Concrete slab cost in Salt Lake City, UT

Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.

Typical range (400 sq ft)
$2,450 – $5,200
Per sq ft
$6 – $12
before permit
Versus US midpoint
Level
US $3,850
Rank of 300 metros
#121
1 = most expensive

A concrete slab in Salt Lake City, UT usually costs $2,450 to $5,200 for 400 sq ft. That works out to about $6 to $12 per sq ft before permits. That is within a few percent of the national midpoint, so there is little local premium or discount. Building materials run about 4% below the US average here (BEA goods price index 96.4).

Estimate your concrete slab cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

4-5 inch slab with rebar or heavier mesh and standard base prep

Add-ons

Estimated cost for 400 sq ft in Salt Lake City, UT, standard level

$3,250 to $4,350

About $7.80 to $10 per sq ft before permits. Labor is about 43% of the bill.

Cost breakdown
PartLowHigh
Materials$1,600$2,250
Labor$1,500$1,800
Permits and fees$160$300
Total$3,250$4,350
Save and get a PDF report

Cost breakdown for 400 sq ft in Salt Lake City, UT

Part of the jobLowMidpointHighShare
Materials$1,150$1,950$2,70051%
Labor$1,250$1,650$2,05043%
Permits and fees$50$230$4006%
Total$2,450$3,800$5,200100%

Why Salt Lake City prices look the way they do

Labor is 43% of the midpoint bill here, against 42% nationally. The mix of trades behind this job is cement masons and concrete finishers (50%), construction laborers (30%), operating engineers and other construction equipment operators (10%), carpenters (10%). We weight each trade's local median wage by that share and compare it with the national median. In Salt Lake City the blended ratio comes out at 1.04.

Materials are scaled with BEA's regional price parity for goods. Salt Lake City is at 96.4 against 100 for the US, so a materials line of $2,000 nationally becomes $1,950 here (midpoint, 400 sq ft). Permits follow the all-items index of 100.9: $50 to $400.

Why two Salt Lake City quotes can differ

  • Thickness and mix

    A 4-inch slab uses about 1.23 cubic yards of concrete per 100 sq ft; a 6-inch slab uses about 1.85. Stepping up from a 3,000 PSI to a 4,000-4,500 PSI mix adds $10-$40 per cubic yard (Estimators.us).

  • Base and reinforcement

    A compacted gravel base, vapor barrier, and wire mesh or rebar are priced separately by some contractors and bundled by others. Ask which one your quote does.

  • Truck and pump access

    If the mixer truck can't back up to the forms, someone has to wheelbarrow it in or hire a pump. Pump or line-pump hire is typically billed per day.

Optional extras in Salt Lake City

Add-ons start from national price ranges and are scaled by 1.00 for Salt Lake City, which is the average of the area's wage index (1.04) and goods price index (0.96). The estimator above can add them to your total.

Add-on prices
Add-onLocal range
Add rebar reinforcement$400 – $1,200
Remove old concrete first$800 – $2,400

Salt Lake City weather and the concrete slab calendar

Climate numbers on this page come from NOAA's 1991-2020 U.S. Climate Normals at the nearest suitable station, Salt Lake City Intl Ap (5 miles from the city center). They are 30-year averages, so any one year can run hotter, colder or wetter.

For pouring concrete, the comfortable months in Salt Lake City are April through June and September through October: 5 of 12. Outside them, January, February, March, November and December have an average overnight low of 40°F or below, and July and August have an average daytime high of 90°F or more.

The 40°F line is a deliberately cautious stand-in. The American Concrete Institute's cold-weather guide (ACI 306R-16) defines cold-weather concreting around an average daily air temperature below 40°F, which is colder than our test of an average overnight low at or below 40°F, so we flag a few extra shoulder months. In cold weather crews may need heated enclosures, insulating blankets or accelerated mixes, and those measures can raise a quote.

Heat matters for concrete as well. With average highs of 90°F or more in July and August, crews often start early, wet the base and plan for faster set times.

Salt Lake City gets about 16 inches of precipitation in a normal year, including roughly 52 inches of snow. The wettest months are March, April and May (2.2 inches in April). Inside the workable window, June and September are the driest, at 0.9 and 1.1 inches. The station averages about 62 days a year at 90°F or above.

We do not adjust the estimate by month, because we have no reliable published data on seasonal pricing. It is still worth asking contractors whether an off-peak start date changes their bid.

