Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.

Typical range (600 sq ft)
$2,900 – $7,100
Per sq ft
$4.80 – $11.50
before permit
Versus US midpoint
−4%
US $5,250
Rank of 300 metros
#177
1 = most expensive

An asphalt driveway in Ogden, UT usually costs $2,900 to $7,100 for 600 sq ft. That works out to about $4.80 to $11.50 per sq ft before permits. Compared with the national midpoint that is $230 less. Paving, surfacing and tamping equipment operators earn a median of $22.17 an hour in the Ogden area, 14% below the US median of $25.64.

Estimate your asphalt driveway cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

Full new driveway: base, 2-3 in of hot mix, edging

Add-ons

Estimated cost for 600 sq ft in Ogden, UT, standard level

$4,150 to $5,850

About $6.80 to $9.45 per sq ft before permits. Labor is about 40% of the bill.

Cost breakdown
PartLowHigh
Materials$2,500$3,250
Labor$1,600$2,450
Permits and fees$95$160
Total$4,150$5,850
Save and get a PDF report

Cost breakdown for 600 sq ft in Ogden, UT

Part of the jobLowMidpointHighShare
Materials$1,900$2,850$3,80057%
Labor$960$2,000$3,05040%
Permits and fees$50$130$2003%
Total$2,900$5,000$7,100100%

Where the Ogden price comes from

Labor is 40% of the midpoint bill here, against 41% nationally. The mix of trades behind this job is paving, surfacing and tamping equipment operators (40%), construction laborers (30%), operating engineers and other construction equipment operators (30%). We weight each trade's local median wage by that share and compare it with the national median. In Ogden the blended ratio comes out at 0.94.

Materials are scaled with BEA's regional price parity for goods. Ogden is at 96.4 against 100 for the US, so a materials line of $2,950 nationally becomes $2,850 here (midpoint, 600 sq ft). Permits follow the all-items index of 100.3: $50 to $200.

Ogden: what basic, standard and premium work costs

The cited range is split into basic, standard and premium bands, then scaled to Ogden. Bands overlap, because plenty of standard jobs cost as much as a light premium one. Sizes run from 1-car (12x20), 240 sq ft to long rural (10x100), 1,000 sq ft.

Basic

$2,900 to $4,600

New topcoat over a sound base, flat lot

Standard

$4,150 to $5,850

Full new driveway: base, 2-3 in of hot mix, edging

Premium

$5,400 to $7,100

Full tear-out and rebuild, drainage work, heavy-duty depth

Cost by size and quality level
SizeBasicStandardPremium
1-car (12x20), 240 sq ft$1,200 – $1,900$1,700 – $2,450$2,250 – $2,950
20x20 (400 sq ft)$1,950 – $3,100$2,800 – $3,950$3,650 – $4,800
2-car (20x30), 600 sq ft$2,900 – $4,600$4,150 – $5,850$5,400 – $7,100
long rural (10x100), 1,000 sq ft$4,850 – $7,550$6,900 – $9,600$8,950 – $11,700

Ogden weather and the asphalt driveway calendar

Climate numbers on this page come from NOAA's 1991-2020 U.S. Climate Normals at the nearest suitable station, Ogden Hinkley Ap (5 miles from the city center). They are 30-year averages, so any one year can run hotter, colder or wetter.

For digging, grading and setting material in the ground, the comfortable months in Ogden are March through June and August through October: 7 of 12. Outside them, January, February, November and December have an average overnight low at or below freezing (32°F), and July has an average daytime high of 90°F or more.

In January, February, November and December the average low is at or below freezing, which means frozen ground and slower digging, compaction and sod or stone placement. NOAA counts about 121 days a year with a low at or below 32°F at this station.

Ogden gets about 16 inches of precipitation in a normal year. The wettest months are March, April and May (2.2 inches in May). Inside the workable window, August and September are the driest, at 0.7 and 1.1 inches. The station averages about 49 days a year at 90°F or above.

We do not adjust the estimate by month, because we have no reliable published data on seasonal pricing. It is still worth asking contractors whether an off-peak start date changes their bid.

