Gravel driveway cost in Burlington, NC
Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.
- Typical range (1,000 sq ft)
- $2,300 – $9,400
- Per sq ft
- $2.30 – $9.25
- before permit
- Versus US midpoint
- −8%
- US $6,350
- Rank of 300 metros
- #209
- 1 = most expensive
Burlington homeowners pay roughly $2,300 to $9,400 to install a gravel driveway at 1,000 sq ft, or $2.30 to $9.25 per sq ft (permit not included). Against the US midpoint, Burlington is 8% lower. Construction laborers earn a median of $20.35 an hour in the Burlington area, 10% below the US median of $22.66.
Estimate your gravel driveway cost
Pick a size, a quality level and where you live. Prices update as you type.
Estimated cost for 1,000 sq ft in Burlington, NC, standard level
$4,450 to $7,300
About $4.40 to $7.15 per sq ft before permits. Labor is about 47% of the bill.
| Part | Low | High |
|---|---|---|
| Materials | $2,250 | $3,750 |
| Labor | $2,100 | $3,400 |
| Permits and fees | $55 | $130 |
| Total | $4,450 | $7,300 |
Cost breakdown for 1,000 sq ft in Burlington, NC
| Part of the job | Low | Midpoint | High | Share |
|---|---|---|---|---|
| Materials | $1,150 | $3,000 | $4,850 | 51% |
| Labor | $1,150 | $2,750 | $4,400 | 47% |
| Permits and fees | $0 | $95 | $190 | 2% |
| Total | $2,300 | $5,850 | $9,400 | 100% |
What is behind the Burlington number
Labor is 47% of the midpoint bill here, against 50% nationally. The mix of trades behind this job is construction laborers (50%), operating engineers and other construction equipment operators (50%). We weight each trade's local median wage by that share and compare it with the national median. In Burlington the blended ratio comes out at 0.88.
On the materials line, the BEA goods price index for the Burlington metro is 96.6 (US = 100). The midpoint materials bill for 1,000 sq ft comes to $3,000, compared with $3,100 at national prices. Permit and inspection fees are scaled by the broader index (93.2) and land at $0 to $190.
Why two Burlington quotes can differ
Depth and layers
A proper driveway is a 4-inch base plus a 2-inch top course. Each extra inch of stone adds weight in tons and money.
Labor share
HomeGuide puts labor at about 50% of a gravel driveway's total cost, so a longer or harder-to-reach site moves the price more than the stone does.
Grading and edging
Grading runs $1-$3 per sq ft. Edging to keep the stone in is $5-$18 per linear foot.
Add-ons priced for Burlington
Extras are quoted nationally and then scaled to Burlington by the average of the local wage index (0.88) and goods index (0.97), a factor of 0.92. Tick any of them in the estimator above to add them to your total. Treat these as planning figures: an add-on touches different trades than the main job, so the scaling is an approximation.
| Add-on | Local range |
|---|---|
| Add edging (approx. 1 ft per 10 sq ft) | $460 – $1,650 |
How Burlington compares
Same job, same size (1,000 sq ft), priced for the nearest metros. Durham is the priciest of the group at $6,000. Greensboro is the cheapest at $5,750.
| Area | Range | Midpoint | vs. here |
|---|---|---|---|
| Burlington, NCthis page | $2,300 – $9,400 | $5,850 | |
| Durham, NC15 miles | $2,350 – $9,600 | $6,000 | +2% |
| Greensboro, NC20 miles | $2,250 – $9,200 | $5,750 | −2% |
| Winston, NC55 miles | $2,250 – $9,250 | $5,750 | −2% |
| Raleigh, NC55 miles | $2,350 – $9,600 | $5,950 | +2% |
| Fayetteville, NC75 miles | $2,300 – $9,350 | $5,800 | −1% |
| North Carolina (statewide) | $2,300 – $9,450 | $5,900 | level |
| United States | $2,500 – $10,200 | $6,350 | +8% |
Across 300 US metros, Burlington comes in at #209 from the top. The priciest is Kahului, HI at $9,500; the cheapest is McAllen, TX at $5,200 (midpoints, 1,000 sq ft). Statewide, Burlington is 0% below the North Carolina figure.
