Concrete driveway cost in Bloomington, IL
Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.
- Typical range (600 sq ft)
- $4,000 – $10,400
- Per sq ft
- $6.65 – $17
- before permit
- Versus US midpoint
- +12%
- US $6,450
- Rank of 300 metros
- #44
- 1 = most expensive
Bloomington homeowners pay roughly $4,000 to $10,400 to pour a concrete driveway at 600 sq ft, or $6.65 to $17 per sq ft (permit not included). Against the US midpoint, Bloomington is 12% higher. Cement masons and concrete finishers earn a median of $29.51 an hour in the Bloomington area, 8% above the US median of $27.41.
Estimate your concrete driveway cost
Pick a size, a quality level and where you live. Prices update as you type.
Estimated cost for 600 sq ft in Bloomington, IL, standard level
$5,950 to $8,500
About $9.75 to $14 per sq ft before permits. Labor is about 74% of the bill.
| Part | Low | High |
|---|---|---|
| Materials | $1,600 | $1,950 |
| Labor | $4,300 | $6,400 |
| Permits and fees | $90 | $140 |
| Total | $5,950 | $8,500 |
Cost breakdown for 600 sq ft in Bloomington, IL
| Part of the job | Low | Midpoint | High | Share |
|---|---|---|---|---|
| Materials | $1,300 | $1,750 | $2,250 | 25% |
| Labor | $2,700 | $5,350 | $8,000 | 74% |
| Permits and fees | $45 | $120 | $190 | 2% |
| Total | $4,000 | $7,200 | $10,400 | 100% |
Why Bloomington prices look the way they do
We price the labor side from BLS wage data for 4 trades: cement masons and concrete finishers at 50%, construction laborers at 30%, operating engineers and other construction equipment operators at 10%, carpenters at 10%. Weighted together, Bloomington wages are 1.21 times the national level. Labor makes up about 74% of the midpoint estimate (69% at national prices).
On the materials line, the BEA goods price index for the Bloomington metro is 93.6 (US = 100). The midpoint materials bill for 600 sq ft comes to $1,750, compared with $1,900 at national prices. Permit and inspection fees are scaled by the broader index (93.5) and land at $45 to $190.
Planning more than one job in Bloomington?
Because every project leans on different trades, Bloomington's wage level does not move all prices equally. Against the US midpoint, gravel driveway runs +19% and concrete slab +5%.
| Project | Size | Range | vs. US |
|---|---|---|---|
| Asphalt driveway | 600 sq ft | $3,350 – $8,500 | +13% |
| Gravel driveway | 1,000 sq ft | $3,000 – $12,100 | +19% |
| Concrete slab | 400 sq ft | $2,600 – $5,400 | +5% |
| Stamped concrete | 400 sq ft | $3,400 – $8,450 | +6% |
| Paver patio | 300 sq ft | $3,400 – $6,200 | +14% |
| Concrete patio | 300 sq ft | $1,300 – $4,350 | +8% |
Pick a size, pick a tier: concrete driveway pricing in Bloomington
Three bands are cut from the same cited range and localized for Bloomington wages and prices. They overlap on purpose: a good standard job and a modest premium job can cost the same. The grid below prices the same bands at 4 common sizes.
Basic
$4,000 to $6,600
Plain gray, 4-inch broom finish, flat site
Standard
$5,950 to $8,500
5-inch with rebar and saw-cut joints, a border or one color
Premium
$7,850 to $10,400
6-inch for heavy vehicles, stamped or colored, grading needed
| Size | Basic | Standard | Premium |
|---|---|---|---|
| 1-car (12x20), 240 sq ft | $1,650 – $2,700 | $2,450 – $3,500 | $3,200 – $4,300 |
| 2-car (20x24), 480 sq ft | $3,250 – $5,300 | $4,750 – $6,850 | $6,300 – $8,350 |
| 2-car + apron (600 sq ft) | $4,000 – $6,600 | $5,950 – $8,500 | $7,850 – $10,400 |
| 3-car (900 sq ft) | $6,000 – $9,800 | $8,850 – $12,700 | $11,700 – $15,500 |
Add-ons priced for Bloomington
Extras are quoted nationally and then scaled to Bloomington by the average of the local wage index (1.21) and goods index (0.94), a factor of 1.07. Tick any of them in the estimator above to add them to your total. Treat these as planning figures: an add-on touches different trades than the main job, so the scaling is an approximation.
