Paver patio cost in Charlotte, NC

Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.

Typical range (300 sq ft)
$2,850 – $5,150
Per sq ft
$9.50 – $16
before permit
Versus US midpoint
−5%
US $4,250
Rank of 300 metros
#187
1 = most expensive

A paver patio in Charlotte, NC usually costs $2,850 to $5,150 for 300 sq ft. That works out to about $9.50 to $16 per sq ft before permits. Compared with the national midpoint that is $220 less. Construction laborers earn a median of $22.04 an hour in the Charlotte area, 3% below the US median of $22.66.

Estimate your paver patio cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

Mid-grade pavers, a border or curve, some regrading

Add-ons

Estimated cost for 300 sq ft in Charlotte, NC, standard level

$3,550 to $4,450

About $11.50 to $14 per sq ft before permits. Labor is about 60% of the bill.

Cost breakdown
PartLowHigh
Materials$1,350$1,550
Labor$2,100$2,650
Permits and fees$100$240
Total$3,550$4,450
Save and get a PDF report

Cost breakdown for 300 sq ft in Charlotte, NC

Part of the jobLowMidpointHighShare
Materials$1,150$1,450$1,75036%
Labor$1,700$2,400$3,10060%
Permits and fees$0$170$3404%
Total$2,850$4,000$5,150100%

Where the Charlotte price comes from

The wage side of the estimate leans on construction laborers, who do 50% of the hours on a typical job. Their local median is $22.04 an hour. Add the other trades involved and the blended wage index for Charlotte is 0.94 (US = 1.00), which puts labor at 60% of the total.

Materials are scaled with BEA's regional price parity for goods. Charlotte is at 96.6 against 100 for the US, so a materials line of $1,500 nationally becomes $1,450 here (midpoint, 300 sq ft). Permits follow the all-items index of 97.3: $0 to $340.

Specs and site conditions that change a Charlotte bid

  • Base prep

    The base (road base, fabric, edging, bedding and joint sand) is $1.40-$2.20 per sq ft of the materials number.

  • Excavation and grading

    Digging out is $1-$5 per sq ft; regrading a sloped yard is $0.40-$2.00 per sq ft.

  • Pattern

    Herringbone and curves take longer to lay and waste more stone than a running bond.

Charlotte weather and the paver patio calendar

Climate numbers on this page come from NOAA's 1991-2020 U.S. Climate Normals at the nearest suitable station, Charlotte Douglas Ap (5 miles from the city center). They are 30-year averages, so any one year can run hotter, colder or wetter.

For digging, grading and setting material in the ground, the comfortable months in Charlotte are February through June and August through December: 10 of 12. Outside them, January has an average overnight low at or below freezing (32°F), and July has an average daytime high of 90°F or more.

In January the average low is at or below freezing, which means frozen ground and slower digging, compaction and sod or stone placement. NOAA counts about 58 days a year with a low at or below 32°F at this station.

Charlotte gets about 44 inches of precipitation in a normal year, including roughly 4 inches of snow. The wettest months are March, June and August (4.3 inches in August). Inside the workable window, February and October are the driest, at 3.1 and 3.2 inches. The station averages about 49 days a year at 90°F or above.

We do not adjust the estimate by month, because we have no reliable published data on seasonal pricing. It is still worth asking contractors whether an off-peak start date changes their bid.

Monthly normals, Charlotte Douglas Ap (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan52323.5Cold
Feb57353.1Workable
Mar64414.0Workable
Apr73493.8Workable
May80583.4Workable
Jun87664.0Workable
Jul90703.7Hot
Aug89694.3Workable
Sep83633.7Workable
Oct73503.2Workable
Nov63403.3Workable
Dec55353.6Workable

What nearby projects cost in Charlotte

Jobs that often go together with paver patio are priced below at their usual sizes, using the same Charlotte wage and price inputs. Compared with national midpoints, concrete slab comes out highest (−7%) and concrete driveway lowest (−9%); the gap comes from the trades each job uses.

