Concrete slab cost in Fresno, CA

Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.

Typical range (400 sq ft)
$2,600 – $5,550
Per sq ft
$6.45 – $13
before permit
Versus US midpoint
+7%
US $3,850
Rank of 300 metros
#49
1 = most expensive

A concrete slab in Fresno, CA usually costs $2,600 to $5,550 for 400 sq ft. That works out to about $6.45 to $13 per sq ft before permits. Compared with the national midpoint that is $260 more. Cement masons and concrete finishers earn a median of $27.70 an hour in the Fresno area, 1% above the US median of $27.41.

Estimate your concrete slab cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

4-5 inch slab with rebar or heavier mesh and standard base prep

Add-ons

Estimated cost for 400 sq ft in Fresno, CA, standard level

$3,500 to $4,650

About $8.35 to $11 per sq ft before permits. Labor is about 43% of the bill.

Cost breakdown
PartLowHigh
Materials$1,750$2,450
Labor$1,550$1,900
Permits and fees$160$300
Total$3,500$4,650
Save and get a PDF report

Cost breakdown for 400 sq ft in Fresno, CA

Part of the jobLowMidpointHighShare
Materials$1,250$2,100$2,95052%
Labor$1,300$1,750$2,20043%
Permits and fees$50$230$4106%
Total$2,600$4,100$5,550100%

Why Fresno prices look the way they do

We price the labor side from BLS wage data for 4 trades: cement masons and concrete finishers at 50%, construction laborers at 30%, operating engineers and other construction equipment operators at 10%, carpenters at 10%. Weighted together, Fresno wages are 1.09 times the national level. Labor makes up about 43% of the midpoint estimate (42% at national prices).

Materials are scaled with BEA's regional price parity for goods. Fresno is at 105.2 against 100 for the US, so a materials line of $2,000 nationally becomes $2,100 here (midpoint, 400 sq ft). Permits follow the all-items index of 102.2: $50 to $410.

Optional extras in Fresno

Add-ons start from national price ranges and are scaled by 1.07 for Fresno, which is the average of the area's wage index (1.09) and goods price index (1.05). The estimator above can add them to your total.

Add-on prices
Add-onLocal range
Add rebar reinforcement$430 – $1,300
Remove old concrete first$860 – $2,550

Specs and site conditions that change a Fresno bid

  • Small-job minimums

    Many crews have a minimum charge, so a 10x10 pad can cost more per square foot than a 20x20 slab.

  • Finish

    A broom finish is the baseline. Stamped, stained, or exposed-aggregate finishes are priced as add-ons on top of the slab.

  • Thickness and mix

    A 4-inch slab uses about 1.23 cubic yards of concrete per 100 sq ft; a 6-inch slab uses about 1.85. Stepping up from a 3,000 PSI to a 4,000-4,500 PSI mix adds $10-$40 per cubic yard (Estimators.us).

Pick a size, pick a tier: concrete slab pricing in Fresno

The cited range is split into basic, standard and premium bands, then scaled to Fresno. Bands overlap, because plenty of standard jobs cost as much as a light premium one. Sizes run from 10x10 pad (100 sq ft) to 30x40 foundation (1,200 sq ft).

Basic

$2,600 to $3,800

4-inch broom-finish slab, light mesh, easy truck access

Standard

$3,500 to $4,650

4-5 inch slab with rebar or heavier mesh and standard base prep

Premium

$4,350 to $5,550

6-inch slab, heavy reinforcement, thick base, pump truck or tight access

Cost by size and quality level
SizeBasicStandardPremium
10x10 pad (100 sq ft)$690 – $1,100$990 – $1,400$1,300 – $1,700
12x12 (144 sq ft)$980 – $1,500$1,350 – $1,850$1,750 – $2,250
20x20 (400 sq ft)$2,600 – $3,800$3,500 – $4,650$4,350 – $5,550
24x24 garage floor (576 sq ft)$3,750 – $5,350$4,950 – $6,600$6,200 – $7,800
30x40 foundation (1,200 sq ft)$7,750 – $11,000$10,200 – $13,400$12,600 – $15,800

Fresno weather and the concrete slab calendar

Climate numbers on this page come from NOAA's 1991-2020 U.S. Climate Normals at the nearest suitable station, Fresno Yosemite Intl Ap (5 miles from the city center). They are 30-year averages, so any one year can run hotter, colder or wetter.

