Asphalt driveway cost in Orlando, FL
Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.
- Typical range (600 sq ft)
- $2,850 – $6,850
- Per sq ft
- $4.65 – $11
- before permit
- Versus US midpoint
- −7%
- US $5,250
- Rank of 300 metros
- #224
- 1 = most expensive
Orlando homeowners pay roughly $2,850 to $6,850 to pave a driveway at 600 sq ft, or $4.65 to $11 per sq ft (permit not included). Against the US midpoint, Orlando is 7% lower. Paving, surfacing and tamping equipment operators earn a median of $22.78 an hour in the Orlando area, 11% below the US median of $25.64.
Estimate your asphalt driveway cost
Pick a size, a quality level and where you live. Prices update as you type.
Estimated cost for 600 sq ft in Orlando, FL, standard level
$4,050 to $5,650
About $6.60 to $9.15 per sq ft before permits. Labor is about 38% of the bill.
| Part | Low | High |
|---|---|---|
| Materials | $2,500 | $3,250 |
| Labor | $1,450 | $2,250 |
| Permits and fees | $95 | $160 |
| Total | $4,050 | $5,650 |
Cost breakdown for 600 sq ft in Orlando, FL
| Part of the job | Low | Midpoint | High | Share |
|---|---|---|---|---|
| Materials | $1,900 | $2,850 | $3,800 | 59% |
| Labor | $890 | $1,850 | $2,800 | 38% |
| Permits and fees | $50 | $130 | $200 | 3% |
| Total | $2,850 | $4,850 | $6,850 | 100% |
Where the Orlando price comes from
The wage side of the estimate leans on paving, surfacing and tamping equipment operators, who do 40% of the hours on a typical job. Their local median is $22.78 an hour. Add the other trades involved and the blended wage index for Orlando is 0.87 (US = 1.00), which puts labor at 38% of the total.
On the materials line, the BEA goods price index for the Orlando metro is 96.2 (US = 100). The midpoint materials bill for 600 sq ft comes to $2,850, compared with $2,950 at national prices. Permit and inspection fees are scaled by the broader index (101.4) and land at $50 to $200.
Why two Orlando quotes can differ
Sealcoating
Sealing is $1-$2 per sq ft and is a maintenance cost, not part of the install.
New versus overlay
Resurfacing an existing driveway runs $3-$7 per sq ft; a full new driveway runs $5-$12+ (HomeGuide). Tearing out and replacing one is higher still.
Base work
Four to eight inches of compacted aggregate under the asphalt is where cheap quotes cut corners. Base typically runs $1-$3 per sq ft.
Pick a size, pick a tier: asphalt driveway pricing in Orlando
Three bands are cut from the same cited range and localized for Orlando wages and prices. They overlap on purpose: a good standard job and a modest premium job can cost the same. The grid below prices the same bands at 4 common sizes.
Basic
$2,850 to $4,450
New topcoat over a sound base, flat lot
Standard
$4,050 to $5,650
Full new driveway: base, 2-3 in of hot mix, edging
Premium
$5,250 to $6,850
Full tear-out and rebuild, drainage work, heavy-duty depth
| Size | Basic | Standard | Premium |
|---|---|---|---|
| 1-car (12x20), 240 sq ft | $1,150 – $1,850 | $1,650 – $2,350 | $2,200 – $2,850 |
| 20x20 (400 sq ft) | $1,900 – $3,000 | $2,750 – $3,800 | $3,550 – $4,650 |
| 2-car (20x30), 600 sq ft | $2,850 – $4,450 | $4,050 – $5,650 | $5,250 – $6,850 |
| long rural (10x100), 1,000 sq ft | $4,700 – $7,350 | $6,650 – $9,300 | $8,650 – $11,300 |
When to schedule asphalt driveway in Orlando
We use NOAA's 1991-2020 climate normals for Orlando Intl Ap (5 miles from the city center). These are 30-year monthly averages, not forecasts.
October through May is the stretch where digging, grading and setting material in the ground runs into the fewest weather problems in Orlando (8 of 12 months). June, July, August and September have an average daytime high of 90°F or more.
Orlando gets about 51 inches of precipitation in a normal year. The wettest months are June, July and August (8.1 inches in June). Inside the workable window, February and November are the driest, at 2.0 and 1.8 inches. The station averages about 110 days a year at 90°F or above.