Monthly normals, Ogden Hinkley Ap (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan36211.5Cold
Feb42251.6Cold
Mar53331.7Workable
Apr60392.0Workable
May70472.2Workable
Jun82551.1Workable
Jul91650.3Hot
Aug89630.7Workable
Sep78531.1Workable
Oct63411.7Workable
Nov49311.2Cold
Dec37221.3Cold

Add-ons priced for Ogden

Add-ons start from national price ranges and are scaled by 0.95 for Ogden, which is the average of the area's wage index (0.94) and goods price index (0.96). The estimator above can add them to your total.

Add-on prices
Add-onLocal range
Add a sealcoat$570 – $1,150

What nearby projects cost in Ogden

Jobs that often go together with asphalt driveway are priced below at their usual sizes, using the same Ogden wage and price inputs. Compared with national midpoints, French drain comes out highest (−2%) and concrete driveway lowest (−6%); the gap comes from the trades each job uses.

Related projects with local prices
ProjectSizeRangevs. US
Concrete driveway600 sq ft$3,450 – $8,650−6%
Gravel driveway1,000 sq ft$2,450 – $10,000−2%
Paver patio300 sq ft$2,950 – $5,350−2%
French drain60 linear ft$590 – $2,050−2%
Concrete slab400 sq ft$2,350 – $4,950−5%
Concrete patio300 sq ft$1,200 – $3,800−5%

How Ogden compares

Contractors rarely work more than an hour or two from home, so the neighboring metros set a rough ceiling and floor for your quotes. Midpoints for 600 sq ft range from $5,000 to $5,450 across Ogden and its five closest metros.

Comparison with nearby areas
AreaRangeMidpointvs. here
Ogden, UTthis page$2,900 – $7,100$5,000
Logan, UT55 miles$2,900 – $7,050$5,000level
Salt Lake City, UT70 miles$3,050 – $7,500$5,300+6%
Provo, UT90 miles$2,900 – $7,050$5,000level
Idaho Falls, ID175 miles$3,150 – $7,750$5,450+9%
Grand Junction, CO230 miles$3,000 – $7,300$5,150+3%
Utah (statewide)$2,950 – $7,150$5,050+1%
United States$3,050 – $7,400$5,250+5%

Out of the 300 metros we cover, Ogden ranks #177 for the cost of this job (#1 is the most expensive). Statewide, Ogden is 1% below the Utah figure.

Elsewhere in Utah

Utah metros compared with Ogden
MetroSizeRangeMidpointvs. here
Salt Lake City, UT826,210 jobs$3,050 – $7,500$5,300+6%
Provo, UT304,660 jobs$2,900 – $7,050$5,000level
St. George, UT90,500 jobs$2,900 – $7,100$5,000level
Logan, UT66,800 jobs$2,900 – $7,050$5,000level

Metros of a similar size

Big cities and small ones price differently, so here is Ogden against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
Winston, NC271,980 jobs$2,850 – $6,850$4,850−3%
Jackson, MS270,730 jobs$2,800 – $6,650$4,750−5%
Fayetteville, AR275,180 jobs$2,750 – $6,650$4,700−6%
Poughkeepsie, NY268,970 jobs$3,400 – $8,250$5,850+17%

Asphalt driveway: what moves the price in Ogden

  • New versus overlay

    Resurfacing an existing driveway runs $3-$7 per sq ft; a full new driveway runs $5-$12+ (HomeGuide). Tearing out and replacing one is higher still.

  • Base work

    Four to eight inches of compacted aggregate under the asphalt is where cheap quotes cut corners. Base typically runs $1-$3 per sq ft.

  • Small jobs cost more per foot

    Paving crews move a paver, roller and trucks to your address, so a 400 sq ft driveway carries more mobilization per square foot than a 1,000 sq ft one.

What local crews earn in Ogden

The labor line is built from BLS wage data, one trade at a time. This job draws on 3 trades. We compare each trade's local median with the US median, weight the ratios by how much of the job each trade does, and apply the blend to the national labor cost. For Ogden the blend is 0.94.

Paving, surfacing and tamping equipment operators (47-2071), 40% of the weighting: a median of $22.17 an hour, 14% below the US median of $25.64. The middle half of them earn between $22.05 and $28.14 an hour. About 110 work in the metro. That is 4.1 per 10,000 jobs, compared with 2.7 nationally, which suggests plenty of local crews to bid.