For pouring concrete, the comfortable months in Fresno are January through May and October through November: 7 of 12. Outside them, December has an average overnight low of 40°F or below, and June, July, August and September have an average daytime high of 90°F or more.

The 40°F line is a deliberately cautious stand-in. The American Concrete Institute's cold-weather guide (ACI 306R-16) defines cold-weather concreting around an average daily air temperature below 40°F, which is colder than our test of an average overnight low at or below 40°F, so we flag a few extra shoulder months. In cold weather crews may need heated enclosures, insulating blankets or accelerated mixes, and those measures can raise a quote.

Heat matters for concrete as well. With average highs of 90°F or more in June, July, August and September, crews often start early, wet the base and plan for faster set times.

Fresno gets about 11 inches of precipitation in a normal year. The wettest months are January, February and March (2.2 inches in January). Inside the workable window, May and October are the driest, at 0.4 and 0.6 inches. The station averages about 113 days a year at 90°F or above.

We do not adjust the estimate by month, because we have no reliable published data on seasonal pricing. It is still worth asking contractors whether an off-peak start date changes their bid.

Monthly normals, Fresno Yosemite Intl Ap (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan55412.2Workable
Feb61431.9Workable
Mar68471.9Workable
Apr74511.0Workable
May83580.4Workable
Jun91640.2Hot
Jul98690.0Hot
Aug97680.0Hot
Sep91630.1Hot
Oct79550.6Workable
Nov65450.9Workable
Dec55401.8Cold

What local crews earn in Fresno

The labor line is built from BLS wage data, one trade at a time. This job draws on 4 trades. We compare each trade's local median with the US median, weight the ratios by how much of the job each trade does, and apply the blend to the national labor cost. For Fresno the blend is 1.09.

Cement masons and concrete finishers (47-2051), 50% of the weighting: a median of $27.70 an hour, in line with the US median of $27.41. The middle half of them earn between $22.89 and $35.00 an hour. About 980 work in the metro. That is 20.5 per 10,000 jobs, compared with 13.3 nationally, which suggests plenty of local crews to bid.

For construction laborers (47-2061, weighted 30%) the local median is $26.50 an hour, which is 17% above the national $22.66. The middle half of them earn between $22.16 and $36.70 an hour. BLS counts 2,660 of them working in the area, 55.8 for every 10,000 jobs (US: 70.5), so the local bench is thinner than average.

Operating engineers and other construction equipment operators (47-2073), 10% of the weighting: a median of $37.65 an hour, 31% above the US median of $28.78. The middle half of them earn between $29.55 and $59.69 an hour. About 1,290 work in the metro. That is 27.1 per 10,000 jobs, compared with 30.7 nationally, so the supply of crews looks typical.

Carpenters (47-2031), 10% of the weighting: a median of $30.52 an hour, 5% above the US median of $29.12. The middle half of them earn between $23.62 and $39.23 an hour. About 1,790 work in the metro. That is 37.5 per 10,000 jobs, compared with 43.1 nationally, so the supply of crews looks typical.

A quick sensitivity check: moving the lead trade (cement masons and concrete finishers) from the median to the 75th percentile wage adds about $210 to the midpoint estimate; the 25th percentile takes off about $140. That is a swing of roughly 3.4% to 5.2% of the total, which is useful for judging whether a bid reflects wages or something else, such as scope or margin.

Fresno has 476,890 jobs in total (BLS, May 2025), ranking 53rd by size among the 300 metros on this site.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Cement masons and concrete finishers (47-2051)50%$22.89$27.70$35.00$27.411.01metro
Construction laborers (47-2061)30%$22.16$26.50$36.70$22.661.17metro
Operating engineers and other construction equipment operators (47-2073)10%$29.55$37.65$59.69$28.781.31metro
Carpenters (47-2031)10%$23.62$30.52$39.23$29.121.05metro
Blended100%1.09

How Fresno compares

Same job, same size (400 sq ft), priced for the nearest metros. San Jose is the priciest of the group at $4,650. Visalia is the cheapest at $3,950.

Comparison with nearby areas
AreaRangeMidpointvs. here
Fresno, CAthis page$2,600 – $5,550$4,100
Merced, CA60 miles$2,600 – $5,450$4,000−1%
Visalia, CA65 miles$2,550 – $5,350$3,950−3%
Modesto, CA85 miles$2,900 – $6,000$4,450+9%
San Jose, CA95 miles$3,050 – $6,250$4,650+14%
Salinas, CA100 miles$2,800 – $5,850$4,300+6%
California (statewide)$2,750 – $5,800$4,300+5%
United States$2,450 – $5,200$3,850−6%

Out of the 300 metros we cover, Fresno ranks #49 for the cost of this job (#1 is the most expensive). Statewide, Fresno is 5% below the California figure.