Monthly normals, Salt Lake City Intl Ap (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan39241.4Cold
Feb45291.3Cold
Mar55361.8Cold
Apr62422.2Workable
May73501.8Workable
Jun84590.9Workable
Jul94680.5Hot
Aug92670.6Hot
Sep81561.1Workable
Oct66441.3Workable
Nov51331.3Cold
Dec39251.4Cold

Planning more than one job in Salt Lake City?

Jobs that often go together with concrete slab are priced below at their usual sizes, using the same Salt Lake City wage and price inputs. Compared with national midpoints, concrete driveway comes out highest (+1%) and detached garage lowest (−2%); the gap comes from the trades each job uses.

Related projects with local prices
ProjectSizeRangevs. US
Concrete driveway600 sq ft$3,700 – $9,350+1%
Concrete patio300 sq ft$1,250 – $4,050+1%
Detached garage576 sq ft$28,300 – $56,900−2%
Stamped concrete400 sq ft$3,250 – $8,000level
Asphalt driveway600 sq ft$3,050 – $7,500+1%
Gravel driveway1,000 sq ft$2,500 – $10,100−1%

Is Salt Lake City cheap or dear? The local comparison

Contractors rarely work more than an hour or two from home, so the neighboring metros set a rough ceiling and floor for your quotes. Midpoints for 400 sq ft range from $3,550 to $3,800 across Salt Lake City and its five closest metros.

Comparison with nearby areas
AreaRangeMidpointvs. here
Salt Lake City, UTthis page$2,450 – $5,200$3,800
Provo, UT60 miles$2,350 – $4,950$3,650−4%
Ogden, UT70 miles$2,350 – $4,950$3,650−4%
Logan, UT110 miles$2,300 – $4,900$3,600−6%
Idaho Falls, ID210 miles$2,350 – $4,950$3,650−4%
St. George, UT230 miles$2,250 – $4,850$3,550−7%
Utah (statewide)$2,400 – $5,050$3,700−3%
United States$2,450 – $5,200$3,850level

Out of the 300 metros we cover, Salt Lake City ranks #121 for the cost of this job (#1 is the most expensive). Statewide, Salt Lake City is 3% above the Utah figure.

Elsewhere in Utah

Utah metros compared with Salt Lake City
MetroSizeRangeMidpointvs. here
Provo, UT304,660 jobs$2,350 – $4,950$3,650−4%
Ogden, UT271,370 jobs$2,350 – $4,950$3,650−4%
St. George, UT90,500 jobs$2,250 – $4,850$3,550−7%
Logan, UT66,800 jobs$2,300 – $4,900$3,600−6%

Metros of a similar size

Big cities and small ones price differently, so here is Salt Lake City against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
Cleveland, OH1,031,130 jobs$2,550 – $5,300$3,950+3%
Milwaukee, WI820,780 jobs$2,700 – $5,550$4,100+8%
Sacramento, CA1,080,590 jobs$2,750 – $5,750$4,250+11%
Jacksonville, FL765,930 jobs$2,250 – $4,850$3,550−7%

Pick a size, pick a tier: concrete slab pricing in Salt Lake City

The cited range is split into basic, standard and premium bands, then scaled to Salt Lake City. Bands overlap, because plenty of standard jobs cost as much as a light premium one. Sizes run from 10x10 pad (100 sq ft) to 30x40 foundation (1,200 sq ft).

Basic

$2,450 to $3,550

4-inch broom-finish slab, light mesh, easy truck access

Standard

$3,250 to $4,350

4-5 inch slab with rebar or heavier mesh and standard base prep

Premium

$4,100 to $5,200

6-inch slab, heavy reinforcement, thick base, pump truck or tight access

Cost by size and quality level
SizeBasicStandardPremium
10x10 pad (100 sq ft)$650 – $1,050$930 – $1,300$1,200 – $1,600
12x12 (144 sq ft)$910 – $1,400$1,300 – $1,750$1,650 – $2,100
20x20 (400 sq ft)$2,450 – $3,550$3,250 – $4,350$4,100 – $5,200
24x24 garage floor (576 sq ft)$3,500 – $5,000$4,650 – $6,150$5,750 – $7,300
30x40 foundation (1,200 sq ft)$7,250 – $10,200$9,500 – $12,500$11,700 – $14,700

What local crews earn in Salt Lake City

The labor line is built from BLS wage data, one trade at a time. This job draws on 4 trades. We compare each trade's local median with the US median, weight the ratios by how much of the job each trade does, and apply the blend to the national labor cost. For Salt Lake City the blend is 1.04.

Cement masons and concrete finishers (47-2051), 50% of the weighting: a median of $29.20 an hour, 7% above the US median of $27.41. The middle half of them earn between $23.93 and $30.40 an hour. About 1,850 work in the metro. That is 22.4 per 10,000 jobs, compared with 13.3 nationally, which suggests plenty of local crews to bid.