Does the season change the price? Probably, but we do not have a sourced seasonal price curve, so the estimator shows a year-round figure and does not adjust by month. When you collect quotes, ask whether scheduling in a slower month gets a better rate.
| Month | Avg high °F | Avg low °F | Precip (in) | For this job |
|---|---|---|---|---|
| Jan | 72 | 50 | 2.5 | Workable |
| Feb | 75 | 52 | 2.0 | Workable |
| Mar | 79 | 56 | 3.0 | Workable |
| Apr | 84 | 61 | 2.6 | Workable |
| May | 88 | 66 | 4.0 | Workable |
| Jun | 91 | 72 | 8.1 | Hot |
| Jul | 92 | 73 | 7.5 | Hot |
| Aug | 92 | 74 | 7.7 | Hot |
| Sep | 90 | 72 | 6.4 | Hot |
| Oct | 85 | 66 | 3.5 | Workable |
| Nov | 78 | 58 | 1.8 | Workable |
| Dec | 74 | 53 | 2.5 | Workable |
Is Orlando cheap or dear? The local comparison
Contractors rarely work more than an hour or two from home, so the neighboring metros set a rough ceiling and floor for your quotes. Midpoints for 600 sq ft range from $4,750 to $4,850 across Orlando and its five closest metros.
| Area | Range | Midpoint | vs. here |
|---|---|---|---|
| Orlando, FLthis page | $2,850 – $6,850 | $4,850 | |
| Lakeland, FL40 miles | $2,800 – $6,650 | $4,750 | −2% |
| Palm Bay, FL40 miles | $2,850 – $6,850 | $4,850 | level |
| Deltona, FL50 miles | $2,850 – $6,900 | $4,850 | +1% |
| Ocala, FL65 miles | $2,800 – $6,700 | $4,750 | −2% |
| Sebastian, FL70 miles | $2,850 – $6,900 | $4,850 | +1% |
| Florida (statewide) | $2,900 – $6,950 | $4,900 | +2% |
| United States | $3,050 – $7,400 | $5,250 | +8% |
Across 300 US metros, Orlando comes in at #224 from the top. The priciest is Kahului, HI at $7,650; the cheapest is Fort Smith, AR at $4,450 (midpoints, 600 sq ft). Statewide, Orlando is 1% below the Florida figure.
Other Florida metros
| Metro | Size | Range | Midpoint | vs. here |
|---|---|---|---|---|
| Miami, FL | 2,819,940 jobs | $3,050 – $7,250 | $5,150 | +6% |
| Tampa, FL | 1,447,120 jobs | $2,850 – $6,850 | $4,850 | level |
| Jacksonville, FL | 765,930 jobs | $2,850 – $6,850 | $4,850 | level |
| North Port, FL | 339,940 jobs | $2,850 – $6,950 | $4,900 | +1% |
| Cape Coral, FL | 304,790 jobs | $2,850 – $6,850 | $4,850 | level |
| Lakeland, FL | 265,280 jobs | $2,800 – $6,650 | $4,750 | −2% |
Cities with a workforce like Orlando's
Big cities and small ones price differently, so here is Orlando against the 4 metros with the closest total employment.
| Metro | Size | Range | Midpoint | vs. here |
|---|---|---|---|---|
| Tampa, FL | 1,447,120 jobs | $2,850 – $6,850 | $4,850 | level |
| Charlotte, NC | 1,358,370 jobs | $2,900 – $6,950 | $4,900 | +2% |
| San Diego, CA | 1,538,060 jobs | $3,500 – $8,600 | $6,050 | +25% |
| Baltimore, MD | 1,356,680 jobs | $3,150 – $7,650 | $5,400 | +12% |
Related projects, priced for Orlando
Because every project leans on different trades, Orlando's wage level does not move all prices equally. Against the US midpoint, French drain runs −8% and concrete driveway −12%.
| Project | Size | Range | vs. US |
|---|---|---|---|
| Concrete driveway | 600 sq ft | $3,250 – $8,100 | −12% |
| Gravel driveway | 1,000 sq ft | $2,250 – $9,300 | −9% |
| Paver patio | 300 sq ft | $2,700 – $4,950 | −10% |
| French drain | 60 linear ft | $550 – $1,950 | −8% |
| Concrete slab | 400 sq ft | $2,200 – $4,800 | −8% |
| Concrete patio | 300 sq ft | $1,150 – $3,600 | −9% |
Local wages behind the labor line
Wages are the part of this estimate that changes most from town to town. 3 trades carry the job here, and each is compared with its US median. The weighted result for Orlando is 0.87 times the national level.
For paving, surfacing and tamping equipment operators (47-2071, weighted 40%) the local median is $22.78 an hour, which is 11% below the national $25.64. The middle half of them earn between $18.79 and $26.44 an hour. BLS counts 370 of them working in the area, 2.6 for every 10,000 jobs (US: 2.7), so the local bench is about average.
Construction laborers (47-2061), 30% of the weighting: a median of $19.66 an hour, 13% below the US median of $22.66. The middle half of them earn between $17.62 and $22.55 an hour. About 12,290 work in the metro. That is 87.1 per 10,000 jobs, compared with 70.5 nationally, which suggests plenty of local crews to bid.
For operating engineers and other construction equipment operators (47-2073, weighted 30%) the local median is $24.53 an hour, which is 15% below the national $28.78. The middle half of them earn between $22.61 and $27.47 an hour. BLS counts 4,330 of them working in the area, 30.7 for every 10,000 jobs (US: 30.7), so the local bench is about average.