| Add-on | Local range |
|---|---|
| Add rebar reinforcement | $640 – $1,950 |
| Remove the old driveway | $1,300 – $3,850 |
Concrete driveway: what moves the price in Bloomington
Permits and the apron
A driveway permit is typically $50-$200 and is often required for new work. The apron where the driveway meets the street can need a separate right-of-way permit.
Thickness
HomeGuide prices a standard 4-inch driveway at $6-$15/sq ft and a 6-inch one, recommended for heavy vehicles, at $8-$20/sq ft.
Old driveway removal
Tearing out the old surface adds about $2-$6 per sq ft, and some cities want the haul-off documented.
Local wages behind the labor line
Wages are the part of this estimate that changes most from town to town. 4 trades carry the job here, and each is compared with its US median. The weighted result for Bloomington is 1.21 times the national level.
For cement masons and concrete finishers (47-2051, weighted 50%) the local median is $29.51 an hour, which is 8% above the national $27.41. The middle half of them earn between $22.66 and $37.88 an hour. BLS counts 110 of them working in the area, 12.5 for every 10,000 jobs (US: 13.3), so the local bench is about average.
Construction laborers (47-2061), 30% of the weighting: a median of $29.16 an hour, 29% above the US median of $22.66. The middle half of them earn between $21.23 and $37.49 an hour. About 380 work in the metro. That is 43.1 per 10,000 jobs, compared with 70.5 nationally, so expect fewer local crews to bid.
For operating engineers and other construction equipment operators (47-2073, weighted 10%) the local median is $46.27 an hour, which is 61% above the national $28.78. The middle half of them earn between $40.00 and $48.14 an hour. BLS counts 180 of them working in the area, 20.4 for every 10,000 jobs (US: 30.7), so the local bench is thinner than average.
For carpenters (47-2031, weighted 10%) the local median is $36.28 an hour, which is 25% above the national $29.12. The middle half of them earn between $28.00 and $44.69 an hour. BLS counts 170 of them working in the area, 19.3 for every 10,000 jobs (US: 43.1), so the local bench is thinner than average.
Quotes come from real crews, not medians. If the cement masons and concrete finishers on your job are paid at the 75th percentile ($37.88 an hour) instead of the median, the labor line grows by about $670. At the 25th percentile ($22.66) it shrinks by about $550. The total moves by 9.3% or 7.6%, so wages alone rarely explain a quote that is far outside our range.
For context on the local economy, BLS counts 88,110 jobs in the Bloomington area. That makes it the 222nd largest of the 300 metros we cover, with 0.06% of US employment.
| Trade | Weight | 25th pct | Median | 75th pct | US median | Ratio | Level used |
|---|---|---|---|---|---|---|---|
| Cement masons and concrete finishers (47-2051) | 50% | $22.66 | $29.51 | $37.88 | $27.41 | 1.08 | metro |
| Construction laborers (47-2061) | 30% | $21.23 | $29.16 | $37.49 | $22.66 | 1.29 | metro |
| Operating engineers and other construction equipment operators (47-2073) | 10% | $40.00 | $46.27 | $48.14 | $28.78 | 1.61 | metro |
| Carpenters (47-2031) | 10% | $28.00 | $36.28 | $44.69 | $29.12 | 1.25 | metro |
| Blended | 100% | 1.21 | |||||
Is Bloomington cheap or dear? The local comparison
Contractors rarely work more than an hour or two from home, so the neighboring metros set a rough ceiling and floor for your quotes. Midpoints for 600 sq ft range from $6,600 to $8,350 across Bloomington and its five closest metros.
