Concrete slab cost in Nebraska

Statewide estimate from BLS wages and BEA prices. Reviewed Nov 4, 2026.

Statewide range (400 sq ft)
$2,250 – $4,850
Per sq ft
$5.55 – $11
before permit
Versus US midpoint
−7%
US $3,850
Metros covered
2

What does it cost to pour a concrete slab in Nebraska? Plan on $2,250 to $4,850 for 400 sq ft. Wages (0.92x the US blend), materials (price index 94.1) and permit costs (90.1) put the state below the national midpoint by 7%.

Inside Nebraska, the metros we cover range from $3,550 (Lincoln) to $3,600 (Omaha) at the midpoint.

Estimate your concrete slab cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

4-5 inch slab with rebar or heavier mesh and standard base prep

Add-ons

Estimated cost for 400 sq ft in Nebraska (statewide), standard level

$3,050 to $4,050

About $7.25 to $9.50 per sq ft before permits. Labor is about 41% of the bill.

Cost breakdown
PartLowHigh
Materials$1,600$2,200
Labor$1,300$1,600
Permits and fees$140$270
Total$3,050$4,050
Save and get a PDF report

Cost breakdown for 400 sq ft in Nebraska

Part of the jobLowMidpointHighShare
Materials$1,150$1,900$2,65053%
Labor$1,100$1,450$1,85041%
Permits and fees$45$200$3606%
Total$2,250$3,550$4,850100%

Other Nebraska jobs that often go with concrete slab

The table prices neighboring jobs at their usual sizes using statewide Nebraska wages and prices. Against national midpoints, gravel driveway comes out highest (−4%) and detached garage lowest (−9%), because each job leans on different trades.

Related projects with local prices
ProjectSizeRangevs. US
Concrete driveway600 sq ft$3,400 – $8,500−8%
Concrete patio300 sq ft$1,150 – $3,700−8%
Detached garage576 sq ft$26,400 – $53,000−9%
Stamped concrete400 sq ft$3,050 – $7,400−7%
Asphalt driveway600 sq ft$2,850 – $6,950−6%
Gravel driveway1,000 sq ft$2,400 – $9,850−4%

Add-ons priced for Nebraska

Extras are quoted nationally and then scaled to Nebraska by the average of the local wage index (0.92) and goods index (0.94), a factor of 0.93. Tick any of them in the estimator above to add them to your total. Treat these as planning figures: an add-on touches different trades than the main job, so the scaling is an approximation.

Add-on prices
Add-onLocal range
Add rebar reinforcement$370 – $1,100
Remove old concrete first$740 – $2,250

Quality levels and sizes in Nebraska

The cited range is cut into three overlapping bands (basic, standard and premium) and scaled to statewide Nebraska wages and prices. The grid prices the same bands at 5 common sizes.

Basic

$2,250 to $3,300

4-inch broom-finish slab, light mesh, easy truck access

Standard

$3,050 to $4,050

4-5 inch slab with rebar or heavier mesh and standard base prep

Premium

$3,800 to $4,850

6-inch slab, heavy reinforcement, thick base, pump truck or tight access

Cost by size and quality level
SizeBasicStandardPremium
10x10 pad (100 sq ft)$600 – $950$860 – $1,200$1,150 – $1,500
12x12 (144 sq ft)$850 – $1,300$1,200 – $1,650$1,500 – $1,950
20x20 (400 sq ft)$2,250 – $3,300$3,050 – $4,050$3,800 – $4,850
24x24 garage floor (576 sq ft)$3,250 – $4,650$4,300 – $5,750$5,400 – $6,800
30x40 foundation (1,200 sq ft)$6,750 – $9,550$8,850 – $11,600$10,900 – $13,800

When Nebraska weather lets you pour

Season matters for concrete slab. For each Nebraska metro below we took NOAA's 1991-2020 monthly normals from the nearest suitable station and counted comfortable months for pouring concrete.

Omaha has the longest comfortable season of the metros we cover in Nebraska at 7 months (April through October); Lincoln has the shortest at 6 (May through October). Rainfall runs from 29 inches a year in Lincoln to 32 inches in Omaha.

We do not adjust prices by month, because we have no reliable published data on seasonal pricing. Timing is still worth raising when you collect bids.

Climate by metro (NOAA 1991-2020 normals)
MetroJan avg low °FJul avg high °FPrecip (in/yr)Comfortable months
Omaha1588327: April through October
Lincoln1489296: May through October

Nebraska versus the states around it

Nebraska ranks 39 of 51 (the 50 states plus DC) for concrete slab, where 1 is the most expensive. The costliest is Hawaii at $5,150 and the cheapest Arkansas at $3,350, both for 400 sq ft at the midpoint. Nebraska sits at $3,550. The five states closest by workforce center are listed below.

States near Nebraska, same project and size
StateDistanceRangeMidpointvs. here
Iowa190 miles away$2,400 – $5,000$3,700+4%
South Dakota220 miles away$2,250 – $4,800$3,500−1%
Kansas220 miles away$2,300 – $4,850$3,550level
Missouri270 miles away$2,500 – $5,250$3,900+10%
Minnesota320 miles away$2,700 – $5,650$4,150+17%

Concrete slab: what moves the price in Nebraska

  • Thickness and mix

    A 4-inch slab uses about 1.23 cubic yards of concrete per 100 sq ft; a 6-inch slab uses about 1.85. Stepping up from a 3,000 PSI to a 4,000-4,500 PSI mix adds $10-$40 per cubic yard (Estimators.us).

  • Base and reinforcement

    A compacted gravel base, vapor barrier, and wire mesh or rebar are priced separately by some contractors and bundled by others. Ask which one your quote does.

