Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.

Typical range (200 sq ft of wall face)
$6,900 – $13,100
Per sq ft of wall face
$34.50 – $63.50
before permit
Versus US midpoint
−2%
US $10,300
Rank of 300 metros
#158
1 = most expensive

Local price for a retaining wall in the Dover area: $6,900 to $13,100 for 200 sq ft of wall face. The low end is a basic job on easy ground; the high end is a premium spec with harder access. The midpoint lands close to the US figure. Building materials run about 4% below the US average here (BEA goods price index 96.4).

Estimate your retaining wall cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

Standard segmental block wall with drainage

Estimated cost for 200 sq ft of wall face in Dover, DE, standard level

$8,750 to $11,200

About $43 to $54.50 per sq ft of wall face before permits. Labor is about 47% of the bill.

Cost breakdown
PartLowHigh
Materials$4,150$6,050
Labor$4,450$4,850
Permits and fees$170$320
Total$8,750$11,200
Save and get a PDF report

Cost breakdown for 200 sq ft of wall face in Dover, DE

Part of the jobLowMidpointHighShare
Materials$2,700$5,100$7,50051%
Labor$4,150$4,650$5,15047%
Permits and fees$50$240$4402%
Total$6,900$10,000$13,100100%

Why Dover prices look the way they do

The wage side of the estimate leans on brickmasons and blockmasons, who do 50% of the hours on a typical job. Their local median is $32.00 an hour. Add the other trades involved and the blended wage index for Dover is 0.99 (US = 1.00), which puts labor at 47% of the total. BLS does not publish this trade for the metro, so we used the Delaware statewide median.

Materials are scaled with BEA's regional price parity for goods. Dover is at 96.4 against 100 for the US, so a materials line of $5,300 nationally becomes $5,100 here (midpoint, 200 sq ft of wall face). Permits follow the all-items index of 97.5: $50 to $440.

Data note: 50% of the labor weighting for this project uses a statewide median because BLS has no published metro figure for that trade in Dover. The wage table below marks each row.

Retaining wall: what moves the price in Dover

  • Rebuilding

    Replacing an old wall adds $15-$30 per linear foot for demolition plus disposal.

  • Permit

    Permits cost $50-$450 depending on location and wall size.

  • Height

    Walls over 4 feet need engineering, deeper excavation and more skilled labor; many cities require permits over 3-4 feet (HomeGuide).

Is Dover cheap or dear? The local comparison

Of the five closest metros, none is cheaper than Dover. Baltimore comes closest at about $10,200.

Comparison with nearby areas
AreaRangeMidpointvs. here
Dover, DEthis page$6,900 – $13,100$10,000
Vineland, NJ25 miles$8,750 – $15,500$12,200+21%
Atlantic City, NJ45 miles$8,000 – $14,600$11,300+13%
Philadelphia, PA55 miles$7,750 – $14,200$11,000+10%
Baltimore, MD60 miles$6,950 – $13,500$10,200+2%
Lancaster, PA75 miles$7,150 – $13,600$10,400+4%
Delaware (statewide)$7,000 – $13,300$10,100+1%
United States$7,050 – $13,500$10,300+2%

Out of the 300 metros we cover, Dover ranks #158 for the cost of this job (#1 is the most expensive). Statewide, Dover is 1% below the Delaware figure.

Dover is the only Delaware metro we cover, so the statewide page is the only in-state comparison. It uses statewide wages, which include rural areas.

Metros of a similar size

Big cities and small ones price differently, so here is Dover against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
Traverse City, MI68,440 jobs$7,550 – $13,800$10,600+6%
Burlington, NC67,830 jobs$6,300 – $12,300$9,300−7%
State College, PA68,840 jobs$7,500 – $14,000$10,800+8%
Winchester, VA67,740 jobs$6,450 – $12,500$9,500−5%

Who does the work: Dover trade wages

The labor line is built from BLS wage data, one trade at a time. This job draws on 3 trades. We compare each trade's local median with the US median, weight the ratios by how much of the job each trade does, and apply the blend to the national labor cost. For Dover the blend is 0.99.

Brickmasons and blockmasons (47-2021) carry 50% of the labor weighting. BLS does not publish this trade for the Dover metro, so we used the Delaware statewide median: $32.00 an hour against $29.87 for the US. The middle half of them earn between $26.93 and $40.12 an hour.

For construction laborers (47-2061, weighted 30%) the local median is $22.02 an hour, which is in line with the national $22.66. The middle half of them earn between $18.50 and $24.63 an hour. BLS counts 400 of them working in the area, 58.8 for every 10,000 jobs (US: 70.5), so the local bench is thinner than average.

Operating engineers and other construction equipment operators (47-2073), 20% of the weighting: a median of $23.49 an hour, 18% below the US median of $28.78. The middle half of them earn between $21.38 and $28.71 an hour. About 190 work in the metro. That is 27.9 per 10,000 jobs, compared with 30.7 nationally, so the supply of crews looks typical.

A quick sensitivity check: moving the lead trade (brickmasons and blockmasons) from the median to the 75th percentile wage adds about $640 to the midpoint estimate; the 25th percentile takes off about $400. That is a swing of roughly 4.0% to 6.4% of the total, which is useful for judging whether a bid reflects wages or something else, such as scope or margin.