| Area | Range | Midpoint | vs. here |
|---|---|---|---|
| Bloomington, ILthis page | $4,000 – $10,400 | $7,200 | |
| Champaign, IL35 miles | $4,200 – $11,000 | $7,600 | +5% |
| Peoria, IL40 miles | $4,250 – $11,100 | $7,650 | +6% |
| Springfield, IL65 miles | $4,050 – $10,600 | $7,300 | +1% |
| Lafayette, IN95 miles | $3,700 – $9,500 | $6,600 | −9% |
| Chicago, IL100 miles | $4,650 – $12,000 | $8,350 | +16% |
| Illinois (statewide) | $4,500 – $11,700 | $8,100 | +12% |
| United States | $3,650 – $9,200 | $6,450 | −11% |
Across 300 US metros, Bloomington comes in at #44 from the top. The priciest is Kahului, HI at $10,000; the cheapest is McAllen, TX at $4,950 (midpoints, 600 sq ft). Statewide, Bloomington is 11% below the Illinois figure.
Other Illinois metros
| Metro | Size | Range | Midpoint | vs. here |
|---|---|---|---|---|
| Chicago, IL | 4,513,280 jobs | $4,650 – $12,000 | $8,350 | +16% |
| Peoria, IL | 166,020 jobs | $4,250 – $11,100 | $7,650 | +6% |
| Rockford, IL | 137,650 jobs | $4,250 – $11,100 | $7,700 | +6% |
| Champaign, IL | 105,500 jobs | $4,200 – $11,000 | $7,600 | +5% |
| Springfield, IL | 100,810 jobs | $4,050 – $10,600 | $7,300 | +1% |
Cities with a workforce like Bloomington's
Big cities and small ones price differently, so here is Bloomington against the 4 metros with the closest total employment.
| Metro | Size | Range | Midpoint | vs. here |
|---|---|---|---|---|
| Florence, SC | 89,060 jobs | $3,300 – $8,150 | $5,700 | −21% |
| Monroe, LA | 87,500 jobs | $3,050 – $7,450 | $5,250 | −27% |
| Medford, OR | 89,060 jobs | $3,850 – $9,700 | $6,800 | −6% |
| Joplin, MO | 87,190 jobs | $3,500 – $8,900 | $6,200 | −14% |
When to schedule concrete driveway in Bloomington
We use NOAA's 1991-2020 climate normals for Normal 4Ne (5 miles from the city center). These are 30-year monthly averages, not forecasts.
May through October is the stretch where pouring concrete runs into the fewest weather problems in Bloomington (6 of 12 months). January, February, March, April, November and December have an average overnight low of 40°F or below.
The 40°F line is a deliberately cautious stand-in. The American Concrete Institute's cold-weather guide (ACI 306R-16) defines cold-weather concreting around an average daily air temperature below 40°F, which is colder than our test of an average overnight low at or below 40°F, so we flag a few extra shoulder months. In cold weather crews may need heated enclosures, insulating blankets or accelerated mixes, and those measures can raise a quote.
Bloomington gets about 39 inches of precipitation in a normal year, including roughly 20 inches of snow. The wettest months are May, June and July (4.8 inches in May). Inside the workable window, September and October are the driest, at 3.2 and 3.5 inches. The station averages about 26 days a year at 90°F or above.
