Home addition cost in Denver, CO

Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.

Typical range (300 sq ft)
$39,500 – $80,100
Per sq ft
$130 – $260
before permit
Versus US midpoint
+4%
US $57,500
Rank of 300 metros
#77
1 = most expensive

Denver homeowners pay roughly $39,500 to $80,100 to build a home addition at 300 sq ft, or $130 to $260 per sq ft (permit not included). Against the US midpoint, Denver is 4% higher. Carpenters earn a median of $31.21 an hour in the Denver area, 7% above the US median of $29.12.

Estimate your home addition cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

Standard room addition with HVAC and electrical

Estimated cost for 300 sq ft in Denver, CO, standard level

$51,700 to $68,000

About $169 to $221 per sq ft before permits. Labor is about 67% of the bill.

Cost breakdown
PartLowHigh
Materials$15,700$20,600
Labor$35,000$45,700
Permits and fees$1,000$1,650
Total$51,700$68,000
Save and get a PDF report

Cost breakdown for 300 sq ft in Denver, CO

Part of the jobLowMidpointHighShare
Materials$12,100$18,200$24,20030%
Labor$26,900$40,300$53,80067%
Permits and fees$530$1,300$2,1002%
Total$39,500$59,800$80,100100%

Why Denver prices look the way they do

We price the labor side from BLS wage data for 6 trades: carpenters at 50%, cement masons and concrete finishers at 10%, electricians at 10%, plumbers, pipefitters and steamfitters at 10%, drywall and ceiling tile installers at 10%, roofers at 10%. Weighted together, Denver wages are 1.05 times the national level. Labor makes up about 67% of the midpoint estimate (67% at national prices).

On the materials line, the BEA goods price index for the Denver metro is 101.0 (US = 100). The midpoint materials bill for 300 sq ft comes to $18,200, compared with $18,000 at national prices. Permit and inspection fees are scaled by the broader index (105.8) and land at $530 to $2,100.

What nearby projects cost in Denver

Because every project leans on different trades, Denver's wage level does not move all prices equally. Against the US midpoint, bathroom remodel runs +3% and roof replacement +1%.

Related projects with local prices
ProjectSizeRangevs. US
Kitchen remodel120 sq ft$18,900 – $32,100+2%
Bathroom remodel45 sq ft$4,850 – $24,100+3%
Detached garage576 sq ft$29,900 – $59,900+3%
Roof replacement2,000 sq ft of roof$6,150 – $12,700+1%

Cost by quality level and size in Denver

Three bands are cut from the same cited range and localized for Denver wages and prices. They overlap on purpose: a good standard job and a modest premium job can cost the same. The grid below prices the same bands at 3 common sizes.

Basic

$39,500 to $55,800

Bump-out or simple room without plumbing

Standard

$51,700 to $68,000

Standard room addition with HVAC and electrical

Premium

$63,900 to $80,100

Large addition with bath or kitchen and a new foundation

Cost by size and quality level
SizeBasicStandardPremium
bump-out (100 sq ft)$13,500 – $19,400$17,900 – $23,700$22,300 – $28,100
20x20 room (400 sq ft)$52,500 – $74,000$68,600 – $90,100$84,700 – $106,000
large suite (600 sq ft)$78,500 – $110,500$102,500 – $134,500$126,500 – $158,000

Denver against nearby metros and the rest of Colorado

Of the five closest metros, all are cheaper than Denver. Pueblo is the lowest at about $54,600 (midpoint, 300 sq ft), 90 miles away.

Comparison with nearby areas
AreaRangeMidpointvs. here
Denver, COthis page$39,500 – $80,100$59,800
Colorado Springs, CO45 miles$36,400 – $73,700$55,100−8%
Boulder, CO55 miles$37,800 – $76,600$57,200−4%
Greeley, CO80 miles$36,700 – $74,300$55,500−7%
Fort Collins, CO90 miles$36,700 – $74,500$55,600−7%
Pueblo, CO90 miles$36,100 – $73,200$54,600−9%
Colorado (statewide)$38,400 – $77,800$58,100−3%
United States$38,000 – $77,000$57,500−4%

Across 300 US metros, Denver comes in at #77 from the top. The priciest is Honolulu, HI at $79,600; the cheapest is Brownsville, TX at $44,300 (midpoints, 300 sq ft). Statewide, Denver is 3% above the Colorado figure.

