Skip to content
CostLocal

French drain cost in Fort Smith, AR

Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.

Typical range (60 linear ft)
$510 – $1,750
Per linear ft
$8.40 – $29.50
before permit
Versus US midpoint
−16%
US $1,350
Rank of 300 metros
#299
1 = most expensive

A French drain in Fort Smith, AR usually costs $510 to $1,750 for 60 linear ft. That works out to about $8.40 to $29.50 per linear ft before permits. Compared with the national midpoint that is $210 less. Construction laborers earn a median of $17.77 an hour in the Fort Smith area, 22% below the US median of $22.66.

Estimate your french drain cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

Standard drain with fabric, gravel and a pop-up outlet

Estimated cost for 60 linear ft in Fort Smith, AR, standard level

$880 to $1,400

About $14.50 to $23 per linear ft before permits. Labor is about 47% of the bill.

Cost breakdown
PartLowHigh
Materials$470$740
Labor$410$650
Permits and fees$0$0
Total$880$1,400
Save and get a PDF report

Cost breakdown for 60 linear ft in Fort Smith, AR

Part of the jobLowMidpointHighShare
Materials$270$610$94053%
Labor$240$530$82047%
Permits and fees$0$0$00%
Total$510$1,150$1,750100%

Why Fort Smith prices look the way they do

Labor is 47% of the midpoint bill here, against 52% nationally. The mix of trades behind this job is construction laborers (50%), operating engineers and other construction equipment operators (30%), pipelayers (20%). We weight each trade's local median wage by that share and compare it with the national median. In Fort Smith the blended ratio comes out at 0.76.

Materials are scaled with BEA's regional price parity for goods. Fort Smith is at 93.6 against 100 for the US, so a materials line of $650 nationally becomes $610 here (midpoint, 60 linear ft). Permits follow the all-items index of 85.9: $0 to $0.

Data note: 20% of the labor weighting for this project uses a statewide median because BLS has no published metro figure for that trade in Fort Smith. The wage table below marks each row.

Fort Smith weather and the french drain calendar

Climate numbers on this page come from NOAA's 1991-2020 U.S. Climate Normals at the nearest suitable station, Ft Smith Rgnl Ap (in the city). They are 30-year averages, so any one year can run hotter, colder or wetter.

For digging, grading and setting material in the ground, the comfortable months in Fort Smith are February through June and September through November: 8 of 12. Outside them, January and December have an average overnight low at or below freezing (32°F), and July and August have an average daytime high of 90°F or more.

In January and December the average low is at or below freezing, which means frozen ground and slower digging, compaction and sod or stone placement. NOAA counts about 63 days a year with a low at or below 32°F at this station.

Fort Smith gets about 47 inches of precipitation in a normal year, including roughly 3 inches of snow. The wettest months are April, May and June (5.6 inches in May). Inside the workable window, February and November are the driest, at 2.7 and 3.9 inches. The station averages about 78 days a year at 90°F or above.

We do not adjust the estimate by month, because we have no reliable published data on seasonal pricing. It is still worth asking contractors whether an off-peak start date changes their bid.

Monthly normals, Ft Smith Rgnl Ap (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan51302.9Cold
Feb57332.7Workable
Mar66423.9Workable
Apr75504.9Workable
May81605.6Workable
Jun89684.6Workable
Jul94723.4Hot
Aug94713.6Hot
Sep87634.0Workable
Oct76514.4Workable
Nov63403.9Workable
Dec53323.5Cold

Is Fort Smith cheap or dear? The local comparison

Contractors rarely work more than an hour or two from home, so the neighboring metros set a rough ceiling and floor for your quotes. Midpoints for 60 linear ft range from $1,150 to $1,300 across Fort Smith and its five closest metros.

