A gravel driveway in Lincoln, NE usually costs $2,450 to $9,900 for 1,000 sq ft. That works out to about $2.45 to $9.70 per sq ft before permits. That is within a few percent of the national midpoint, so there is little local premium or discount. Building materials run about 6% below the US average here (BEA goods price index 94.1).

Estimate your gravel driveway cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

Excavated base plus top course, fabric, light grading

Add-ons

Estimated cost for 1,000 sq ft in Lincoln, NE, standard level

$4,700 to $7,650

About $4.60 to $7.55 per sq ft before permits. Labor is about 51% of the bill.

Cost breakdown
PartLowHigh
Materials$2,200$3,650
Labor$2,400$3,900
Permits and fees$55$130
Total$4,700$7,650
Save and get a PDF report

Cost breakdown for 1,000 sq ft in Lincoln, NE

Part of the jobLowMidpointHighShare
Materials$1,150$2,900$4,70047%
Labor$1,300$3,150$5,00051%
Permits and fees$0$90$1801%
Total$2,450$6,150$9,900100%

Where the Lincoln price comes from

The wage side of the estimate leans on construction laborers, who do 50% of the hours on a typical job. Their local median is $22.45 an hour. Add the other trades involved and the blended wage index for Lincoln is 1.00 (US = 1.00), which puts labor at 51% of the total.

Materials are scaled with BEA's regional price parity for goods. Lincoln is at 94.1 against 100 for the US, so a materials line of $3,100 nationally becomes $2,900 here (midpoint, 1,000 sq ft). Permits follow the all-items index of 91.6: $0 to $180.

Extras that change the Lincoln total

Add-ons start from national price ranges and are scaled by 0.97 for Lincoln, which is the average of the area's wage index (1.00) and goods price index (0.94). The estimator above can add them to your total.

Add-on prices
Add-onLocal range
Add edging (approx. 1 ft per 10 sq ft)$490 – $1,750

Pick a size, pick a tier: gravel driveway pricing in Lincoln

The cited range is split into basic, standard and premium bands, then scaled to Lincoln. Bands overlap, because plenty of standard jobs cost as much as a light premium one. Sizes run from single car (500 sq ft) to long rural (2,000 sq ft).

Basic

$2,450 to $5,400

Crusher-run spread and compacted on firm ground

Standard

$4,700 to $7,650

Excavated base plus top course, fabric, light grading

Premium

$6,900 to $9,900

Deep multi-layer build, edging, culvert or drainage

Cost by size and quality level
SizeBasicStandardPremium
single car (500 sq ft)$1,200 – $2,750$2,350 – $3,900$3,500 – $5,050
two car (1,000 sq ft)$2,450 – $5,400$4,700 – $7,650$6,900 – $9,900
100 ft x 10 ft (1,000 sq ft)$2,450 – $5,400$4,700 – $7,650$6,900 – $9,900
long rural (2,000 sq ft)$4,850 – $10,800$9,300 – $15,200$13,700 – $19,600

How Lincoln compares

Of the five closest metros, 1 is cheaper than Lincoln. Topeka is the lowest at about $6,050 (midpoint, 1,000 sq ft), 135 miles away.

Comparison with nearby areas
AreaRangeMidpointvs. here
Lincoln, NEthis page$2,450 – $9,900$6,150
Omaha, NE55 miles$2,450 – $9,950$6,200+1%
Sioux City, IA120 miles$2,450 – $9,900$6,200level
Topeka, KS135 miles$2,400 – $9,700$6,050−2%
Des Moines, IA170 miles$2,500 – $10,100$6,300+2%
Kansas City, MO185 miles$2,500 – $10,200$6,400+3%
Nebraska (statewide)$2,400 – $9,850$6,100−1%
United States$2,500 – $10,200$6,350+3%

Out of the 300 metros we cover, Lincoln ranks #165 for the cost of this job (#1 is the most expensive). Statewide, Lincoln is 1% above the Nebraska figure.