Elsewhere in California

California metros compared with Fresno
MetroSizeRangeMidpointvs. here
Los Angeles, CA6,271,560 jobs$2,800 – $5,850$4,350+6%
San Francisco, CA2,373,920 jobs$3,150 – $6,450$4,800+18%
Riverside, CA1,716,760 jobs$2,650 – $5,550$4,100+1%
San Diego, CA1,538,060 jobs$2,800 – $5,900$4,350+6%
San Jose, CA1,134,970 jobs$3,050 – $6,250$4,650+14%
Sacramento, CA1,080,590 jobs$2,750 – $5,750$4,250+4%

Metros of a similar size

Big cities and small ones price differently, so here is Fresno against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
Rochester, NY494,280 jobs$2,550 – $5,300$3,900−4%
Tulsa, OK458,730 jobs$2,200 – $4,650$3,400−16%
Omaha, NE498,100 jobs$2,300 – $4,850$3,600−12%
Albany, NY449,410 jobs$2,600 – $5,450$4,000−1%

Related projects, priced for Fresno

Jobs that often go together with concrete slab are priced below at their usual sizes, using the same Fresno wage and price inputs. Compared with national midpoints, asphalt driveway comes out highest (+18%) and detached garage lowest (+7%); the gap comes from the trades each job uses.

Related projects with local prices
ProjectSizeRangevs. US
Concrete driveway600 sq ft$3,950 – $9,950+8%
Concrete patio300 sq ft$1,350 – $4,300+7%
Detached garage576 sq ft$30,900 – $62,000+7%
Stamped concrete400 sq ft$3,450 – $8,500+7%
Asphalt driveway600 sq ft$3,550 – $8,800+18%
Gravel driveway1,000 sq ft$2,850 – $11,700+14%

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $3,500 to $4,650 for Fresno, CA is attached.

A detailed PDF report of this estimate, $9

The report lays out the concrete slab numbers for Fresno, CA line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Concrete slab in Fresno: your questions

+How much does it cost to pour a concrete slab in Fresno?

For 400 sq ft, expect $2,600 to $5,550 in the Fresno area. A standard-spec job lands at $3,500 to $4,650. Small jobs usually cost more per sq ft and large ones less.

+What is the price per sq ft for concrete slab in Fresno?

About $6.45 to $13 per sq ft for materials and labor, plus $50 to $410 for the permit if one is needed. The US range is $6 to $12.

+Is concrete slab cheaper in Fresno or Merced?

Merced is 60 miles away. The midpoint for 400 sq ft there is $4,000, which is 1% less than Fresno ($4,100). Wage and materials indexes both feed that gap.

+How much of the bill is labor in Fresno?

About 43% at the midpoint, or $1,750 out of $4,100. Materials are 52% and permits 6%. Nationally, labor is 42%.

+What would 20x20 (400 sq ft) cost in Fresno?

$2,600 to $5,550. Pick a different size in the estimator above to get your own number.

+Does concrete slab need a permit in Fresno?

Often, but rules are set by your city or county building office, so call before you hire. Budget $50 to $410 for fees in the Fresno area (our national range of $50 to $400 scaled by the local price level).

+Is Fresno expensive for concrete slab compared with the rest of California?

Fresno is 5% below the California statewide estimate ($4,300 at the midpoint). We cover 23 metros in California; see the state page to compare them.

+What do cement masons and concrete finishers earn in Fresno?

The BLS median is $27.70 an hour in the Fresno area, compared with $27.41 nationally. The 25th to 75th percentile range is $22.89 to $35.00.

+What do basic and premium concrete slab work cost in Fresno?

For 400 sq ft, basic work runs $2,600 to $3,800 and premium work $4,350 to $5,550. Basic means: 4-inch broom-finish slab, light mesh, easy truck access. Premium means: 6-inch slab, heavy reinforcement, thick base, pump truck or tight access.

+When is the best time to pour a concrete slab in Fresno?

Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are January through May and October through November. May and October are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.

+What does "add rebar reinforcement" add in Fresno?

$430 to $1,300 for 400 sq ft, from a national range scaled by the local wage and goods indexes.

Concrete slab near Fresno

Concrete slab: all pricesConcrete slab in CaliforniaAll projects in FresnoCalifornia cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.