For construction laborers (47-2061, weighted 30%) the local median is $22.82 an hour, which is in line with the national $22.66. The middle half of them earn between $19.03 and $27.96 an hour. BLS counts 7,790 of them working in the area, 94.3 for every 10,000 jobs (US: 70.5), so the local bench is deeper than average.

Operating engineers and other construction equipment operators (47-2073), 10% of the weighting: a median of $29.69 an hour, 3% above the US median of $28.78. The middle half of them earn between $27.70 and $32.13 an hour. About 2,570 work in the metro. That is 31.1 per 10,000 jobs, compared with 30.7 nationally, so the supply of crews looks typical.

Carpenters (47-2031), 10% of the weighting: a median of $28.78 an hour, in line with the US median of $29.12. The middle half of them earn between $22.83 and $31.00 an hour. About 6,420 work in the metro. That is 77.7 per 10,000 jobs, compared with 43.1 nationally, which suggests plenty of local crews to bid.

A quick sensitivity check: moving the lead trade (cement masons and concrete finishers) from the median to the 75th percentile wage adds about $35 to the midpoint estimate; the 25th percentile takes off about $150. That is a swing of roughly 4.0% to 0.9% of the total, which is useful for judging whether a bid reflects wages or something else, such as scope or margin.

Salt Lake City-Murray has 826,210 jobs in total (BLS, May 2025), ranking 37th by size among the 300 metros on this site.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Cement masons and concrete finishers (47-2051)50%$23.93$29.20$30.40$27.411.07metro
Construction laborers (47-2061)30%$19.03$22.82$27.96$22.661.01metro
Operating engineers and other construction equipment operators (47-2073)10%$27.70$29.69$32.13$28.781.03metro
Carpenters (47-2031)10%$22.83$28.78$31.00$29.120.99metro
Blended100%1.04

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $3,250 to $4,350 for Salt Lake City, UT is attached.

A detailed PDF report of this estimate, $9

The report lays out the concrete slab numbers for Salt Lake City, UT line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Concrete slab in Salt Lake City: your questions

+How much does it cost to pour a concrete slab in Salt Lake City?

For 400 sq ft, expect $2,450 to $5,200 in the Salt Lake City area. A standard-spec job lands at $3,250 to $4,350. Small jobs usually cost more per sq ft and large ones less.

+What is the price per sq ft for concrete slab in Salt Lake City?

About $6 to $12 per sq ft for materials and labor, plus $50 to $400 for the permit if one is needed. The US range is $6 to $12.

+Is concrete slab cheaper in Salt Lake City or Provo?

Provo is 60 miles away. The midpoint for 400 sq ft there is $3,650, which is 4% less than Salt Lake City ($3,800). Wage and materials indexes both feed that gap.

+How much of the bill is labor in Salt Lake City?

About 43% at the midpoint, or $1,650 out of $3,800. Materials are 51% and permits 6%. Nationally, labor is 42%.

+What would 20x20 (400 sq ft) cost in Salt Lake City?

$2,450 to $5,200. Pick a different size in the estimator above to get your own number.

+Does concrete slab need a permit in Salt Lake City?

Often, but rules are set by your city or county building office, so call before you hire. Budget $50 to $400 for fees in the Salt Lake City area (our national range of $50 to $400 scaled by the local price level).

+Is Salt Lake City expensive for concrete slab compared with the rest of Utah?

Salt Lake City is 3% above the Utah statewide estimate ($3,700 at the midpoint). We cover 5 metros in Utah; see the state page to compare them.

+What do cement masons and concrete finishers earn in Salt Lake City?

The BLS median is $29.20 an hour in the Salt Lake City area, compared with $27.41 nationally. The 25th to 75th percentile range is $23.93 to $30.40.

+What do basic and premium concrete slab work cost in Salt Lake City?

For 400 sq ft, basic work runs $2,450 to $3,550 and premium work $4,100 to $5,200. Basic means: 4-inch broom-finish slab, light mesh, easy truck access. Premium means: 6-inch slab, heavy reinforcement, thick base, pump truck or tight access.

+When is the best time to pour a concrete slab in Salt Lake City?

Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are April through June and September through October. June and September are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.

+What does "add rebar reinforcement" add in Salt Lake City?

$400 to $1,200 for 400 sq ft, from a national range scaled by the local wage and goods indexes.

Concrete slab near Salt Lake City

Concrete slab: all pricesConcrete slab in UtahAll projects in Salt Lake CityUtah cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.