Other Colorado metros

Colorado metros compared with Denver
MetroSizeRangeMidpointvs. here
Colorado Springs, CO316,060 jobs$36,400 – $73,700$55,100−8%
Boulder, CO192,390 jobs$37,800 – $76,600$57,200−4%
Fort Collins, CO169,430 jobs$36,700 – $74,500$55,600−7%
Greeley, CO119,540 jobs$36,700 – $74,300$55,500−7%
Grand Junction, CO67,170 jobs$36,500 – $74,000$55,300−8%
Pueblo, CO61,780 jobs$36,100 – $73,200$54,600−9%

Cities with a workforce like Denver's

Big cities and small ones price differently, so here is Denver against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
Riverside, CA1,716,760 jobs$41,300 – $83,700$62,500+4%
San Diego, CA1,538,060 jobs$44,000 – $89,200$66,600+11%
Detroit, MI1,904,530 jobs$41,300 – $83,600$62,400+4%
Tampa, FL1,447,120 jobs$33,900 – $68,700$51,300−14%

Local wages behind the labor line

Wages are the part of this estimate that changes most from town to town. 6 trades carry the job here, and each is compared with its US median. The weighted result for Denver is 1.05 times the national level.

For carpenters (47-2031, weighted 50%) the local median is $31.21 an hour, which is 7% above the national $29.12. The middle half of them earn between $27.70 and $36.14 an hour. BLS counts 7,250 of them working in the area, 45.0 for every 10,000 jobs (US: 43.1), so the local bench is about average.

For cement masons and concrete finishers (47-2051, weighted 10%) the local median is $29.87 an hour, which is 9% above the national $27.41. The middle half of them earn between $24.35 and $33.74 an hour. BLS counts 2,590 of them working in the area, 16.1 for every 10,000 jobs (US: 13.3), so the local bench is deeper than average.

Electricians (47-2111), 10% of the weighting: a median of $30.36 an hour, in line with the US median of $30.38. The middle half of them earn between $23.52 and $38.28 an hour. About 10,450 work in the metro. That is 64.9 per 10,000 jobs, compared with 48.7 nationally, which suggests plenty of local crews to bid.

For plumbers, pipefitters and steamfitters (47-2152, weighted 10%) the local median is $30.72 an hour, which is in line with the national $30.67. The middle half of them earn between $28.81 and $39.11 an hour. BLS counts 5,750 of them working in the area, 35.7 for every 10,000 jobs (US: 30.0), so the local bench is deeper than average.

Drywall and ceiling tile installers (47-2081), 10% of the weighting: a median of $30.89 an hour, 9% above the US median of $28.33. The middle half of them earn between $24.44 and $33.81 an hour. About 1,110 work in the metro. That is 6.9 per 10,000 jobs, compared with 5.3 nationally, which suggests plenty of local crews to bid.

For roofers (47-2181, weighted 10%) the local median is $26.84 an hour, which is in line with the national $26.65. The middle half of them earn between $23.52 and $29.79 an hour. BLS counts 1,900 of them working in the area, 11.8 for every 10,000 jobs (US: 8.7), so the local bench is deeper than average.

Quotes come from real crews, not medians. If the carpenters on your job are paid at the 75th percentile ($36.14 an hour) instead of the median, the labor line grows by about $3,250. At the 25th percentile ($27.70) it shrinks by about $2,300. The total moves by 5.4% or 3.9%, so wages alone rarely explain a quote that is far outside our range.

For context on the local economy, BLS counts 1,609,350 jobs in the Denver-Aurora-Centennial area. That makes it the 17th largest of the 300 metros we cover, with 1.03% of US employment.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Carpenters (47-2031)50%$27.70$31.21$36.14$29.121.07metro
Cement masons and concrete finishers (47-2051)10%$24.35$29.87$33.74$27.411.09metro
Electricians (47-2111)10%$23.52$30.36$38.28$30.381.00metro
Plumbers, pipefitters and steamfitters (47-2152)10%$28.81$30.72$39.11$30.671.00metro
Drywall and ceiling tile installers (47-2081)10%$24.44$30.89$33.81$28.331.09metro
Roofers (47-2181)10%$23.52$26.84$29.79$26.651.01metro
Blended100%1.05

When to schedule home addition in Denver

We use NOAA's 1991-2020 climate normals for Denver-Stapleton (in the city). These are 30-year monthly averages, not forecasts.

