Skip to content
CostLocal

Wood deck cost in Prescott Valley, AZ

Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.

Typical range (300 sq ft)
$7,200 – $14,500
Per sq ft
$24 – $47.50
before permit
Versus US midpoint
−5%
US $11,400
Rank of 300 metros
#151
1 = most expensive

Prescott Valley homeowners pay roughly $7,200 to $14,500 to build a wood deck at 300 sq ft, or $24 to $47.50 per sq ft (permit not included). Against the US midpoint, Prescott Valley is 5% lower. Carpenters earn a median of $27.20 an hour in the Prescott Valley area, 7% below the US median of $29.12.

Estimate your wood deck cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

Cedar or upgraded pine, stairs and a railing

Add-ons

Estimated cost for 300 sq ft in Prescott Valley, AZ, standard level

$9,400 to $12,300

About $31 to $40.50 per sq ft before permits. Labor is about 43% of the bill.

Cost breakdown
PartLowHigh
Materials$5,250$6,850
Labor$4,050$5,300
Permits and fees$80$120
Total$9,400$12,300
Save and get a PDF report

Cost breakdown for 300 sq ft in Prescott Valley, AZ

Part of the jobLowMidpointHighShare
Materials$4,050$6,050$8,10056%
Labor$3,100$4,650$6,20043%
Permits and fees$50$100$1501%
Total$7,200$10,800$14,500100%

What is behind the Prescott Valley number

We price the labor side from BLS wage data for 2 trades: carpenters at 80%, construction laborers at 20%. Weighted together, Prescott Valley wages are 0.94 times the national level. Labor makes up about 43% of the midpoint estimate (44% at national prices).

On the materials line, the BEA goods price index for the Prescott Valley metro is 96.2 (US = 100). The midpoint materials bill for 300 sq ft comes to $6,050, compared with $6,300 at national prices. Permit and inspection fees are scaled by the broader index (98.3) and land at $50 to $150.

When to schedule wood deck in Prescott Valley

We use NOAA's 1991-2020 climate normals for Prescott Love Fld (5 miles from the city center). These are 30-year monthly averages, not forecasts.

August through June is the stretch where exterior installation runs into the fewest weather problems in Prescott Valley (11 of 12 months). July has an average daytime high of 90°F or more.

Prescott Valley gets about 13 inches of precipitation in a normal year. The wettest months are February, July and August (2.5 inches in August). Inside the workable window, April and June are the driest, at 0.5 and 0.3 inches. The station averages about 51 days a year at 90°F or above.

Does the season change the price? Probably, but we do not have a sourced seasonal price curve, so the estimator shows a year-round figure and does not adjust by month. When you collect quotes, ask whether scheduling in a slower month gets a better rate.

Monthly normals, Prescott Love Fld (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan53261.2Workable
Feb56291.3Workable
Mar62341.0Workable
Apr69390.5Workable
May77470.5Workable
Jun88560.3Workable
Jul90631.9Hot
Aug88612.5Workable
Sep83541.3Workable
Oct73420.8Workable
Nov62320.7Workable
Dec52261.0Workable

Local wages behind the labor line

Wages are the part of this estimate that changes most from town to town. 2 trades carry the job here, and each is compared with its US median. The weighted result for Prescott Valley is 0.94 times the national level.

For carpenters (47-2031, weighted 80%) the local median is $27.20 an hour, which is 7% below the national $29.12. The middle half of them earn between $22.69 and $30.34 an hour. BLS counts 440 of them working in the area, 60.9 for every 10,000 jobs (US: 43.1), so the local bench is deeper than average.

Construction laborers (47-2061), 20% of the weighting: a median of $22.17 an hour, in line with the US median of $22.66. The middle half of them earn between $18.09 and $23.38 an hour. About 1,100 work in the metro. That is 152.1 per 10,000 jobs, compared with 70.5 nationally, which suggests plenty of local crews to bid.

Quotes come from real crews, not medians. If the carpenters on your job are paid at the 75th percentile ($30.34 an hour) instead of the median, the labor line grows by about $430. At the 25th percentile ($22.69) it shrinks by about $610. The total moves by 3.9% or 5.7%, so wages alone rarely explain a quote that is far outside our range.

For context on the local economy, BLS counts 72,300 jobs in the Prescott Valley-Prescott area. That makes it the 253rd largest of the 300 metros we cover, with 0.05% of US employment.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Carpenters (47-2031)80%$22.69$27.20$30.34$29.120.93metro
Construction laborers (47-2061)20%$18.09$22.17$23.38$22.660.98metro
Blended100%0.94

Prescott Valley against nearby metros and the rest of Arizona

Same job, same size (300 sq ft), priced for the nearest metros. Las Vegas is the priciest of the group at $11,300. Lake Havasu City is the cheapest at $10,100.

Comparison with nearby areas
AreaRangeMidpointvs. here
Prescott Valley, AZthis page$7,200 – $14,500$10,800
Flagstaff, AZ95 miles$7,200 – $14,400$10,800level
Lake Havasu City, AZ100 miles$6,750 – $13,500$10,100−6%
Phoenix, AZ105 miles$7,350 – $14,700$11,000+2%
Yuma, AZ150 miles$6,800 – $13,600$10,200−6%
Las Vegas, NV175 miles$7,500 – $15,000$11,300+4%
Arizona (statewide)$7,250 – $14,600$10,900+1%
United States$7,550 – $15,200$11,400+5%

Across 300 US metros, Prescott Valley comes in at #151 from the top. The priciest is Honolulu, HI at $14,900; the cheapest is Brownsville, TX at $9,050 (midpoints, 300 sq ft). Statewide, Prescott Valley is 1% below the Arizona figure.

