Concrete slab cost in Bangor, ME

Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.

Typical range (400 sq ft)
$2,250 – $4,800
Per sq ft
$5.50 – $11
before permit
Versus US midpoint
−8%
US $3,850
Rank of 300 metros
#206
1 = most expensive

Local price for a concrete slab in the Bangor area: $2,250 to $4,800 for 400 sq ft. The low end is a basic job on easy ground; the high end is a premium spec with harder access. The midpoint runs 8% lower than the US figure. Cement masons and concrete finishers earn a median of $21.56 an hour in the Bangor area, 21% below the US median of $27.41.

Estimate your concrete slab cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

4-5 inch slab with rebar or heavier mesh and standard base prep

Add-ons

Estimated cost for 400 sq ft in Bangor, ME, standard level

$3,000 to $4,050

About $7.15 to $9.40 per sq ft before permits. Labor is about 39% of the bill.

Cost breakdown
PartLowHigh
Materials$1,650$2,250
Labor$1,250$1,500
Permits and fees$150$280
Total$3,000$4,050
Save and get a PDF report

Cost breakdown for 400 sq ft in Bangor, ME

Part of the jobLowMidpointHighShare
Materials$1,150$1,950$2,70055%
Labor$1,050$1,350$1,70039%
Permits and fees$50$220$3906%
Total$2,250$3,550$4,800100%

Why Bangor prices look the way they do

We price the labor side from BLS wage data for 4 trades: cement masons and concrete finishers at 50%, construction laborers at 30%, operating engineers and other construction equipment operators at 10%, carpenters at 10%. Weighted together, Bangor wages are 0.86 times the national level. Labor makes up about 39% of the midpoint estimate (42% at national prices).

Materials are scaled with BEA's regional price parity for goods. Bangor is at 97.2 against 100 for the US, so a materials line of $2,000 nationally becomes $1,950 here (midpoint, 400 sq ft). Permits follow the all-items index of 96.5: $50 to $390.

Who does the work: Bangor trade wages

The labor line is built from BLS wage data, one trade at a time. This job draws on 4 trades. We compare each trade's local median with the US median, weight the ratios by how much of the job each trade does, and apply the blend to the national labor cost. For Bangor the blend is 0.86.

Cement masons and concrete finishers (47-2051), 50% of the weighting: a median of $21.56 an hour, 21% below the US median of $27.41. The middle half of them earn between $17.90 and $24.52 an hour. About 110 work in the metro. That is 15.2 per 10,000 jobs, compared with 13.3 nationally, so the supply of crews looks typical.

For construction laborers (47-2061, weighted 30%) the local median is $21.35 an hour, which is 6% below the national $22.66. The middle half of them earn between $18.60 and $22.35 an hour. BLS counts 530 of them working in the area, 73.3 for every 10,000 jobs (US: 70.5), so the local bench is about average.

Operating engineers and other construction equipment operators (47-2073), 10% of the weighting: a median of $25.00 an hour, 13% below the US median of $28.78. The middle half of them earn between $22.23 and $28.94 an hour. About 310 work in the metro. That is 42.9 per 10,000 jobs, compared with 30.7 nationally, which suggests plenty of local crews to bid.

Carpenters (47-2031), 10% of the weighting: a median of $27.45 an hour, 6% below the US median of $29.12. The middle half of them earn between $23.29 and $30.70 an hour. About 430 work in the metro. That is 59.5 per 10,000 jobs, compared with 43.1 nationally, which suggests plenty of local crews to bid.

A quick sensitivity check: moving the lead trade (cement masons and concrete finishers) from the median to the 75th percentile wage adds about $85 to the midpoint estimate; the 25th percentile takes off about $110. That is a swing of roughly 3.0% to 2.4% of the total, which is useful for judging whether a bid reflects wages or something else, such as scope or margin.

Bangor has 72,270 jobs in total (BLS, May 2025), ranking 255th by size among the 300 metros on this site.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Cement masons and concrete finishers (47-2051)50%$17.90$21.56$24.52$27.410.79metro
Construction laborers (47-2061)30%$18.60$21.35$22.35$22.660.94metro
Operating engineers and other construction equipment operators (47-2073)10%$22.23$25.00$28.94$28.780.87metro
Carpenters (47-2031)10%$23.29$27.45$30.70$29.120.94metro
Blended100%0.86

The best months for concrete slab in Bangor

Climate numbers on this page come from NOAA's 1991-2020 U.S. Climate Normals at the nearest suitable station, Bangor Intl Ap (5 miles from the city center). They are 30-year averages, so any one year can run hotter, colder or wetter.