Other North Carolina metros
| Metro | Size | Range | Midpoint | vs. here |
|---|---|---|---|---|
| Charlotte, NC | 1,358,370 jobs | $2,350 – $9,600 | $5,950 | +2% |
| Raleigh, NC | 743,120 jobs | $2,350 – $9,600 | $5,950 | +2% |
| Greensboro, NC | 365,410 jobs | $2,250 – $9,200 | $5,750 | −2% |
| Durham, NC | 344,020 jobs | $2,350 – $9,600 | $6,000 | +2% |
| Winston, NC | 271,980 jobs | $2,250 – $9,250 | $5,750 | −2% |
| Wilmington, NC | 191,280 jobs | $2,300 – $9,450 | $5,900 | +1% |
Cities with a workforce like Burlington's
Big cities and small ones price differently, so here is Burlington against the 4 metros with the closest total employment.
| Metro | Size | Range | Midpoint | vs. here |
|---|---|---|---|---|
| Dover, DE | 68,080 jobs | $2,300 – $9,500 | $5,900 | +1% |
| Winchester, VA | 67,740 jobs | $2,300 – $9,400 | $5,850 | level |
| Traverse City, MI | 68,440 jobs | $2,450 – $10,000 | $6,250 | +6% |
| Morgantown, WV | 67,370 jobs | $2,350 – $9,550 | $5,950 | +2% |
When to schedule gravel driveway in Burlington
We use NOAA's 1991-2020 climate normals for Burlington Alamance Ap (5 miles from the city center). These are 30-year monthly averages, not forecasts.
February through June and August through December are the stretches where digging, grading and setting material in the ground runs into the fewest weather problems in Burlington (10 of 12 months). January has an average overnight low at or below freezing (32°F); July has an average daytime high of 90°F or more.
In January the average low is at or below freezing, which means frozen ground and slower digging, compaction and sod or stone placement. NOAA counts about 78 days a year with a low at or below 32°F at this station.
Burlington gets about 43 inches of precipitation in a normal year. The wettest months are June, July and September (4.7 inches in July). Inside the workable window, February and October are the driest, at 2.8 and 3.1 inches. The station averages about 48 days a year at 90°F or above.
Does the season change the price? Probably, but we do not have a sourced seasonal price curve, so the estimator shows a year-round figure and does not adjust by month. When you collect quotes, ask whether scheduling in a slower month gets a better rate.
| Month | Avg high °F | Avg low °F | Precip (in) | For this job |
|---|---|---|---|---|
| Jan | 52 | 30 | 3.1 | Cold |
| Feb | 56 | 33 | 2.8 | Workable |
| Mar | 64 | 39 | 3.9 | Workable |
| Apr | 74 | 48 | 3.8 | Workable |
| May | 80 | 57 | 3.4 | Workable |
| Jun | 88 | 65 | 4.3 | Workable |
| Jul | 91 | 70 | 4.7 | Hot |
| Aug | 89 | 68 | 3.5 | Workable |
| Sep | 83 | 62 | 4.4 | Workable |
| Oct | 73 | 49 | 3.1 | Workable |
| Nov | 63 | 38 | 3.3 | Workable |
| Dec | 55 | 33 | 3.1 | Workable |
Local wages behind the labor line
Wages are the part of this estimate that changes most from town to town. 2 trades carry the job here, and each is compared with its US median. The weighted result for Burlington is 0.88 times the national level.
Construction laborers (47-2061), 50% of the weighting: a median of $20.35 an hour, 10% below the US median of $22.66. The middle half of them earn between $17.66 and $22.91 an hour. About 400 work in the metro. That is 59.0 per 10,000 jobs, compared with 70.5 nationally, so expect fewer local crews to bid.
For operating engineers and other construction equipment operators (47-2073, weighted 50%) the local median is $24.79 an hour, which is 14% below the national $28.78. The middle half of them earn between $22.20 and $26.13 an hour. BLS counts 200 of them working in the area, 29.5 for every 10,000 jobs (US: 30.7), so the local bench is about average.
Quotes come from real crews, not medians. If the construction laborers on your job are paid at the 75th percentile ($22.91 an hour) instead of the median, the labor line grows by about $180. At the 25th percentile ($17.66) it shrinks by about $190. The total moves by 3.0% or 3.2%, so wages alone rarely explain a quote that is far outside our range.
For context on the local economy, BLS counts 67,830 jobs in the Burlington area. That makes it the 266th largest of the 300 metros we cover, with 0.04% of US employment.
| Trade | Weight | 25th pct | Median | 75th pct | US median | Ratio | Level used |
|---|---|---|---|---|---|---|---|
| Construction laborers (47-2061) | 50% | $17.66 | $20.35 | $22.91 | $22.66 | 0.90 | metro |
| Operating engineers and other construction equipment operators (47-2073) | 50% | $22.20 | $24.79 | $26.13 | $28.78 | 0.86 | metro |
| Blended | 100% | 0.88 | |||||
Burlington: what basic, standard and premium work costs
Three bands are cut from the same cited range and localized for Burlington wages and prices. They overlap on purpose: a good standard job and a modest premium job can cost the same. The grid below prices the same bands at 4 common sizes.