  • Truck and pump access

    If the mixer truck can't back up to the forms, someone has to wheelbarrow it in or hire a pump. Pump or line-pump hire is typically billed per day.

  • Small-job minimums

    Many crews have a minimum charge, so a 10x10 pad can cost more per square foot than a 20x20 slab.

  • Finish

    A broom finish is the baseline. Stamped, stained, or exposed-aggregate finishes are priced as add-ons on top of the slab.

What cement masons and concrete finishers and the other trades earn in Nebraska

Statewide wages come from BLS's state-level estimates, which blend big cities with small towns and rural areas. 4 trades drive the labor line for this job, and the weighted ratio against the national wage level is 0.92 for Nebraska.

For cement masons and concrete finishers (47-2051, weighted 50%) the local median is $23.80 an hour, which is 13% below the national $27.41. The middle half of them earn between $22.58 and $28.76 an hour. BLS counts 3,200 of them working in the state, 31.2 for every 10,000 jobs (US: 13.3), so the local bench is deeper than average.

Construction laborers (47-2061), 30% of the weighting: a median of $22.72 an hour, in line with the US median of $22.66. The middle half of them earn between $19.38 and $26.71 an hour. About 8,530 work in the state. That is 83.3 per 10,000 jobs, compared with 70.5 nationally, which suggests plenty of local crews to bid.

For operating engineers and other construction equipment operators (47-2073, weighted 10%) the local median is $28.06 an hour, which is in line with the national $28.78. The middle half of them earn between $23.05 and $30.52 an hour. BLS counts 3,180 of them working in the state, 31.0 for every 10,000 jobs (US: 30.7), so the local bench is about average.

For carpenters (47-2031, weighted 10%) the local median is $24.19 an hour, which is 17% below the national $29.12. The middle half of them earn between $21.77 and $30.09 an hour. BLS counts 5,710 of them working in the state, 55.7 for every 10,000 jobs (US: 43.1), so the local bench is deeper than average.

A crew paid at the 75th percentile for cement masons and concrete finishers ($28.76 an hour) would add about $140 to the statewide midpoint; one at the 25th percentile ($22.58) would take off about $35. Use that as a rough guide to how far a bid can sit from our midpoint on wages alone.

BLS counts 1,024,370 jobs across Nebraska (May 2025), which is 0.7% of US employment.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Cement masons and concrete finishers (47-2051)50%$22.58$23.80$28.76$27.410.87state
Construction laborers (47-2061)30%$19.38$22.72$26.71$22.661.00state
Operating engineers and other construction equipment operators (47-2073)10%$23.05$28.06$30.52$28.780.97state
Carpenters (47-2031)10%$21.77$24.19$30.09$29.120.83state
Blended100%0.92

Which Nebraska city is cheapest for concrete slab?

1 of the 2 metros sit above the statewide midpoint of $3,550, and the top-to-bottom gap is 1%. Each row prices the default size with that metro's own BLS wages and BEA price levels, so the gap between rows is real local variation rather than a flat markup.

MetroRange (400 sq ft)Midpointvs. state
Omaha, NE$2,300 – $4,850$3,600+1%
Lincoln, NE$2,300 – $4,850$3,550level

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $3,050 to $4,050 for Nebraska is attached.

Detailed concrete slab report for Nebraska, $9

Multi-page report for Nebraska: low, typical and high cost, a line-item breakdown of materials and labor by trade, permit notes, the best months to schedule, a quote comparison sheet, red flags, questions for contractors, checklists and every source. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Concrete slab in Nebraska: your questions

+How much does it cost to pour a concrete slab in Nebraska?

$2,250 to $4,850 for 400 sq ft, using statewide wages and prices. Metro areas inside Nebraska can sit above or below that.

+Which city in Nebraska is cheapest for concrete slab?

Lincoln at about $3,550 (midpoint, 400 sq ft). The priciest is Omaha at $3,600.

+Is concrete slab cheaper in Nebraska than the US average?

It is 7% cheaper: $3,550 against $3,850 for 400 sq ft at the midpoint.

+What share of the price is labor in Nebraska?

About 41% ($1,450). Materials are 53%. Statewide labor for this job is weighted 0.92x the national wage level.

+Does a concrete slab need a permit?

Often yes if it's structural (a garage floor or foundation) and often no for a small at-grade pad. Permit fees run $50-$400 depending on the city (HomeGuide).

+What do cement masons and concrete finishers earn in Nebraska?

The BLS statewide median is $23.80 an hour, against $27.41 for the US. The 25th to 75th percentile range is $22.58 to $28.76.

+Where does Nebraska rank for concrete slab costs?

39th most expensive of 51 (the 50 states plus DC) at the midpoint, $3,550 for 400 sq ft. Rank 1 is the costliest.

+What do basic and premium concrete slab work cost in Nebraska?

For 400 sq ft, basic work runs $2,250 to $3,300 and premium work $3,800 to $4,850. Basic means: 4-inch broom-finish slab, light mesh, easy truck access. Premium means: 6-inch slab, heavy reinforcement, thick base, pump truck or tight access.

+Does the season matter for concrete slab in Nebraska?

Yes where winters or summers are hard. Of the Nebraska metros we cover, Omaha has the most comfortable months (7 of 12) based on NOAA 1991-2020 normals. Our prices do not change by month, so ask contractors whether they charge more or less in busy and slow seasons.

+What does "add rebar reinforcement" add in Nebraska?

$370 to $1,100 for 400 sq ft, from a national range scaled by the statewide wage and goods indexes.

Concrete slab by city in Nebraska

Concrete slab: all pricesNebraska cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.