Elsewhere in Nebraska

Nebraska metros compared with Lincoln
MetroSizeRangeMidpointvs. here
Omaha, NE498,100 jobs$2,450 – $9,950$6,200+1%

Metros of a similar size

Big cities and small ones price differently, so here is Lincoln against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
York, PA183,590 jobs$2,550 – $10,400$6,500+5%
Asheville, NC180,620 jobs$2,350 – $9,550$5,950−4%
Tallahassee, FL186,160 jobs$2,200 – $9,000$5,600−9%
Davenport, IA180,450 jobs$2,600 – $10,500$6,550+6%

Why two Lincoln quotes can differ

  • Depth and layers

    A proper driveway is a 4-inch base plus a 2-inch top course. Each extra inch of stone adds weight in tons and money.

  • Labor share

    HomeGuide puts labor at about 50% of a gravel driveway's total cost, so a longer or harder-to-reach site moves the price more than the stone does.

  • Grading and edging

    Grading runs $1-$3 per sq ft. Edging to keep the stone in is $5-$18 per linear foot.

Lincoln weather and the gravel driveway calendar

Climate numbers on this page come from NOAA's 1991-2020 U.S. Climate Normals at the nearest suitable station, Lincoln Muni Ap (5 miles from the city center). They are 30-year averages, so any one year can run hotter, colder or wetter.

For digging, grading and setting material in the ground, the comfortable months in Lincoln are April through October: 7 of 12. Outside them, January, February, March, November and December have an average overnight low at or below freezing (32°F).

In January, February, March, November and December the average low is at or below freezing, which means frozen ground and slower digging, compaction and sod or stone placement. NOAA counts about 143 days a year with a low at or below 32°F at this station.

Lincoln gets about 29 inches of precipitation in a normal year, including roughly 26 inches of snow. The wettest months are May, June and August (4.9 inches in May). Inside the workable window, April and October are the driest, at 2.7 and 2.1 inches. The station averages about 42 days a year at 90°F or above.

We do not adjust the estimate by month, because we have no reliable published data on seasonal pricing. It is still worth asking contractors whether an off-peak start date changes their bid.

Monthly normals, Lincoln Muni Ap (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan36140.7Cold
Feb41180.9Cold
Mar54291.6Cold
Apr65392.7Workable
May75514.9Workable
Jun85624.5Workable
Jul89673.3Workable
Aug87643.3Workable
Sep80542.9Workable
Oct67412.1Workable
Nov52281.3Cold
Dec39181.2Cold

What local crews earn in Lincoln

The labor line is built from BLS wage data, one trade at a time. This job draws on 2 trades. We compare each trade's local median with the US median, weight the ratios by how much of the job each trade does, and apply the blend to the national labor cost. For Lincoln the blend is 1.00.

For construction laborers (47-2061, weighted 50%) the local median is $22.45 an hour, which is in line with the national $22.66. The middle half of them earn between $19.28 and $24.46 an hour. BLS counts 1,250 of them working in the area, 68.4 for every 10,000 jobs (US: 70.5), so the local bench is about average.

Operating engineers and other construction equipment operators (47-2073), 50% of the weighting: a median of $29.24 an hour, in line with the US median of $28.78. The middle half of them earn between $24.86 and $30.19 an hour. About 490 work in the metro. That is 26.8 per 10,000 jobs, compared with 30.7 nationally, so the supply of crews looks typical.

A quick sensitivity check: moving the lead trade (construction laborers) from the median to the 75th percentile wage adds about $140 to the midpoint estimate; the 25th percentile takes off about $220. That is a swing of roughly 3.6% to 2.3% of the total, which is useful for judging whether a bid reflects wages or something else, such as scope or margin.

