Typical range (300 sq ft)
$8,600 – $17,200
Per sq ft
$28.50 – $57
before permit
Versus US midpoint
+14%
US $11,400
Rank of 300 metros
#13
1 = most expensive

A wood deck in Seattle, WA usually costs $8,600 to $17,200 for 300 sq ft. That works out to about $28.50 to $57 per sq ft before permits. Compared with the national midpoint that is $1,550 more. Carpenters earn a median of $36.74 an hour in the Seattle area, 26% above the US median of $29.12.

Estimate your wood deck cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

Cedar or upgraded pine, stairs and a railing

Add-ons

Estimated cost for 300 sq ft in Seattle, WA, standard level

$11,200 to $14,600

About $37 to $48.50 per sq ft before permits. Labor is about 48% of the bill.

Cost breakdown
PartLowHigh
Materials$5,700$7,400
Labor$5,400$7,100
Permits and fees$90$130
Total$11,200$14,600
Save and get a PDF report

Cost breakdown for 300 sq ft in Seattle, WA

Part of the jobLowMidpointHighShare
Materials$4,350$6,550$8,75051%
Labor$4,150$6,250$8,35048%
Permits and fees$55$110$1701%
Total$8,600$12,900$17,200100%

Why Seattle prices look the way they do

Labor is 48% of the midpoint bill here, against 44% nationally. The mix of trades behind this job is carpenters (80%), construction laborers (20%). We weight each trade's local median wage by that share and compare it with the national median. In Seattle the blended ratio comes out at 1.26.

Materials are scaled with BEA's regional price parity for goods. Seattle is at 104.0 against 100 for the US, so a materials line of $6,300 nationally becomes $6,550 here (midpoint, 300 sq ft). Permits follow the all-items index of 111.1: $55 to $170.

Seattle against nearby metros and the rest of Washington

Of the five closest metros, all are cheaper than Seattle. Yakima is the lowest at about $11,900 (midpoint, 300 sq ft), 90 miles away.

Comparison with nearby areas
AreaRangeMidpointvs. here
Seattle, WAthis page$8,600 – $17,200$12,900
Bremerton, WA40 miles$8,050 – $16,200$12,100−6%
Olympia, WA60 miles$7,950 – $16,000$12,000−7%
Yakima, WA90 miles$7,900 – $15,900$11,900−8%
Bellingham, WA95 miles$8,450 – $17,000$12,700−1%
Portland, OR135 miles$8,450 – $16,900$12,700−2%
Washington (statewide)$8,500 – $17,000$12,700−1%
United States$7,550 – $15,200$11,400−12%

Out of the 300 metros we cover, Seattle ranks #13 for the cost of this job (#1 is the most expensive). Statewide, Seattle is 1% above the Washington figure.

Elsewhere in Washington

Washington metros compared with Seattle
MetroSizeRangeMidpointvs. here
Spokane, WA255,820 jobs$7,850 – $15,800$11,800−8%
Olympia, WA130,300 jobs$7,950 – $16,000$12,000−7%
Kennewick, WA129,490 jobs$8,050 – $16,100$12,100−7%
Yakima, WA97,010 jobs$7,900 – $15,900$11,900−8%
Bremerton, WA93,740 jobs$8,050 – $16,200$12,100−6%
Bellingham, WA91,390 jobs$8,450 – $17,000$12,700−1%

Metros of a similar size

Big cities and small ones price differently, so here is Seattle against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
San Francisco, CA2,373,920 jobs$9,500 – $19,100$14,300+11%
Minneapolis, MN1,951,650 jobs$8,500 – $17,000$12,700−1%
Phoenix, AZ2,375,760 jobs$7,350 – $14,700$11,000−15%
Detroit, MI1,904,530 jobs$7,850 – $15,800$11,800−8%

Wood deck: what moves the price in Seattle

  • Railing

    A wood or vinyl railing adds $20-$60 per linear foot.

  • Replacement versus new

    Deck replacement costs $30-$55 per sq ft because of demolition and haul-away.

  • Permit

    Deck permits average $50-$150. Many cities skip the permit for small, low, freestanding decks.

What local crews earn in Seattle

The labor line is built from BLS wage data, one trade at a time. This job draws on 2 trades. We compare each trade's local median with the US median, weight the ratios by how much of the job each trade does, and apply the blend to the national labor cost. For Seattle the blend is 1.26.

Carpenters (47-2031), 80% of the weighting: a median of $36.74 an hour, 26% above the US median of $29.12. The middle half of them earn between $30.64 and $47.93 an hour. About 14,970 work in the metro. That is 71.8 per 10,000 jobs, compared with 43.1 nationally, which suggests plenty of local crews to bid.

For construction laborers (47-2061, weighted 20%) the local median is $28.72 an hour, which is 27% above the national $22.66. The middle half of them earn between $23.67 and $37.03 an hour. BLS counts 13,040 of them working in the area, 62.5 for every 10,000 jobs (US: 70.5), so the local bench is about average.

A quick sensitivity check: moving the lead trade (carpenters) from the median to the 75th percentile wage adds about $1,500 to the midpoint estimate; the 25th percentile takes off about $830. That is a swing of roughly 6.4% to 11.8% of the total, which is useful for judging whether a bid reflects wages or something else, such as scope or margin.

Seattle-Tacoma-Bellevue has 2,086,210 jobs in total (BLS, May 2025), ranking 13th by size among the 300 metros on this site.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Carpenters (47-2031)80%$30.64$36.74$47.93$29.121.26metro
Construction laborers (47-2061)20%$23.67$28.72$37.03$22.661.27metro
Blended100%1.26

Seattle weather and the wood deck calendar

Climate numbers on this page come from NOAA's 1991-2020 U.S. Climate Normals at the nearest suitable station, Seattle Sand Pt Wsfo (5 miles from the city center). They are 30-year averages, so any one year can run hotter, colder or wetter.