Related projects with local prices
ProjectSizeRangevs. US
Concrete patio300 sq ft$1,150 – $3,700−8%
Stamped concrete400 sq ft$3,000 – $7,350−7%
Retaining wall200 sq ft of wall face$6,450 – $12,600−7%
Wood deck300 sq ft$6,950 – $14,000−8%
Concrete slab400 sq ft$2,250 – $4,850−7%
Concrete driveway600 sq ft$3,350 – $8,350−9%

Optional extras in Charlotte

Add-ons start from national price ranges and are scaled by 0.95 for Charlotte, which is the average of the area's wage index (0.94) and goods price index (0.97). The estimator above can add them to your total.

Add-on prices
Add-onLocal range
Excavation and haul-away$290 – $1,450

How Charlotte compares

Same job, same size (300 sq ft), priced for the nearest metros. Charlotte is the priciest of the group. Greensboro is the cheapest at $3,800.

Comparison with nearby areas
AreaRangeMidpointvs. here
Charlotte, NCthis page$2,850 – $5,150$4,000
Hickory, NC60 miles$2,800 – $5,000$3,900−3%
Spartanburg, SC65 miles$2,700 – $4,900$3,800−5%
Winston, NC70 miles$2,750 – $4,950$3,850−4%
Columbia, SC75 miles$2,750 – $4,950$3,850−4%
Greensboro, NC80 miles$2,700 – $4,900$3,800−5%
North Carolina (statewide)$2,800 – $5,050$3,950−2%
United States$3,000 – $5,450$4,250+5%

Out of the 300 metros we cover, Charlotte ranks #187 for the cost of this job (#1 is the most expensive). Statewide, Charlotte is 2% above the North Carolina figure.

Elsewhere in North Carolina

North Carolina metros compared with Charlotte
MetroSizeRangeMidpointvs. here
Raleigh, NC743,120 jobs$2,800 – $5,150$3,950−1%
Greensboro, NC365,410 jobs$2,700 – $4,900$3,800−5%
Durham, NC344,020 jobs$2,850 – $5,150$4,000level
Winston, NC271,980 jobs$2,750 – $4,950$3,850−4%
Wilmington, NC191,280 jobs$2,800 – $5,100$3,950−2%
Asheville, NC180,620 jobs$2,850 – $5,150$4,000level

Metros of a similar size

Big cities and small ones price differently, so here is Charlotte against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
Orlando, FL1,411,730 jobs$2,700 – $4,950$3,800−5%
Baltimore, MD1,356,680 jobs$3,000 – $5,450$4,200+5%
Tampa, FL1,447,120 jobs$2,800 – $5,150$4,000−1%
St. Louis, MO1,341,320 jobs$3,450 – $6,300$4,850+22%

What local crews earn in Charlotte

The labor line is built from BLS wage data, one trade at a time. This job draws on 3 trades. We compare each trade's local median with the US median, weight the ratios by how much of the job each trade does, and apply the blend to the national labor cost. For Charlotte the blend is 0.94.

For construction laborers (47-2061, weighted 50%) the local median is $22.04 an hour, which is in line with the national $22.66. The middle half of them earn between $18.36 and $23.92 an hour. BLS counts 10,840 of them working in the area, 79.8 for every 10,000 jobs (US: 70.5), so the local bench is about average.

For brickmasons and blockmasons (47-2021, weighted 30%) the local median is $25.24 an hour, which is 16% below the national $29.87. The middle half of them earn between $23.20 and $27.96 an hour. BLS counts 760 of them working in the area, 5.6 for every 10,000 jobs (US: 3.4), so the local bench is deeper than average.

Landscaping and groundskeeping workers (37-3011), 20% of the weighting: a median of $18.57 an hour, in line with the US median of $18.82. The middle half of them earn between $18.01 and $22.30 an hour. About 8,400 work in the metro. That is 61.8 per 10,000 jobs, compared with 61.3 nationally, so the supply of crews looks typical.

A quick sensitivity check: moving the lead trade (construction laborers) from the median to the 75th percentile wage adds about $110 to the midpoint estimate; the 25th percentile takes off about $210. That is a swing of roughly 5.2% to 2.6% of the total, which is useful for judging whether a bid reflects wages or something else, such as scope or margin.