Comparison with nearby areas
AreaRangeMidpointvs. here
Fort Smith, ARthis page$510 – $1,750$1,150
Fayetteville, AR50 miles$530 – $1,850$1,200+4%
Tulsa, OK110 miles$540 – $1,900$1,200+8%
Joplin, MO115 miles$580 – $2,050$1,300+15%
Little Rock, AR125 miles$510 – $1,800$1,150+2%
Texarkana, TX135 miles$520 – $1,850$1,150+3%
Arkansas (statewide)$510 – $1,800$1,150+1%
United States$600 – $2,100$1,350+19%

Out of the 300 metros we cover, Fort Smith ranks #299 for the cost of this job (#1 is the most expensive). Statewide, Fort Smith is 1% below the Arkansas figure.

Elsewhere in Arkansas

Arkansas metros compared with Fort Smith
MetroSizeRangeMidpointvs. here
Little Rock, AR358,210 jobs$510 – $1,800$1,150+2%
Fayetteville, AR275,180 jobs$530 – $1,850$1,200+4%
Jonesboro, AR60,620 jobs$510 – $1,800$1,150+2%

Metros of a similar size

Big cities and small ones price differently, so here is Fort Smith against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
Athens, GA95,800 jobs$530 – $1,850$1,200+5%
Macon, GA95,030 jobs$540 – $1,900$1,200+7%
Yakima, WA97,010 jobs$680 – $2,400$1,550+35%
Barnstable, MA94,110 jobs$680 – $2,400$1,550+36%

Related projects, priced for Fort Smith

Jobs that often go together with French drain are priced below at their usual sizes, using the same Fort Smith wage and price inputs. Compared with national midpoints, sod installation comes out highest (−10%) and gravel driveway lowest (−16%); the gap comes from the trades each job uses.

Related projects with local prices
ProjectSizeRangevs. US
Retaining wall200 sq ft of wall face$6,100 – $11,900−12%
Gravel driveway1,000 sq ft$2,100 – $8,550−16%
Sod installation1,500 sq ft$1,350 – $3,000−10%
Concrete slab400 sq ft$2,050 – $4,400−16%
Sprinkler system4,000 sq ft of lawn$3,350 – $8,450−16%
Inground pool450 sq ft$30,800 – $96,200−15%

Why two Fort Smith quotes can differ

  • Depth and soil

    Rocky or clay soil and long trenches raise excavation time.

  • Crawl space drains

    A crawl space French drain is $2,000-$8,000 installed.

  • Exterior versus interior

    A shallow exterior French drain is $10-$35 per linear foot; an interior basement drain is $40-$85 per foot, or $4,000-$17,000 installed (HomeGuide).

Cost by quality level and size in Fort Smith

The cited range is split into basic, standard and premium bands, then scaled to Fort Smith. Bands overlap, because plenty of standard jobs cost as much as a light premium one. Sizes run from short run (30 linear ft) to long run (120 linear ft).

Basic

$510 to $1,000

Shallow yard drain, easy digging

Standard

$880 to $1,400

Standard drain with fabric, gravel and a pop-up outlet

Premium

$1,250 to $1,750

Deep or long drain, hard soil, dry well or sump discharge

Cost by size and quality level
SizeBasicStandardPremium
short run (30 linear ft)$250 – $510$440 – $690$630 – $880
side yard (60 linear ft)$510 – $1,000$880 – $1,400$1,250 – $1,750
long run (120 linear ft)$1,000 – $2,000$1,750 – $2,800$2,550 – $3,550

What local crews earn in Fort Smith

The labor line is built from BLS wage data, one trade at a time. This job draws on 3 trades. We compare each trade's local median with the US median, weight the ratios by how much of the job each trade does, and apply the blend to the national labor cost. For Fort Smith the blend is 0.76.

For construction laborers (47-2061, weighted 50%) the local median is $17.77 an hour, which is 22% below the national $22.66. The middle half of them earn between $16.31 and $21.83 an hour. BLS counts 670 of them working in the area, 70.1 for every 10,000 jobs (US: 70.5), so the local bench is about average.