Weather is not a serious constraint for exterior installation in Seattle: no month in the averages is cold enough (an average daytime high under 45°F) or hot enough (an average daytime high of 90°F or more) to rule it out, so the workable window is all year.

Seattle gets about 38 inches of precipitation in a normal year, including roughly 4 inches of snow. The wettest months are January, November and December (5.8 inches in November). The station averages about 2 days a year at 90°F or above.

We do not adjust the estimate by month, because we have no reliable published data on seasonal pricing. It is still worth asking contractors whether an off-peak start date changes their bid.

Monthly normals, Seattle Sand Pt Wsfo (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan47375.1Workable
Feb50373.5Workable
Mar54393.9Workable
Apr59433.0Workable
May65482.2Workable
Jun70531.6Workable
Jul77570.8Workable
Aug77571.0Workable
Sep71531.7Workable
Oct61473.6Workable
Nov52415.8Workable
Dec47375.5Workable

Pick a size, pick a tier: wood deck pricing in Seattle

The cited range is split into basic, standard and premium bands, then scaled to Seattle. Bands overlap, because plenty of standard jobs cost as much as a light premium one. Sizes run from 10x12 (120 sq ft) to 20x20 (400 sq ft).

Basic

$8,600 to $12,000

Pressure-treated pine, low to the ground, simple rectangle

Standard

$11,200 to $14,600

Cedar or upgraded pine, stairs and a railing

Premium

$13,800 to $17,200

Hardwood decking, multi-level, built-in features

Cost by size and quality level
SizeBasicStandardPremium
10x12 (120 sq ft)$3,450 – $4,900$4,550 – $5,950$5,600 – $7,000
12x12 (144 sq ft)$4,150 – $5,850$5,400 – $7,100$6,700 – $8,350
16x20 (320 sq ft)$9,150 – $12,800$11,900 – $15,600$14,700 – $18,400
20x20 (400 sq ft)$11,400 – $16,000$14,900 – $19,500$18,300 – $22,900

What nearby projects cost in Seattle

Jobs that often go together with wood deck are priced below at their usual sizes, using the same Seattle wage and price inputs. Compared with national midpoints, paver patio comes out highest (+23%) and composite deck lowest (+17%); the gap comes from the trades each job uses.

Related projects with local prices
ProjectSizeRangevs. US
Composite deck300 sq ft$14,100 – $28,300+17%
Concrete patio300 sq ft$1,450 – $4,950+22%
Paver patio300 sq ft$3,700 – $6,750+23%
Detached garage576 sq ft$34,000 – $68,200+17%

Optional extras in Seattle

Add-ons start from national price ranges and are scaled by 1.15 for Seattle, which is the average of the area's wage index (1.26) and goods price index (1.04). The estimator above can add them to your total.

Add-on prices
Add-onLocal range
Add stairs (flat)$1,600 – $3,000

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $11,200 to $14,600 for Seattle, WA is attached.

Take this estimate with you: PDF report, $9

Multi-page report for Seattle, WA: low, typical and high cost, a line-item breakdown of materials and labor by trade, permit notes, the best months to schedule, a quote comparison sheet, red flags, questions for contractors, checklists and every source. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Wood deck in Seattle: your questions

+How much does it cost to build a wood deck in Seattle?

For 300 sq ft, expect $8,600 to $17,200 in the Seattle area. A standard-spec job lands at $11,200 to $14,600. Small jobs usually cost more per sq ft and large ones less.

+What is the price per sq ft for wood deck in Seattle?

About $28.50 to $57 per sq ft for materials and labor, plus $55 to $170 for the permit if one is needed. The US range is $25 to $50.

+Is wood deck cheaper in Seattle or Bremerton?

Bremerton is 40 miles away. The midpoint for 300 sq ft there is $12,100, which is 6% less than Seattle ($12,900). Wage and materials indexes both feed that gap.

+How much of the bill is labor in Seattle?

About 48% at the midpoint, or $6,250 out of $12,900. Materials are 51% and permits 1%. Nationally, labor is 44%.

+What would 16x20 (320 sq ft) cost in Seattle?

$9,150 to $18,400. Pick a different size in the estimator above to get your own number.

+Does wood deck need a permit in Seattle?

Often, but rules are set by your city or county building office, so call before you hire. Budget $55 to $170 for fees in the Seattle area (our national range of $50 to $150 scaled by the local price level).

+Is Seattle expensive for wood deck compared with the rest of Washington?

Seattle is 1% above the Washington statewide estimate ($12,700 at the midpoint). We cover 7 metros in Washington; see the state page to compare them.

+What do carpenters earn in Seattle?

The BLS median is $36.74 an hour in the Seattle area, compared with $29.12 nationally. The 25th to 75th percentile range is $30.64 to $47.93.

+What do basic and premium wood deck work cost in Seattle?

For 300 sq ft, basic work runs $8,600 to $12,000 and premium work $13,800 to $17,200. Basic means: pressure-treated pine, low to the ground, simple rectangle. Premium means: hardwood decking, multi-level, built-in features.

+Is there a bad season to build a wood deck in Seattle?

Not from a temperature point of view. NOAA's 1991-2020 normals show no month with a freezing-level overnight low or a 90°F-plus average high, so timing is mostly about contractor availability and rain.

+What does "add stairs" add in Seattle?

$1,600 to $3,000, from a national range scaled by the local wage and goods indexes.

Wood deck near Seattle

Wood deck: all pricesWood deck in WashingtonAll projects in SeattleWashington cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.