Lincoln has 182,620 jobs in total (BLS, May 2025), ranking 126th by size among the 300 metros on this site.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Construction laborers (47-2061)50%$19.28$22.45$24.46$22.660.99metro
Operating engineers and other construction equipment operators (47-2073)50%$24.86$29.24$30.19$28.781.02metro
Blended100%1.00

What nearby projects cost in Lincoln

Jobs that often go together with gravel driveway are priced below at their usual sizes, using the same Lincoln wage and price inputs. Compared with national midpoints, French drain comes out highest (−4%) and concrete driveway lowest (−7%); the gap comes from the trades each job uses.

Related projects with local prices
ProjectSizeRangevs. US
Asphalt driveway600 sq ft$2,950 – $7,150−4%
Concrete driveway600 sq ft$3,400 – $8,500−7%
French drain60 linear ft$580 – $2,000−4%
Sod installation1,500 sq ft$1,450 – $3,150−5%
Concrete slab400 sq ft$2,300 – $4,850−7%
Paver patio300 sq ft$2,850 – $5,200−5%

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $4,700 to $7,650 for Lincoln, NE is attached.

Detailed gravel driveway report for Lincoln, NE, $9

Multi-page report for Lincoln, NE: low, typical and high cost, a line-item breakdown of materials and labor by trade, permit notes, the best months to schedule, a quote comparison sheet, red flags, questions for contractors, checklists and every source. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Gravel driveway in Lincoln: your questions

+How much does it cost to install a gravel driveway in Lincoln?

For 1,000 sq ft, expect $2,450 to $9,900 in the Lincoln area. A standard-spec job lands at $4,700 to $7,650. Small jobs usually cost more per sq ft and large ones less.

+What is the price per sq ft for gravel driveway in Lincoln?

About $2.45 to $9.70 per sq ft for materials and labor, plus $0 to $180 for the permit if one is needed. The US range is $2.50 to $10.

+Is gravel driveway cheaper in Lincoln or Omaha?

Omaha is 55 miles away. The midpoint for 1,000 sq ft there is $6,200, which is 1% more than Lincoln ($6,150). Wage and materials indexes both feed that gap.

+How much of the bill is labor in Lincoln?

About 51% at the midpoint, or $3,150 out of $6,150. Materials are 47% and permits 1%. Nationally, labor is 50%.

+What would 100 ft x 10 ft (1,000 sq ft) cost in Lincoln?

$2,450 to $9,900. Pick a different size in the estimator above to get your own number.

+Does gravel driveway need a permit in Lincoln?

Often, but rules are set by your city or county building office, so call before you hire. Budget $0 to $180 for fees in the Lincoln area (our national range of $0 to $200 scaled by the local price level).

+Is Lincoln expensive for gravel driveway compared with the rest of Nebraska?

Lincoln is 1% above the Nebraska statewide estimate ($6,100 at the midpoint). We cover 2 metros in Nebraska; see the state page to compare them.

+What do construction laborers earn in Lincoln?

The BLS median is $22.45 an hour in the Lincoln area, compared with $22.66 nationally. The 25th to 75th percentile range is $19.28 to $24.46.

+What do basic and premium gravel driveway work cost in Lincoln?

For 1,000 sq ft, basic work runs $2,450 to $5,400 and premium work $6,900 to $9,900. Basic means: crusher-run spread and compacted on firm ground. Premium means: deep multi-layer build, edging, culvert or drainage.

+When is the best time to install a gravel driveway in Lincoln?

Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are April through October. April and October are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.

+What does "add edging" add in Lincoln?

$490 to $1,750 for 1,000 sq ft, from a national range scaled by the local wage and goods indexes.

Gravel driveway near Lincoln

Gravel driveway: all pricesGravel driveway in NebraskaAll projects in LincolnNebraska cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.

Note on derived figures: Installed range spans a basic spread-and-compact job ($2.50/sq ft low, CalculateGravel) to a full build with excavation ($10/sq ft high, HomeGuide). Materials low end is DIY stone ($1.20/sq ft, CalculateGravel); high end is half of HomeGuide's $10 because it says labor is about 50% of the project.