Other Arizona metros

Arizona metros compared with Prescott Valley
MetroSizeRangeMidpointvs. here
Phoenix, AZ2,375,760 jobs$7,350 – $14,700$11,000+2%
Tucson, AZ389,630 jobs$6,850 – $13,800$10,300−5%
Yuma, AZ68,880 jobs$6,800 – $13,600$10,200−6%
Flagstaff, AZ66,610 jobs$7,200 – $14,400$10,800level
Lake Havasu City, AZ56,490 jobs$6,750 – $13,500$10,100−6%

Cities with a workforce like Prescott Valley's

Big cities and small ones price differently, so here is Prescott Valley against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
Auburn, AL72,710 jobs$6,650 – $13,400$10,000−7%
Coeur d'Alene, ID72,280 jobs$7,250 – $14,500$10,900+1%
Bloomington, IN73,240 jobs$7,350 – $14,800$11,100+2%
Bangor, ME72,270 jobs$7,250 – $14,500$10,900+1%

Specs and site conditions that change a Prescott Valley bid

  • Wood species

    Pressure-treated pine is the cheapest at $25-$50 per sq ft installed. Ipe runs $50-$70 and bamboo $27-$52 (HomeGuide).

  • Height and stairs

    A second-story deck needs more structure. New stairs run $1,400-$2,600 installed.

  • Railing

    A wood or vinyl railing adds $20-$60 per linear foot.

Related projects, priced for Prescott Valley

Because every project leans on different trades, Prescott Valley's wage level does not move all prices equally. Against the US midpoint, paver patio runs −3% and concrete patio −6%.

Related projects with local prices
ProjectSizeRangevs. US
Composite deck300 sq ft$11,500 – $23,000−5%
Concrete patio300 sq ft$1,200 – $3,750−6%
Paver patio300 sq ft$2,900 – $5,300−3%
Detached garage576 sq ft$27,300 – $54,800−6%

Add-ons priced for Prescott Valley

Extras are quoted nationally and then scaled to Prescott Valley by the average of the local wage index (0.94) and goods index (0.96), a factor of 0.95. Tick any of them in the estimator above to add them to your total. Treat these as planning figures: an add-on touches different trades than the main job, so the scaling is an approximation.

Add-on prices
Add-onLocal range
Add stairs (flat)$1,350 – $2,500

Pick a size, pick a tier: wood deck pricing in Prescott Valley

Three bands are cut from the same cited range and localized for Prescott Valley wages and prices. They overlap on purpose: a good standard job and a modest premium job can cost the same. The grid below prices the same bands at 4 common sizes.

Basic

$7,200 to $10,100

Pressure-treated pine, low to the ground, simple rectangle

Standard

$9,400 to $12,300

Cedar or upgraded pine, stairs and a railing

Premium

$11,600 to $14,500

Hardwood decking, multi-level, built-in features

Cost by size and quality level
SizeBasicStandardPremium
10x12 (120 sq ft)$2,900 – $4,100$3,800 – $5,000$4,700 – $5,850
12x12 (144 sq ft)$3,500 – $4,900$4,550 – $5,950$5,600 – $7,000
16x20 (320 sq ft)$7,700 – $10,800$10,000 – $13,100$12,300 – $15,400
20x20 (400 sq ft)$9,600 – $13,400$12,500 – $16,300$15,400 – $19,200

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $9,400 to $12,300 for Prescott Valley, AZ is attached.

Take this estimate with you: PDF report, $9

The report lays out the wood deck numbers for Prescott Valley, AZ line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Wood deck in Prescott Valley: your questions

+How much does it cost to build a wood deck in Prescott Valley?

For 300 sq ft, expect $7,200 to $14,500 in the Prescott Valley area. A standard-spec job lands at $9,400 to $12,300. Small jobs usually cost more per sq ft and large ones less.

+What is the price per sq ft for wood deck in Prescott Valley?

About $24 to $47.50 per sq ft for materials and labor, plus $50 to $150 for the permit if one is needed. The US range is $25 to $50.

+Is wood deck cheaper in Prescott Valley or Flagstaff?

Flagstaff is 95 miles away. The midpoint for 300 sq ft there is $10,800, which is 0% less than Prescott Valley ($10,800). Wage and materials indexes both feed that gap.

+How much of the bill is labor in Prescott Valley?

About 43% at the midpoint, or $4,650 out of $10,800. Materials are 56% and permits 1%. Nationally, labor is 44%.

+What would 16x20 (320 sq ft) cost in Prescott Valley?

$7,700 to $15,400. Pick a different size in the estimator above to get your own number.

+Does wood deck need a permit in Prescott Valley?

Often, but rules are set by your city or county building office, so call before you hire. Budget $50 to $150 for fees in the Prescott Valley area (our national range of $50 to $150 scaled by the local price level).

+Is Prescott Valley expensive for wood deck compared with the rest of Arizona?

Prescott Valley is 1% below the Arizona statewide estimate ($10,900 at the midpoint). We cover 6 metros in Arizona; see the state page to compare them.

+What do carpenters earn in Prescott Valley?

The BLS median is $27.20 an hour in the Prescott Valley area, compared with $29.12 nationally. The 25th to 75th percentile range is $22.69 to $30.34.

+What do basic and premium wood deck work cost in Prescott Valley?

For 300 sq ft, basic work runs $7,200 to $10,100 and premium work $11,600 to $14,500. Basic means: pressure-treated pine, low to the ground, simple rectangle. Premium means: hardwood decking, multi-level, built-in features.

+When is the best time to build a wood deck in Prescott Valley?

Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are August through June. April and June are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.

+What does "add stairs" add in Prescott Valley?

$1,350 to $2,500, from a national range scaled by the local wage and goods indexes.

Wood deck near Prescott Valley

Wood deck: all pricesWood deck in ArizonaAll projects in Prescott ValleyArizona cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.