Dover has 68,080 jobs in total (BLS, May 2025), ranking 265th by size among the 300 metros on this site.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Brickmasons and blockmasons (47-2021)50%$26.93$32.00$40.12$29.871.07state
Construction laborers (47-2061)30%$18.50$22.02$24.63$22.660.97metro
Operating engineers and other construction equipment operators (47-2073)20%$21.38$23.49$28.71$28.780.82metro
Blended100%0.99

Dover: what basic, standard and premium work costs

The cited range is split into basic, standard and premium bands, then scaled to Dover. Bands overlap, because plenty of standard jobs cost as much as a light premium one. Sizes run from short garden wall (4x25 ft), 100 sq ft of wall face to 40 ft x 6 ft (240 sq ft of wall face).

Basic

$6,900 to $9,400

Short block wall, easy access

Standard

$8,750 to $11,200

Standard segmental block wall with drainage

Premium

$10,600 to $13,100

Tall or stone wall, engineered, hard access

Cost by size and quality level
SizeBasicStandardPremium
short garden wall (4x25 ft), 100 sq ft of wall face$3,500 – $4,800$4,450 – $5,800$5,450 – $6,750
20 ft x 4 ft (80 sq ft of wall face)$2,800 – $3,900$3,600 – $4,700$4,400 – $5,500
40 ft x 4 ft (160 sq ft of wall face)$5,550 – $7,550$7,050 – $9,050$8,550 – $10,600
40 ft x 6 ft (240 sq ft of wall face)$8,300 – $11,200$10,500 – $13,400$12,700 – $15,600

Planning more than one job in Dover?

Jobs that often go together with retaining wall are priced below at their usual sizes, using the same Dover wage and price inputs. Compared with national midpoints, paver patio comes out highest (−2%) and concrete driveway lowest (−7%); the gap comes from the trades each job uses.

Related projects with local prices
ProjectSizeRangevs. US
French drain60 linear ft$580 – $2,050−3%
Paver patio300 sq ft$2,950 – $5,350−2%
Concrete driveway600 sq ft$3,400 – $8,600−7%
Sod installation1,500 sq ft$1,450 – $3,150−5%
Sprinkler system4,000 sq ft of lawn$3,750 – $9,400−6%
Inground pool450 sq ft$34,300 – $107,500−5%

The best months for retaining wall in Dover

Climate numbers on this page come from NOAA's 1991-2020 U.S. Climate Normals at the nearest suitable station, Dover (in the city). They are 30-year averages, so any one year can run hotter, colder or wetter.

For digging, grading and setting material in the ground, the comfortable months in Dover are March through November: 9 of 12. Outside them, January, February and December have an average overnight low at or below freezing (32°F).

In January, February and December the average low is at or below freezing, which means frozen ground and slower digging, compaction and sod or stone placement. NOAA counts about 79 days a year with a low at or below 32°F at this station.

Dover gets about 48 inches of precipitation in a normal year, including roughly 13 inches of snow. The wettest months are June, August and September (4.9 inches in August). Inside the workable window, April and November are the driest, at 3.7 and 3.4 inches. The station averages about 25 days a year at 90°F or above.

We do not adjust the estimate by month, because we have no reliable published data on seasonal pricing. It is still worth asking contractors whether an off-peak start date changes their bid.

Monthly normals, Dover (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan44283.4Cold
Feb47293.1Cold
Mar55354.2Workable
Apr66453.7Workable
May74543.9Workable
Jun83644.6Workable
Jul87694.1Workable
Aug85674.9Workable
Sep79614.3Workable
Oct69504.1Workable
Nov58393.4Workable
Dec49324.0Cold

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $8,750 to $11,200 for Dover, DE is attached.

Take this estimate with you: PDF report, $9

The report lays out the retaining wall numbers for Dover, DE line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Retaining wall in Dover: your questions

+How much does it cost to build a retaining wall in Dover?

For 200 sq ft of wall face, expect $6,900 to $13,100 in the Dover area. A standard-spec job lands at $8,750 to $11,200. Small jobs usually cost more per sq ft of wall face and large ones less.

+What is the price per sq ft of wall face for retaining wall in Dover?

About $34.50 to $63.50 per sq ft of wall face for materials and labor, plus $50 to $440 for the permit if one is needed. The US range is $35 to $65.

+Is retaining wall cheaper in Dover or Vineland?

Vineland is 25 miles away. The midpoint for 200 sq ft of wall face there is $12,200, which is 21% more than Dover ($10,000). Wage and materials indexes both feed that gap.

+How much of the bill is labor in Dover?

About 47% at the midpoint, or $4,650 out of $10,000. Materials are 51% and permits 2%. Nationally, labor is 46%.

+What would 40 ft x 4 ft (160 sq ft of wall face) cost in Dover?

$5,550 to $10,600. Pick a different size in the estimator above to get your own number.

+Does retaining wall need a permit in Dover?

Often, but rules are set by your city or county building office, so call before you hire. Budget $50 to $440 for fees in the Dover area (our national range of $50 to $450 scaled by the local price level).

+Is Dover expensive for retaining wall compared with the rest of Delaware?

Dover is 1% below the Delaware statewide estimate ($10,100 at the midpoint).

+What do brickmasons and blockmasons earn in Dover?

BLS has no published metro figure here, so we use the statewide median of $32.00 an hour, compared with $29.87 nationally. The 25th to 75th percentile range is $26.93 to $40.12.

+What do basic and premium retaining wall work cost in Dover?

For 200 sq ft of wall face, basic work runs $6,900 to $9,400 and premium work $10,600 to $13,100. Basic means: short block wall, easy access. Premium means: tall or stone wall, engineered, hard access.

+When is the best time to build a retaining wall in Dover?

Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are March through November. April and November are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.

Retaining wall near Dover

Retaining wall: all pricesRetaining wall in DelawareAll projects in DoverDelaware cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.

Note on derived figures: Materials = 40% of the low installed price and 60% of the high one, since HomeGuide says labor is 40-60% of the total project cost.