Operating engineers and other construction equipment operators (47-2073), 30% of the weighting: a median of $20.11 an hour, 30% below the US median of $28.78. The middle half of them earn between $18.15 and $21.12 an hour. About 440 work in the metro. That is 46.0 per 10,000 jobs, compared with 30.7 nationally, which suggests plenty of local crews to bid.

Pipelayers (47-2151) carry 20% of the labor weighting. BLS does not publish this trade for the Fort Smith metro, so we used the Arkansas statewide median: $18.10 an hour against $23.56 for the US. The middle half of them earn between $17.52 and $19.33 an hour.

A quick sensitivity check: moving the lead trade (construction laborers) from the median to the 75th percentile wage adds about $65 to the midpoint estimate; the 25th percentile takes off about $25. That is a swing of roughly 2.0% to 5.5% of the total, which is useful for judging whether a bid reflects wages or something else, such as scope or margin.

Fort Smith has 95,560 jobs in total (BLS, May 2025), ranking 210th by size among the 300 metros on this site.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Construction laborers (47-2061)50%$16.31$17.77$21.83$22.660.78metro
Operating engineers and other construction equipment operators (47-2073)30%$18.15$20.11$21.12$28.780.70metro
Pipelayers (47-2151)20%$17.52$18.10$19.33$23.560.77state
Blended100%0.76

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $880 to $1,400 for Fort Smith, AR is attached.

Take this estimate with you: PDF report, $9

The report lays out the french drain numbers for Fort Smith, AR line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

French drain in Fort Smith: your questions

+How much does it cost to install a French drain in Fort Smith?

For 60 linear ft, expect $510 to $1,750 in the Fort Smith area. A standard-spec job lands at $880 to $1,400. Small jobs usually cost more per linear ft and large ones less.

+What is the price per linear ft for French drain in Fort Smith?

About $8.40 to $29.50 per linear ft for materials and labor, plus $0 to $0 for the permit if one is needed. The US range is $10 to $35.

+Is French drain cheaper in Fort Smith or Fayetteville?

Fayetteville is 50 miles away. The midpoint for 60 linear ft there is $1,200, which is 4% more than Fort Smith ($1,150). Wage and materials indexes both feed that gap.

+How much of the bill is labor in Fort Smith?

About 47% at the midpoint, or $530 out of $1,150. Materials are 53% and permits 0%. Nationally, labor is 52%.

+What would side yard (60 linear ft) cost in Fort Smith?

$510 to $1,750. Pick a different size in the estimator above to get your own number.

+Does French drain need a permit in Fort Smith?

Often, but rules are set by your city or county building office, so call before you hire. Budget $0 to $0 for fees in the Fort Smith area (our national range of $0 to $0 scaled by the local price level).

+Is Fort Smith expensive for French drain compared with the rest of Arkansas?

Fort Smith is 1% below the Arkansas statewide estimate ($1,150 at the midpoint). We cover 4 metros in Arkansas; see the state page to compare them.

+What do construction laborers earn in Fort Smith?

The BLS median is $17.77 an hour in the Fort Smith area, compared with $22.66 nationally. The 25th to 75th percentile range is $16.31 to $21.83.

+What do basic and premium French drain work cost in Fort Smith?

For 60 linear ft, basic work runs $510 to $1,000 and premium work $1,250 to $1,750. Basic means: shallow yard drain, easy digging. Premium means: deep or long drain, hard soil, dry well or sump discharge.

+When is the best time to install a French drain in Fort Smith?

Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are February through June and September through November. February and November are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.

French drain near Fort Smith

French drain: all pricesFrench drain in ArkansasAll projects in Fort SmithArkansas cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.

Note on derived figures: Materials = 48% of the installed price, from Cost to Renovate's mid-range 'Outdoor Living' category split (44% labor, 48% materials). It is a category average, not a French-drain figure, so the materials line here is a rough one.