Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.

Typical range (300 sq ft)
$1,300 – $4,350
Per sq ft
$4.15 – $13.50
before permit
Versus US midpoint
+8%
US $2,650
Rank of 300 metros
#55
1 = most expensive

Bloomington homeowners pay roughly $1,300 to $4,350 to pour a concrete patio at 300 sq ft, or $4.15 to $13.50 per sq ft (permit not included). Against the US midpoint, Bloomington is 8% higher. Cement masons and concrete finishers earn a median of $29.51 an hour in the Bloomington area, 8% above the US median of $27.41.

Estimate your concrete patio cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

Colored or stained, saw-cut joints, minor grading

Add-ons

Estimated cost for 300 sq ft in Bloomington, IL, standard level

$2,200 to $3,450

About $6.90 to $10.50 per sq ft before permits. Labor is about 58% of the bill.

Cost breakdown
PartLowHigh
Materials$870$1,100
Labor$1,200$2,050
Permits and fees$140$280
Total$2,200$3,450
Save and get a PDF report

Cost breakdown for 300 sq ft in Bloomington, IL

Part of the jobLowMidpointHighShare
Materials$700$980$1,25035%
Labor$540$1,650$2,70058%
Permits and fees$45$210$3707%
Total$1,300$2,850$4,350100%

What is behind the Bloomington number

The wage side of the estimate leans on cement masons and concrete finishers, who do 50% of the hours on a typical job. Their local median is $29.51 an hour. Add the other trades involved and the blended wage index for Bloomington is 1.21 (US = 1.00), which puts labor at 58% of the total.

On the materials line, the BEA goods price index for the Bloomington metro is 93.6 (US = 100). The midpoint materials bill for 300 sq ft comes to $980, compared with $1,050 at national prices. Permit and inspection fees are scaled by the broader index (93.5) and land at $45 to $370.

When to schedule concrete patio in Bloomington

We use NOAA's 1991-2020 climate normals for Normal 4Ne (5 miles from the city center). These are 30-year monthly averages, not forecasts.

May through October is the stretch where pouring concrete runs into the fewest weather problems in Bloomington (6 of 12 months). January, February, March, April, November and December have an average overnight low of 40°F or below.

The 40°F line is a deliberately cautious stand-in. The American Concrete Institute's cold-weather guide (ACI 306R-16) defines cold-weather concreting around an average daily air temperature below 40°F, which is colder than our test of an average overnight low at or below 40°F, so we flag a few extra shoulder months. In cold weather crews may need heated enclosures, insulating blankets or accelerated mixes, and those measures can raise a quote.

Bloomington gets about 39 inches of precipitation in a normal year, including roughly 20 inches of snow. The wettest months are May, June and July (4.8 inches in May). Inside the workable window, September and October are the driest, at 3.2 and 3.5 inches. The station averages about 26 days a year at 90°F or above.

Does the season change the price? Probably, but we do not have a sourced seasonal price curve, so the estimator shows a year-round figure and does not adjust by month. When you collect quotes, ask whether scheduling in a slower month gets a better rate.

Monthly normals, Normal 4Ne (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan33162.4Cold
Feb38192.0Cold
Mar50282.6Cold
Apr63383.7Cold
May74504.8Workable
Jun83604.1Workable
Jul86634.1Workable
Aug84613.8Workable
Sep79533.2Workable
Oct66423.5Workable
Nov50312.8Cold
Dec38212.3Cold

Concrete patio: what moves the price in Bloomington

  • Permit

    Permits run $50-$400 where required. Many cities don't require one for a small at-grade patio.

  • Finish

    Plain concrete is $4-$12 per sq ft and a broom finish $6-$13; designs with several colors and decorative finishes run up to about $28 (HomeGuide).

  • Site prep

    Excavation, forms and a gravel base are the unglamorous part of the bill and vary most with soil and slope.

Is Bloomington cheap or dear? The local comparison

Contractors rarely work more than an hour or two from home, so the neighboring metros set a rough ceiling and floor for your quotes. Midpoints for 300 sq ft range from $2,650 to $3,250 across Bloomington and its five closest metros.