Quotes come from real crews, not medians. If the paving, surfacing and tamping equipment operators on your job are paid at the 75th percentile ($26.44 an hour) instead of the median, the labor line grows by about $120. At the 25th percentile ($18.79) it shrinks by about $130. The total moves by 2.5% or 2.7%, so wages alone rarely explain a quote that is far outside our range.
For context on the local economy, BLS counts 1,411,730 jobs in the Orlando-Kissimmee-Sanford area. That makes it the 20th largest of the 300 metros we cover, with 0.91% of US employment.
| Trade | Weight | 25th pct | Median | 75th pct | US median | Ratio | Level used |
|---|---|---|---|---|---|---|---|
| Paving, surfacing and tamping equipment operators (47-2071) | 40% | $18.79 | $22.78 | $26.44 | $25.64 | 0.89 | metro |
| Construction laborers (47-2061) | 30% | $17.62 | $19.66 | $22.55 | $22.66 | 0.87 | metro |
| Operating engineers and other construction equipment operators (47-2073) | 30% | $22.61 | $24.53 | $27.47 | $28.78 | 0.85 | metro |
| Blended | 100% | 0.87 | |||||
Extras that change the Orlando total
Extras are quoted nationally and then scaled to Orlando by the average of the local wage index (0.87) and goods index (0.96), a factor of 0.92. Tick any of them in the estimator above to add them to your total. Treat these as planning figures: an add-on touches different trades than the main job, so the scaling is an approximation.
| Add-on | Local range |
|---|---|
| Add a sealcoat | $550 – $1,100 |
Get 3 local quotes
Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $4,050 to $5,650 for Orlando, FL is attached.
A detailed PDF report of this estimate, $9
Multi-page report for Orlando, FL: low, typical and high cost, a line-item breakdown of materials and labor by trade, permit notes, the best months to schedule, a quote comparison sheet, red flags, questions for contractors, checklists and every source. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.
Asphalt driveway in Orlando: your questions
+How much does it cost to pave a driveway in Orlando?
For 600 sq ft, expect $2,850 to $6,850 in the Orlando area. A standard-spec job lands at $4,050 to $5,650. Small jobs usually cost more per sq ft and large ones less.
+What is the price per sq ft for asphalt driveway in Orlando?
About $4.65 to $11 per sq ft for materials and labor, plus $50 to $200 for the permit if one is needed. The US range is $5 to $12.
+Is asphalt driveway cheaper in Orlando or Lakeland?
Lakeland is 40 miles away. The midpoint for 600 sq ft there is $4,750, which is 2% less than Orlando ($4,850). Wage and materials indexes both feed that gap.
+How much of the bill is labor in Orlando?
About 38% at the midpoint, or $1,850 out of $4,850. Materials are 59% and permits 3%. Nationally, labor is 41%.
+What would 2-car (20x30), 600 sq ft cost in Orlando?
$2,850 to $6,850. Pick a different size in the estimator above to get your own number.
+Does asphalt driveway need a permit in Orlando?
Often, but rules are set by your city or county building office, so call before you hire. Budget $50 to $200 for fees in the Orlando area (our national range of $50 to $200 scaled by the local price level).
+Is Orlando expensive for asphalt driveway compared with the rest of Florida?
Orlando is 1% below the Florida statewide estimate ($4,900 at the midpoint). We cover 19 metros in Florida; see the state page to compare them.
+What do paving, surfacing and tamping equipment operators earn in Orlando?
The BLS median is $22.78 an hour in the Orlando area, compared with $25.64 nationally. The 25th to 75th percentile range is $18.79 to $26.44.
+What do basic and premium asphalt driveway work cost in Orlando?
For 600 sq ft, basic work runs $2,850 to $4,450 and premium work $5,250 to $6,850. Basic means: new topcoat over a sound base, flat lot. Premium means: full tear-out and rebuild, drainage work, heavy-duty depth.
+When is the best time to pave a driveway in Orlando?
Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are October through May. February and November are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.
+What does "add a sealcoat" add in Orlando?
$550 to $1,100 for 600 sq ft, from a national range scaled by the local wage and goods indexes.
Asphalt driveway near Orlando
Where these numbers come from
Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.
- HomeGuide: How Much Does Paving an Asphalt Driveway Cost? (2026) (accessed November 4, 2026)
- PaveGauge: Asphalt Driveway Cost (2026): Price by Size (accessed November 4, 2026)
- HomeGuide: 2026 Building Permit Costs | Fees & Cost Calculator (accessed November 4, 2026)
- BLS Occupational Employment and Wage Statistics, May 2025
- BEA Regional Price Parities, 2024
- NOAA NCEI U.S. Climate Normals, 1991-2020
Note on derived figures: Materials = hot-mix asphalt ($2.30-$3.60/sq ft at 3 in) plus aggregate base ($1-$3/sq ft) from PaveGauge's component table.