Does the season change the price? Probably, but we do not have a sourced seasonal price curve, so the estimator shows a year-round figure and does not adjust by month. When you collect quotes, ask whether scheduling in a slower month gets a better rate.
| Month | Avg high °F | Avg low °F | Precip (in) | For this job |
|---|---|---|---|---|
| Jan | 33 | 16 | 2.4 | Cold |
| Feb | 38 | 19 | 2.0 | Cold |
| Mar | 50 | 28 | 2.6 | Cold |
| Apr | 63 | 38 | 3.7 | Cold |
| May | 74 | 50 | 4.8 | Workable |
| Jun | 83 | 60 | 4.1 | Workable |
| Jul | 86 | 63 | 4.1 | Workable |
| Aug | 84 | 61 | 3.8 | Workable |
| Sep | 79 | 53 | 3.2 | Workable |
| Oct | 66 | 42 | 3.5 | Workable |
| Nov | 50 | 31 | 2.8 | Cold |
| Dec | 38 | 21 | 2.3 | Cold |
Get 3 local quotes
Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $5,950 to $8,500 for Bloomington, IL is attached.
Detailed concrete driveway report for Bloomington, IL, $9
Multi-page report for Bloomington, IL: low, typical and high cost, a line-item breakdown of materials and labor by trade, permit notes, the best months to schedule, a quote comparison sheet, red flags, questions for contractors, checklists and every source. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.
Concrete driveway in Bloomington: your questions
+How much does it cost to pour a concrete driveway in Bloomington?
For 600 sq ft, expect $4,000 to $10,400 in the Bloomington area. A standard-spec job lands at $5,950 to $8,500. Small jobs usually cost more per sq ft and large ones less.
+What is the price per sq ft for concrete driveway in Bloomington?
About $6.65 to $17 per sq ft for materials and labor, plus $45 to $190 for the permit if one is needed. The US range is $6 to $15.
+Is concrete driveway cheaper in Bloomington or Champaign?
Champaign is 35 miles away. The midpoint for 600 sq ft there is $7,600, which is 5% more than Bloomington ($7,200). Wage and materials indexes both feed that gap.
+How much of the bill is labor in Bloomington?
About 74% at the midpoint, or $5,350 out of $7,200. Materials are 25% and permits 2%. Nationally, labor is 69%.
+What would 2-car + apron (600 sq ft) cost in Bloomington?
$4,000 to $10,400. Pick a different size in the estimator above to get your own number.
+Does concrete driveway need a permit in Bloomington?
Often, but rules are set by your city or county building office, so call before you hire. Budget $45 to $190 for fees in the Bloomington area (our national range of $50 to $200 scaled by the local price level).
+Is Bloomington expensive for concrete driveway compared with the rest of Illinois?
Bloomington is 11% below the Illinois statewide estimate ($8,100 at the midpoint). We cover 6 metros in Illinois; see the state page to compare them.
+What do cement masons and concrete finishers earn in Bloomington?
The BLS median is $29.51 an hour in the Bloomington area, compared with $27.41 nationally. The 25th to 75th percentile range is $22.66 to $37.88.
+What do basic and premium concrete driveway work cost in Bloomington?
For 600 sq ft, basic work runs $4,000 to $6,600 and premium work $7,850 to $10,400. Basic means: plain gray, 4-inch broom finish, flat site. Premium means: 6-inch for heavy vehicles, stamped or colored, grading needed.
+When is the best time to pour a concrete driveway in Bloomington?
Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are May through October. September and October are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.
+What does "add rebar reinforcement" add in Bloomington?
$640 to $1,950 for 600 sq ft, from a national range scaled by the local wage and goods indexes.
Concrete driveway near Bloomington
Where these numbers come from
Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.
- HomeGuide: How Much Does a Concrete Driveway Cost? (2026) (accessed November 4, 2026)
- SimplyWise: Concrete Estimate Template: Free PDF + Excel (2026) (accessed November 4, 2026)
- HomeGuide: 2026 Building Permit Costs | Fees & Cost Calculator (accessed November 4, 2026)
- BLS Occupational Employment and Wage Statistics, May 2025
- BEA Regional Price Parities, 2024
- NOAA NCEI U.S. Climate Normals, 1991-2020
Note on derived figures: Materials = SimplyWise's sample 600 sq ft, 4-inch driveway line ($1,400-$2,400 in materials) divided by 600 sq ft.