Comparison with nearby areas
AreaRangeMidpointvs. here
Bloomington, ILthis page$1,300 – $4,350$2,850
Champaign, IL35 miles$1,350 – $4,550$2,950+4%
Peoria, IL40 miles$1,350 – $4,550$2,950+4%
Springfield, IL65 miles$1,300 – $4,400$2,850+1%
Lafayette, IN95 miles$1,250 – $4,050$2,650−7%
Chicago, IL100 miles$1,500 – $5,000$3,250+15%
Illinois (statewide)$1,450 – $4,850$3,150+12%
United States$1,250 – $4,000$2,650−7%

Across 300 US metros, Bloomington comes in at #55 from the top. The priciest is Kahului, HI at $3,800; the cheapest is McAllen, TX at $2,100 (midpoints, 300 sq ft). Statewide, Bloomington is 11% below the Illinois figure.

Other Illinois metros

Illinois metros compared with Bloomington
MetroSizeRangeMidpointvs. here
Chicago, IL4,513,280 jobs$1,500 – $5,000$3,250+15%
Peoria, IL166,020 jobs$1,350 – $4,550$2,950+4%
Rockford, IL137,650 jobs$1,350 – $4,600$2,950+5%
Champaign, IL105,500 jobs$1,350 – $4,550$2,950+4%
Springfield, IL100,810 jobs$1,300 – $4,400$2,850+1%

Cities with a workforce like Bloomington's

Big cities and small ones price differently, so here is Bloomington against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
Florence, SC89,060 jobs$1,150 – $3,600$2,350−16%
Monroe, LA87,500 jobs$1,100 – $3,300$2,200−22%
Medford, OR89,060 jobs$1,300 – $4,200$2,750−2%
Joplin, MO87,190 jobs$1,200 – $3,800$2,500−11%

What nearby projects cost in Bloomington

Because every project leans on different trades, Bloomington's wage level does not move all prices equally. Against the US midpoint, paver patio runs +14% and concrete slab +5%.

Related projects with local prices
ProjectSizeRangevs. US
Concrete slab400 sq ft$2,600 – $5,400+5%
Stamped concrete400 sq ft$3,400 – $8,450+6%
Paver patio300 sq ft$3,400 – $6,200+14%
Wood deck300 sq ft$8,100 – $16,300+7%
Concrete driveway600 sq ft$4,000 – $10,400+12%
Asphalt driveway600 sq ft$3,350 – $8,500+13%

Extras that change the Bloomington total

Extras are quoted nationally and then scaled to Bloomington by the average of the local wage index (1.21) and goods index (0.94), a factor of 1.07. Tick any of them in the estimator above to add them to your total. Treat these as planning figures: an add-on touches different trades than the main job, so the scaling is an approximation.

Add-on prices
Add-onLocal range
Add an acid or water-based stain$970 – $3,200

Local wages behind the labor line

Wages are the part of this estimate that changes most from town to town. 4 trades carry the job here, and each is compared with its US median. The weighted result for Bloomington is 1.21 times the national level.

For cement masons and concrete finishers (47-2051, weighted 50%) the local median is $29.51 an hour, which is 8% above the national $27.41. The middle half of them earn between $22.66 and $37.88 an hour. BLS counts 110 of them working in the area, 12.5 for every 10,000 jobs (US: 13.3), so the local bench is about average.

Construction laborers (47-2061), 30% of the weighting: a median of $29.16 an hour, 29% above the US median of $22.66. The middle half of them earn between $21.23 and $37.49 an hour. About 380 work in the metro. That is 43.1 per 10,000 jobs, compared with 70.5 nationally, so expect fewer local crews to bid.

For carpenters (47-2031, weighted 10%) the local median is $36.28 an hour, which is 25% above the national $29.12. The middle half of them earn between $28.00 and $44.69 an hour. BLS counts 170 of them working in the area, 19.3 for every 10,000 jobs (US: 43.1), so the local bench is thinner than average.

For operating engineers and other construction equipment operators (47-2073, weighted 10%) the local median is $46.27 an hour, which is 61% above the national $28.78. The middle half of them earn between $40.00 and $48.14 an hour. BLS counts 180 of them working in the area, 20.4 for every 10,000 jobs (US: 30.7), so the local bench is thinner than average.

Quotes come from real crews, not medians. If the cement masons and concrete finishers on your job are paid at the 75th percentile ($37.88 an hour) instead of the median, the labor line grows by about $210. At the 25th percentile ($22.66) it shrinks by about $170. The total moves by 7.3% or 6.0%, so wages alone rarely explain a quote that is far outside our range.