For pouring concrete, the comfortable months in Bangor are May through September: 5 of 12. Outside them, January, February, March, April, October, November and December have an average overnight low of 40°F or below.

The 40°F line is a deliberately cautious stand-in. The American Concrete Institute's cold-weather guide (ACI 306R-16) defines cold-weather concreting around an average daily air temperature below 40°F, which is colder than our test of an average overnight low at or below 40°F, so we flag a few extra shoulder months. In cold weather crews may need heated enclosures, insulating blankets or accelerated mixes, and those measures can raise a quote.

Bangor gets about 42 inches of precipitation in a normal year, including roughly 75 inches of snow. The wettest months are June, October and November (4.6 inches in October). Inside the workable window, July and August are the driest, at 3.2 and 3.1 inches. The station averages about 6 days a year at 90°F or above.

We do not adjust the estimate by month, because we have no reliable published data on seasonal pricing. It is still worth asking contractors whether an off-peak start date changes their bid.

Monthly normals, Bangor Intl Ap (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan2893.2Cold
Feb31112.4Cold
Mar40213.2Cold
Apr53323.6Cold
May66433.3Workable
Jun75533.9Workable
Jul80593.2Workable
Aug79573.1Workable
Sep71493.8Workable
Oct58384.6Cold
Nov46293.8Cold
Dec35173.7Cold

Specs and site conditions that change a Bangor bid

  • Truck and pump access

    If the mixer truck can't back up to the forms, someone has to wheelbarrow it in or hire a pump. Pump or line-pump hire is typically billed per day.

  • Small-job minimums

    Many crews have a minimum charge, so a 10x10 pad can cost more per square foot than a 20x20 slab.

  • Finish

    A broom finish is the baseline. Stamped, stained, or exposed-aggregate finishes are priced as add-ons on top of the slab.

Pick a size, pick a tier: concrete slab pricing in Bangor

The cited range is split into basic, standard and premium bands, then scaled to Bangor. Bands overlap, because plenty of standard jobs cost as much as a light premium one. Sizes run from 10x10 pad (100 sq ft) to 30x40 foundation (1,200 sq ft).

Basic

$2,250 to $3,250

4-inch broom-finish slab, light mesh, easy truck access

Standard

$3,000 to $4,050

4-5 inch slab with rebar or heavier mesh and standard base prep

Premium

$3,800 to $4,800

6-inch slab, heavy reinforcement, thick base, pump truck or tight access

Cost by size and quality level
SizeBasicStandardPremium
10x10 pad (100 sq ft)$600 – $960$870 – $1,250$1,150 – $1,500
12x12 (144 sq ft)$840 – $1,300$1,200 – $1,650$1,500 – $2,000
20x20 (400 sq ft)$2,250 – $3,250$3,000 – $4,050$3,800 – $4,800
24x24 garage floor (576 sq ft)$3,200 – $4,650$4,300 – $5,700$5,350 – $6,750
30x40 foundation (1,200 sq ft)$6,650 – $9,450$8,750 – $11,600$10,900 – $13,700

Related projects, priced for Bangor

Jobs that often go together with concrete slab are priced below at their usual sizes, using the same Bangor wage and price inputs. Compared with national midpoints, asphalt driveway comes out highest (−3%) and concrete driveway lowest (−11%); the gap comes from the trades each job uses.

Related projects with local prices
ProjectSizeRangevs. US
Concrete driveway600 sq ft$3,300 – $8,200−11%
Concrete patio300 sq ft$1,150 – $3,650−9%
Detached garage576 sq ft$27,400 – $54,900−6%
Stamped concrete400 sq ft$3,000 – $7,200−9%
Asphalt driveway600 sq ft$2,950 – $7,200−3%
Gravel driveway1,000 sq ft$2,350 – $9,600−6%

Optional extras in Bangor

Add-ons start from national price ranges and are scaled by 0.91 for Bangor, which is the average of the area's wage index (0.86) and goods price index (0.97). The estimator above can add them to your total.