For construction laborers (47-2061, weighted 30%) the local median is $22.31 an hour, which is in line with the national $22.66. The middle half of them earn between $18.74 and $26.80 an hour. BLS counts 3,140 of them working in the area, 115.7 for every 10,000 jobs (US: 70.5), so the local bench is deeper than average.

Operating engineers and other construction equipment operators (47-2073), 30% of the weighting: a median of $28.96 an hour, in line with the US median of $28.78. The middle half of them earn between $24.54 and $31.46 an hour. About 1,160 work in the metro. That is 42.7 per 10,000 jobs, compared with 30.7 nationally, which suggests plenty of local crews to bid.

A quick sensitivity check: moving the lead trade (paving, surfacing and tamping equipment operators) from the median to the 75th percentile wage adds about $200 to the midpoint estimate; the 25th percentile takes off about $5. That is a swing of roughly 0.1% to 4.0% of the total, which is useful for judging whether a bid reflects wages or something else, such as scope or margin.

Ogden has 271,370 jobs in total (BLS, May 2025), ranking 95th by size among the 300 metros on this site.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Paving, surfacing and tamping equipment operators (47-2071)40%$22.05$22.17$28.14$25.640.86metro
Construction laborers (47-2061)30%$18.74$22.31$26.80$22.660.98metro
Operating engineers and other construction equipment operators (47-2073)30%$24.54$28.96$31.46$28.781.01metro
Blended100%0.94

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $4,150 to $5,850 for Ogden, UT is attached.

A detailed PDF report of this estimate, $9

Multi-page report for Ogden, UT: low, typical and high cost, a line-item breakdown of materials and labor by trade, permit notes, the best months to schedule, a quote comparison sheet, red flags, questions for contractors, checklists and every source. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Asphalt driveway in Ogden: your questions

+How much does it cost to pave a driveway in Ogden?

For 600 sq ft, expect $2,900 to $7,100 in the Ogden area. A standard-spec job lands at $4,150 to $5,850. Small jobs usually cost more per sq ft and large ones less.

+What is the price per sq ft for asphalt driveway in Ogden?

About $4.80 to $11.50 per sq ft for materials and labor, plus $50 to $200 for the permit if one is needed. The US range is $5 to $12.

+Is asphalt driveway cheaper in Ogden or Logan?

Logan is 55 miles away. The midpoint for 600 sq ft there is $5,000, which is 0% less than Ogden ($5,000). Wage and materials indexes both feed that gap.

+How much of the bill is labor in Ogden?

About 40% at the midpoint, or $2,000 out of $5,000. Materials are 57% and permits 3%. Nationally, labor is 41%.

+What would 2-car (20x30), 600 sq ft cost in Ogden?

$2,900 to $7,100. Pick a different size in the estimator above to get your own number.

+Does asphalt driveway need a permit in Ogden?

Often, but rules are set by your city or county building office, so call before you hire. Budget $50 to $200 for fees in the Ogden area (our national range of $50 to $200 scaled by the local price level).

+Is Ogden expensive for asphalt driveway compared with the rest of Utah?

Ogden is 1% below the Utah statewide estimate ($5,050 at the midpoint). We cover 5 metros in Utah; see the state page to compare them.

+What do paving, surfacing and tamping equipment operators earn in Ogden?

The BLS median is $22.17 an hour in the Ogden area, compared with $25.64 nationally. The 25th to 75th percentile range is $22.05 to $28.14.

+What do basic and premium asphalt driveway work cost in Ogden?

For 600 sq ft, basic work runs $2,900 to $4,600 and premium work $5,400 to $7,100. Basic means: new topcoat over a sound base, flat lot. Premium means: full tear-out and rebuild, drainage work, heavy-duty depth.

+When is the best time to pave a driveway in Ogden?

Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are March through June and August through October. August and September are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.

+What does "add a sealcoat" add in Ogden?

$570 to $1,150 for 600 sq ft, from a national range scaled by the local wage and goods indexes.

Asphalt driveway near Ogden

Asphalt driveway: all pricesAsphalt driveway in UtahAll projects in OgdenUtah cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.

Note on derived figures: Materials = hot-mix asphalt ($2.30-$3.60/sq ft at 3 in) plus aggregate base ($1-$3/sq ft) from PaveGauge's component table.