For context on the local economy, BLS counts 88,110 jobs in the Bloomington area. That makes it the 222nd largest of the 300 metros we cover, with 0.06% of US employment.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Cement masons and concrete finishers (47-2051)50%$22.66$29.51$37.88$27.411.08metro
Construction laborers (47-2061)30%$21.23$29.16$37.49$22.661.29metro
Carpenters (47-2031)10%$28.00$36.28$44.69$29.121.25metro
Operating engineers and other construction equipment operators (47-2073)10%$40.00$46.27$48.14$28.781.61metro
Blended100%1.21

Bloomington: what basic, standard and premium work costs

Three bands are cut from the same cited range and localized for Bloomington wages and prices. They overlap on purpose: a good standard job and a modest premium job can cost the same. The grid below prices the same bands at 3 common sizes.

Basic

$1,300 to $2,500

Plain gray slab, broom finish, flat yard

Standard

$2,200 to $3,450

Colored or stained, saw-cut joints, minor grading

Premium

$3,150 to $4,350

Exposed aggregate or heavy decorative finish, drainage work

Cost by size and quality level
SizeBasicStandardPremium
10x10 (100 sq ft)$460 – $960$830 – $1,350$1,200 – $1,700
12x16 (192 sq ft)$840 – $1,700$1,450 – $2,300$2,100 – $2,950
20x20 (400 sq ft)$1,700 – $3,300$2,900 – $4,500$4,100 – $5,700

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $2,200 to $3,450 for Bloomington, IL is attached.

Detailed concrete patio report for Bloomington, IL, $9

Multi-page report for Bloomington, IL: low, typical and high cost, a line-item breakdown of materials and labor by trade, permit notes, the best months to schedule, a quote comparison sheet, red flags, questions for contractors, checklists and every source. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Concrete patio in Bloomington: your questions

+How much does it cost to pour a concrete patio in Bloomington?

For 300 sq ft, expect $1,300 to $4,350 in the Bloomington area. A standard-spec job lands at $2,200 to $3,450. Small jobs usually cost more per sq ft and large ones less.

+What is the price per sq ft for concrete patio in Bloomington?

About $4.15 to $13.50 per sq ft for materials and labor, plus $45 to $370 for the permit if one is needed. The US range is $4 to $12.

+Is concrete patio cheaper in Bloomington or Champaign?

Champaign is 35 miles away. The midpoint for 300 sq ft there is $2,950, which is 4% more than Bloomington ($2,850). Wage and materials indexes both feed that gap.

+How much of the bill is labor in Bloomington?

About 58% at the midpoint, or $1,650 out of $2,850. Materials are 35% and permits 7%. Nationally, labor is 51%.

+What would 12x16 (192 sq ft) cost in Bloomington?

$840 to $2,950. Pick a different size in the estimator above to get your own number.

+Does concrete patio need a permit in Bloomington?

Often, but rules are set by your city or county building office, so call before you hire. Budget $45 to $370 for fees in the Bloomington area (our national range of $50 to $400 scaled by the local price level).

+Is Bloomington expensive for concrete patio compared with the rest of Illinois?

Bloomington is 11% below the Illinois statewide estimate ($3,150 at the midpoint). We cover 6 metros in Illinois; see the state page to compare them.

+What do cement masons and concrete finishers earn in Bloomington?

The BLS median is $29.51 an hour in the Bloomington area, compared with $27.41 nationally. The 25th to 75th percentile range is $22.66 to $37.88.

+What do basic and premium concrete patio work cost in Bloomington?

For 300 sq ft, basic work runs $1,300 to $2,500 and premium work $3,150 to $4,350. Basic means: plain gray slab, broom finish, flat yard. Premium means: exposed aggregate or heavy decorative finish, drainage work.

+When is the best time to pour a concrete patio in Bloomington?

Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are May through October. September and October are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.

+What does "add an acid or water-based stain" add in Bloomington?

$970 to $3,200 for 300 sq ft, from a national range scaled by the local wage and goods indexes.

Concrete patio near Bloomington

Concrete patio: all pricesConcrete patio in IllinoisAll projects in BloomingtonIllinois cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.

Note on derived figures: Materials = SimplyWise's sample 200 sq ft broom-finish patio line ($500-$900 in materials) divided by 200 sq ft.