workable
Jul83644.6Workable
Aug80624.5Workable
Sep72543.4Workable
Oct56413.0Workable
Nov40271.7Cold
Dec27151.3Cold

Minneapolis against nearby metros and the rest of Minnesota

Of the five closest metros, all are cheaper than Minneapolis. La Crosse is the lowest at about $3,900 (midpoint, 400 sq ft), 145 miles away.

Comparison with nearby areas
AreaRangeMidpointvs. here
Minneapolis, MNthis page$2,850 – $5,900$4,350
St. Cloud, MN70 miles$2,550 – $5,300$3,900−10%
Rochester, MN90 miles$2,700 – $5,550$4,100−6%
Eau Claire, WI100 miles$2,550 – $5,250$3,900−11%
La Crosse, WI145 miles$2,500 – $5,250$3,900−11%
Duluth, MN160 miles$2,650 – $5,500$4,100−7%
Minnesota (statewide)$2,700 – $5,650$4,150−5%
United States$2,450 – $5,200$3,850−12%

Across 300 US metros, Minneapolis comes in at #14 from the top. The priciest is Kahului, HI at $5,300; the cheapest is McAllen, TX at $3,200 (midpoints, 400 sq ft). Statewide, Minneapolis is 5% above the Minnesota figure.

Other Minnesota metros

Minnesota metros compared with Minneapolis
MetroSizeRangeMidpointvs. here
Duluth, MN124,710 jobs$2,650 – $5,500$4,100−7%
Rochester, MN122,980 jobs$2,700 – $5,550$4,100−6%
St. Cloud, MN103,920 jobs$2,550 – $5,300$3,900−10%

Cities with a workforce like Minneapolis's

Big cities and small ones price differently, so here is Minneapolis against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
Seattle, WA2,086,210 jobs$2,950 – $6,100$4,550+4%
Detroit, MI1,904,530 jobs$2,600 – $5,450$4,000−8%
San Francisco, CA2,373,920 jobs$3,150 – $6,450$4,800+10%
Riverside, CA1,716,760 jobs$2,650 – $5,550$4,100−6%

Local wages behind the labor line

Wages are the part of this estimate that changes most from town to town. 4 trades carry the job here, and each is compared with its US median. The weighted result for Minneapolis is 1.29 times the national level.

For cement masons and concrete finishers (47-2051, weighted 50%) the local median is $34.98 an hour, which is 28% above the national $27.41. The middle half of them earn between $30.37 and $42.72 an hour. BLS counts 1,880 of them working in the area, 9.6 for every 10,000 jobs (US: 13.3), so the local bench is thinner than average.

Construction laborers (47-2061), 30% of the weighting: a median of $29.79 an hour, 31% above the US median of $22.66. The middle half of them earn between $24.17 and $40.14 an hour. About 17,330 work in the metro. That is 88.8 per 10,000 jobs, compared with 70.5 nationally, which suggests plenty of local crews to bid.

For operating engineers and other construction equipment operators (47-2073, weighted 10%) the local median is $40.07 an hour, which is 39% above the national $28.78. The middle half of them earn between $33.65 and $48.47 an hour. BLS counts 4,270 of them working in the area, 21.9 for every 10,000 jobs (US: 30.7), so the local bench is thinner than average.

For carpenters (47-2031, weighted 10%) the local median is $35.61 an hour, which is 22% above the national $29.12. The middle half of them earn between $29.12 and $44.60 an hour. BLS counts 10,200 of them working in the area, 52.3 for every 10,000 jobs (US: 43.1), so the local bench is deeper than average.

Quotes come from real crews, not medians. If the cement masons and concrete finishers on your job are paid at the 75th percentile ($42.72 an hour) instead of the median, the labor line grows by about $230. At the 25th percentile ($30.37) it shrinks by about $130. The total moves by 5.2% or 3.1%, so wages alone rarely explain a quote that is far outside our range.

For context on the local economy, BLS counts 1,951,650 jobs in the Minneapolis-St. Paul-Bloomington area. That makes it the 14th largest of the 300 metros we cover, with 1.26% of US employment.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Cement masons and concrete finishers (47-2051)50%$30.37$34.98$42.72$27.411.28metro
Construction laborers (47-2061)30%$24.17$29.79$40.14$22.661.31metro
Operating engineers and other construction equipment operators (47-2073)10%$33.65$40.07$48.47$28.781.39metro
Carpenters (47-2031)10%$29.12$35.61$44.60$29.121.22metro
Blended100%1.29

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $3,750 to $5,000 for Minneapolis, MN is attached.

Take this estimate with you: PDF report, $9

The report lays out the concrete slab numbers for Minneapolis, MN line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Concrete slab in Minneapolis: your questions

+How much does it cost to pour a concrete slab in Minneapolis?

For 400 sq ft, expect $2,850 to $5,900 in the Minneapolis area. A standard-spec job lands at $3,750 to $5,000. Small jobs usually cost more per sq ft and large ones less.

+What is the price per sq ft for concrete slab in Minneapolis?

About $6.95 to $13.50 per sq ft for materials and labor, plus $50 to $420 for the permit if one is needed. The US range is $6 to $12.

+Is concrete slab cheaper in Minneapolis or St. Cloud?

St. Cloud is 70 miles away. The midpoint for 400 sq ft there is $3,900, which is 10% less than Minneapolis ($4,350). Wage and materials indexes both feed that gap.

+How much of the bill is labor in Minneapolis?

About 47% at the midpoint, or $2,050 out of $4,350. Materials are 47% and permits 5%. Nationally, labor is 42%.

+What would 20x20 (400 sq ft) cost in Minneapolis?

$2,850 to $5,900. Pick a different size in the estimator above to get your own number.

+Does concrete slab need a permit in Minneapolis?

Often, but rules are set by your city or county building office, so call before you hire. Budget $50 to $420 for fees in the Minneapolis area (our national range of $50 to $400 scaled by the local price level).

+Is Minneapolis expensive for concrete slab compared with the rest of Minnesota?

Minneapolis is 5% above the Minnesota statewide estimate ($4,150 at the midpoint). We cover 4 metros in Minnesota; see the state page to compare them.

+What do cement masons and concrete finishers earn in Minneapolis?

The BLS median is $34.98 an hour in the Minneapolis area, compared with $27.41 nationally. The 25th to 75th percentile range is $30.37 to $42.72.

+What do basic and premium concrete slab work cost in Minneapolis?

For 400 sq ft, basic work runs $2,850 to $4,050 and premium work $4,650 to $5,900. Basic means: 4-inch broom-finish slab, light mesh, easy truck access. Premium means: 6-inch slab, heavy reinforcement, thick base, pump truck or tight access.

+When is the best time to pour a concrete slab in Minneapolis?

Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are May through October. September and October are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.

+What does "add rebar reinforcement" add in Minneapolis?

$460 to $1,400 for 400 sq ft, from a national range scaled by the local wage and goods indexes.

Concrete slab near Minneapolis

Concrete slab: all pricesConcrete slab in MinnesotaAll projects in MinneapolisMinnesota cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.