Basic
$2,300 to $5,150
Crusher-run spread and compacted on firm ground
Standard
$4,450 to $7,300
Excavated base plus top course, fabric, light grading
Premium
$6,550 to $9,400
Deep multi-layer build, edging, culvert or drainage
| Size | Basic | Standard | Premium |
|---|---|---|---|
| single car (500 sq ft) | $1,150 – $2,600 | $2,250 – $3,700 | $3,350 – $4,800 |
| two car (1,000 sq ft) | $2,300 – $5,150 | $4,450 – $7,300 | $6,550 – $9,400 |
| 100 ft x 10 ft (1,000 sq ft) | $2,300 – $5,150 | $4,450 – $7,300 | $6,550 – $9,400 |
| long rural (2,000 sq ft) | $4,600 – $10,200 | $8,800 – $14,400 | $13,000 – $18,600 |
Planning more than one job in Burlington?
Because every project leans on different trades, Burlington's wage level does not move all prices equally. Against the US midpoint, sod installation runs −5% and concrete driveway −13%.
| Project | Size | Range | vs. US |
|---|---|---|---|
| Asphalt driveway | 600 sq ft | $2,850 – $6,900 | −7% |
| Concrete driveway | 600 sq ft | $3,250 – $8,000 | −13% |
| French drain | 60 linear ft | $560 – $1,950 | −7% |
| Sod installation | 1,500 sq ft | $1,450 – $3,150 | −5% |
| Concrete slab | 400 sq ft | $2,200 – $4,750 | −9% |
| Paver patio | 300 sq ft | $2,750 – $4,950 | −9% |
Get 3 local quotes
Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $4,450 to $7,300 for Burlington, NC is attached.
A detailed PDF report of this estimate, $9
Multi-page report for Burlington, NC: low, typical and high cost, a line-item breakdown of materials and labor by trade, permit notes, the best months to schedule, a quote comparison sheet, red flags, questions for contractors, checklists and every source. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.
Gravel driveway in Burlington: your questions
+How much does it cost to install a gravel driveway in Burlington?
For 1,000 sq ft, expect $2,300 to $9,400 in the Burlington area. A standard-spec job lands at $4,450 to $7,300. Small jobs usually cost more per sq ft and large ones less.
+What is the price per sq ft for gravel driveway in Burlington?
About $2.30 to $9.25 per sq ft for materials and labor, plus $0 to $190 for the permit if one is needed. The US range is $2.50 to $10.
+Is gravel driveway cheaper in Burlington or Durham?
Durham is 15 miles away. The midpoint for 1,000 sq ft there is $6,000, which is 2% more than Burlington ($5,850). Wage and materials indexes both feed that gap.
+How much of the bill is labor in Burlington?
About 47% at the midpoint, or $2,750 out of $5,850. Materials are 51% and permits 2%. Nationally, labor is 50%.
+What would 100 ft x 10 ft (1,000 sq ft) cost in Burlington?
$2,300 to $9,400. Pick a different size in the estimator above to get your own number.
+Does gravel driveway need a permit in Burlington?
Often, but rules are set by your city or county building office, so call before you hire. Budget $0 to $190 for fees in the Burlington area (our national range of $0 to $200 scaled by the local price level).
+Is Burlington expensive for gravel driveway compared with the rest of North Carolina?
Burlington is 0% below the North Carolina statewide estimate ($5,900 at the midpoint). We cover 11 metros in North Carolina; see the state page to compare them.
+What do construction laborers earn in Burlington?
The BLS median is $20.35 an hour in the Burlington area, compared with $22.66 nationally. The 25th to 75th percentile range is $17.66 to $22.91.
+What do basic and premium gravel driveway work cost in Burlington?
For 1,000 sq ft, basic work runs $2,300 to $5,150 and premium work $6,550 to $9,400. Basic means: crusher-run spread and compacted on firm ground. Premium means: deep multi-layer build, edging, culvert or drainage.
+When is the best time to install a gravel driveway in Burlington?
Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are February through June and August through December. February and October are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.
+What does "add edging" add in Burlington?
$460 to $1,650 for 1,000 sq ft, from a national range scaled by the local wage and goods indexes.
Gravel driveway near Burlington
Where these numbers come from
Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.
- HomeGuide: How Much Does a Gravel Driveway Cost? (2026) (accessed November 4, 2026)
- CalculateGravel: Gravel Driveway Cost in 2026 (accessed November 4, 2026)
- HomeGuide: 2026 Building Permit Costs | Fees & Cost Calculator (accessed November 4, 2026)
- BLS Occupational Employment and Wage Statistics, May 2025
- BEA Regional Price Parities, 2024
- NOAA NCEI U.S. Climate Normals, 1991-2020
Note on derived figures: Installed range spans a basic spread-and-compact job ($2.50/sq ft low, CalculateGravel) to a full build with excavation ($10/sq ft high, HomeGuide). Materials low end is DIY stone ($1.20/sq ft, CalculateGravel); high end is half of HomeGuide's $10 because it says labor is about 50% of the project.