Add-on prices
Add-onLocal range
Add rebar reinforcement$370 – $1,100
Remove old concrete first$730 – $2,200

Is Bangor cheap or dear? The local comparison

Same job, same size (400 sq ft), priced for the nearest metros. Boston is the priciest of the group at $4,150.

Comparison with nearby areas
AreaRangeMidpointvs. here
Bangor, MEthis page$2,250 – $4,800$3,550
Portland, ME150 miles$2,500 – $5,250$3,850+10%
Burlington, VT220 miles$2,500 – $5,250$3,900+10%
Manchester, NH230 miles$2,450 – $5,150$3,800+8%
Boston, MA230 miles$2,700 – $5,650$4,150+18%
Barnstable, MA265 miles$2,650 – $5,450$4,050+15%
Maine (statewide)$2,400 – $5,050$3,750+6%
United States$2,450 – $5,200$3,850+8%

Out of the 300 metros we cover, Bangor ranks #206 for the cost of this job (#1 is the most expensive). Statewide, Bangor is 5% below the Maine figure.

Elsewhere in Maine

Maine metros compared with Bangor
MetroSizeRangeMidpointvs. here
Portland, ME288,480 jobs$2,500 – $5,250$3,850+10%

Metros of a similar size

Big cities and small ones price differently, so here is Bangor against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
Coeur d'Alene, ID72,280 jobs$2,450 – $5,150$3,800+7%
Bozeman, MT72,210 jobs$2,550 – $5,350$3,950+12%
Prescott Valley, AZ72,300 jobs$2,300 – $4,950$3,600+3%
Redding, CA71,550 jobs$2,700 – $5,650$4,150+18%

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $3,000 to $4,050 for Bangor, ME is attached.

A detailed PDF report of this estimate, $9

The report lays out the concrete slab numbers for Bangor, ME line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Concrete slab in Bangor: your questions

+How much does it cost to pour a concrete slab in Bangor?

For 400 sq ft, expect $2,250 to $4,800 in the Bangor area. A standard-spec job lands at $3,000 to $4,050. Small jobs usually cost more per sq ft and large ones less.

+What is the price per sq ft for concrete slab in Bangor?

About $5.50 to $11 per sq ft for materials and labor, plus $50 to $390 for the permit if one is needed. The US range is $6 to $12.

+Is concrete slab cheaper in Bangor or Portland?

Portland is 150 miles away. The midpoint for 400 sq ft there is $3,850, which is 10% more than Bangor ($3,550). Wage and materials indexes both feed that gap.

+How much of the bill is labor in Bangor?

About 39% at the midpoint, or $1,350 out of $3,550. Materials are 55% and permits 6%. Nationally, labor is 42%.

+What would 20x20 (400 sq ft) cost in Bangor?

$2,250 to $4,800. Pick a different size in the estimator above to get your own number.

+Does concrete slab need a permit in Bangor?

Often, but rules are set by your city or county building office, so call before you hire. Budget $50 to $390 for fees in the Bangor area (our national range of $50 to $400 scaled by the local price level).

+Is Bangor expensive for concrete slab compared with the rest of Maine?

Bangor is 5% below the Maine statewide estimate ($3,750 at the midpoint). We cover 2 metros in Maine; see the state page to compare them.

+What do cement masons and concrete finishers earn in Bangor?

The BLS median is $21.56 an hour in the Bangor area, compared with $27.41 nationally. The 25th to 75th percentile range is $17.90 to $24.52.

+What do basic and premium concrete slab work cost in Bangor?

For 400 sq ft, basic work runs $2,250 to $3,250 and premium work $3,800 to $4,800. Basic means: 4-inch broom-finish slab, light mesh, easy truck access. Premium means: 6-inch slab, heavy reinforcement, thick base, pump truck or tight access.

+When is the best time to pour a concrete slab in Bangor?

Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are May through September. July and August are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.

+What does "add rebar reinforcement" add in Bangor?

$370 to $1,100 for 400 sq ft, from a national range scaled by the local wage and goods indexes.

Concrete slab near Bangor

Concrete slab: all pricesConcrete slab in MaineAll projects in BangorMaine cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.