April through June and August through October are the stretches where digging, grading and setting material in the ground runs into the fewest weather problems in Denver (6 of 12 months). January, February, March, November and December have an average overnight low at or below freezing (32°F); July has an average daytime high of 90°F or more.

In January, February, March, November and December the average low is at or below freezing, which means frozen ground and slower digging, compaction and sod or stone placement. NOAA counts about 156 days a year with a low at or below 32°F at this station.

Denver gets about 15 inches of precipitation in a normal year, including roughly 49 inches of snow. The wettest months are May, July and August (2.3 inches in May). Inside the workable window, September and October are the driest, at 1.5 and 1.0 inches. The station averages about 42 days a year at 90°F or above.

Does the season change the price? Probably, but we do not have a sourced seasonal price curve, so the estimator shows a year-round figure and does not adjust by month. When you collect quotes, ask whether scheduling in a slower month gets a better rate.

Monthly normals, Denver-Stapleton (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan47180.5Cold
Feb48190.5Cold
Mar56271.1Cold
Apr63341.7Workable
May72432.3Workable
Jun84531.7Workable
Jul90592.1Hot
Aug88571.8Workable
Sep80481.5Workable
Oct67361.0Workable
Nov55260.7Cold
Dec46180.5Cold

Home addition: what moves the price in Denver

  • Type of addition

    A new room is $125-$250 per sq ft; a bump-out $85-$200; an attic conversion $50-$150; a garage conversion $50-$200 (HomeGuide).

  • Plumbing and fixtures

    Adding a bathroom or kitchen drives the price up the most.

  • Permits

    Construction permits run $500-$2,000, or $5-$21 per $1,000 of project cost (HomeGuide).

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $51,700 to $68,000 for Denver, CO is attached.

A detailed PDF report of this estimate, $9

The report lays out the home addition numbers for Denver, CO line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Home addition in Denver: your questions

+How much does it cost to build a home addition in Denver?

For 300 sq ft, expect $39,500 to $80,100 in the Denver area. A standard-spec job lands at $51,700 to $68,000. Small jobs usually cost more per sq ft and large ones less.

+What is the price per sq ft for home addition in Denver?

About $130 to $260 per sq ft for materials and labor, plus $530 to $2,100 for the permit if one is needed. The US range is $125 to $250.

+Is home addition cheaper in Denver or Colorado Springs?

Colorado Springs is 45 miles away. The midpoint for 300 sq ft there is $55,100, which is 8% less than Denver ($59,800). Wage and materials indexes both feed that gap.

+How much of the bill is labor in Denver?

About 67% at the midpoint, or $40,300 out of $59,800. Materials are 30% and permits 2%. Nationally, labor is 67%.

+What would 20x20 room (400 sq ft) cost in Denver?

$52,500 to $106,000. Pick a different size in the estimator above to get your own number.

+Does home addition need a permit in Denver?

Often, but rules are set by your city or county building office, so call before you hire. Budget $530 to $2,100 for fees in the Denver area (our national range of $500 to $2,000 scaled by the local price level).

+Is Denver expensive for home addition compared with the rest of Colorado?

Denver is 3% above the Colorado statewide estimate ($58,100 at the midpoint). We cover 7 metros in Colorado; see the state page to compare them.

+What do carpenters earn in Denver?

The BLS median is $31.21 an hour in the Denver area, compared with $29.12 nationally. The 25th to 75th percentile range is $27.70 to $36.14.

+What do basic and premium home addition work cost in Denver?

For 300 sq ft, basic work runs $39,500 to $55,800 and premium work $63,900 to $80,100. Basic means: bump-out or simple room without plumbing. Premium means: large addition with bath or kitchen and a new foundation.

+When is the best time to build a home addition in Denver?

Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are April through June and August through October. September and October are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.

Home addition near Denver

Home addition: all pricesHome addition in ColoradoAll projects in DenverColorado cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.

Note on derived figures: Materials = 32% of the installed price, from Cost to Renovate's mid-range 'Structural' category split (56% labor, 32% materials, 11% permits and design). It is a category average rather than an addition-specific figure.