Charlotte-Concord-Gastonia has 1,358,370 jobs in total (BLS, May 2025), ranking 21st by size among the 300 metros on this site.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Construction laborers (47-2061)50%$18.36$22.04$23.92$22.660.97metro
Brickmasons and blockmasons (47-2021)30%$23.20$25.24$27.96$29.870.84metro
Landscaping and groundskeeping workers (37-3011)20%$18.01$18.57$22.30$18.820.99metro
Blended100%0.94

Cost by quality level and size in Charlotte

The cited range is split into basic, standard and premium bands, then scaled to Charlotte. Bands overlap, because plenty of standard jobs cost as much as a light premium one. Sizes run from 12x12 (144 sq ft) to pool deck (800 sq ft).

Basic

$2,850 to $3,800

Basic concrete pavers, simple pattern, level yard

Standard

$3,550 to $4,450

Mid-grade pavers, a border or curve, some regrading

Premium

$4,250 to $5,150

Natural stone or clay brick, complex pattern, slope or retaining edge

Cost by size and quality level
SizeBasicStandardPremium
12x12 (144 sq ft)$1,350 – $1,900$1,750 – $2,250$2,150 – $2,650
16x16 (256 sq ft)$2,450 – $3,250$3,050 – $3,850$3,650 – $4,450
20x20 (400 sq ft)$3,800 – $5,000$4,700 – $5,900$5,600 – $6,800
pool deck (800 sq ft)$7,600 – $9,850$9,300 – $11,500$11,000 – $13,200

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $3,550 to $4,450 for Charlotte, NC is attached.

A detailed PDF report of this estimate, $9

The report lays out the paver patio numbers for Charlotte, NC line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Paver patio in Charlotte: your questions

+How much does it cost to install a paver patio in Charlotte?

For 300 sq ft, expect $2,850 to $5,150 in the Charlotte area. A standard-spec job lands at $3,550 to $4,450. Small jobs usually cost more per sq ft and large ones less.

+What is the price per sq ft for paver patio in Charlotte?

About $9.50 to $16 per sq ft for materials and labor, plus $0 to $340 for the permit if one is needed. The US range is $10 to $17.

+Is paver patio cheaper in Charlotte or Hickory?

Hickory is 60 miles away. The midpoint for 300 sq ft there is $3,900, which is 3% less than Charlotte ($4,000). Wage and materials indexes both feed that gap.

+How much of the bill is labor in Charlotte?

About 60% at the midpoint, or $2,400 out of $4,000. Materials are 36% and permits 4%. Nationally, labor is 60%.

+What would 20x20 (400 sq ft) cost in Charlotte?

$3,800 to $6,800. Pick a different size in the estimator above to get your own number.

+Does paver patio need a permit in Charlotte?

Often, but rules are set by your city or county building office, so call before you hire. Budget $0 to $340 for fees in the Charlotte area (our national range of $0 to $350 scaled by the local price level).

+Is Charlotte expensive for paver patio compared with the rest of North Carolina?

Charlotte is 2% above the North Carolina statewide estimate ($3,950 at the midpoint). We cover 11 metros in North Carolina; see the state page to compare them.

+What do construction laborers earn in Charlotte?

The BLS median is $22.04 an hour in the Charlotte area, compared with $22.66 nationally. The 25th to 75th percentile range is $18.36 to $23.92.

+What do basic and premium paver patio work cost in Charlotte?

For 300 sq ft, basic work runs $2,850 to $3,800 and premium work $4,250 to $5,150. Basic means: basic concrete pavers, simple pattern, level yard. Premium means: natural stone or clay brick, complex pattern, slope or retaining edge.

+When is the best time to install a paver patio in Charlotte?

Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are February through June and August through December. February and October are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.

+What does "excavation and haul-away" add in Charlotte?

$290 to $1,450 for 300 sq ft, from a national range scaled by the local wage and goods indexes.

Paver patio near Charlotte

Paver patio: all pricesPaver patio in North CarolinaAll projects in CharlotteNorth Carolina cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.