Concrete patio cost in Sioux City, IA
Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.
- Typical range (300 sq ft)
- $1,200 – $3,850
- Per sq ft
- $3.85 – $11.50
- before permit
- Versus US midpoint
- −4%
- US $2,650
- Rank of 300 metros
- #160
- 1 = most expensive
A concrete patio in Sioux City, IA usually costs $1,200 to $3,850 for 300 sq ft. That works out to about $3.85 to $11.50 per sq ft before permits. Compared with the national midpoint that is $100 less. Building materials run about 6% below the US average here (BEA goods price index 94.0).
Estimate your concrete patio cost
Pick a size, a quality level and where you live. Prices update as you type.
Estimated cost for 300 sq ft in Sioux City, IA, standard level
$2,000 to $3,050
About $6.20 to $9.35 per sq ft before permits. Labor is about 53% of the bill.
| Part | Low | High |
|---|---|---|
| Materials | $870 | $1,100 |
| Labor | $990 | $1,700 |
| Permits and fees | $130 | $260 |
| Total | $2,000 | $3,050 |
Cost breakdown for 300 sq ft in Sioux City, IA
| Part of the job | Low | Midpoint | High | Share |
|---|---|---|---|---|
| Materials | $710 | $990 | $1,250 | 39% |
| Labor | $450 | $1,350 | $2,250 | 53% |
| Permits and fees | $45 | $190 | $350 | 8% |
| Total | $1,200 | $2,550 | $3,850 | 100% |
Where the Sioux City price comes from
Labor is 53% of the midpoint bill here, against 51% nationally. The mix of trades behind this job is cement masons and concrete finishers (50%), construction laborers (30%), carpenters (10%), operating engineers and other construction equipment operators (10%). We weight each trade's local median wage by that share and compare it with the national median. In Sioux City the blended ratio comes out at 1.00.
Materials are scaled with BEA's regional price parity for goods. Sioux City is at 94.0 against 100 for the US, so a materials line of $1,050 nationally becomes $990 here (midpoint, 300 sq ft). Permits follow the all-items index of 86.5: $45 to $350.
What local crews earn in Sioux City
The labor line is built from BLS wage data, one trade at a time. This job draws on 4 trades. We compare each trade's local median with the US median, weight the ratios by how much of the job each trade does, and apply the blend to the national labor cost. For Sioux City the blend is 1.00.
Cement masons and concrete finishers (47-2051), 50% of the weighting: a median of $27.60 an hour, in line with the US median of $27.41. The middle half of them earn between $22.32 and $28.75 an hour. About 120 work in the metro. That is 16.0 per 10,000 jobs, compared with 13.3 nationally, which suggests plenty of local crews to bid.
For construction laborers (47-2061, weighted 30%) the local median is $23.38 an hour, which is 3% above the national $22.66. The middle half of them earn between $21.71 and $28.72 an hour. BLS counts 560 of them working in the area, 74.7 for every 10,000 jobs (US: 70.5), so the local bench is about average.
Carpenters (47-2031), 10% of the weighting: a median of $24.57 an hour, 16% below the US median of $29.12. The middle half of them earn between $22.02 and $29.52 an hour. About 350 work in the metro. That is 46.7 per 10,000 jobs, compared with 43.1 nationally, so the supply of crews looks typical.
Operating engineers and other construction equipment operators (47-2073), 10% of the weighting: a median of $28.43 an hour, in line with the US median of $28.78. The middle half of them earn between $24.63 and $30.32 an hour. About 200 work in the metro. That is 26.7 per 10,000 jobs, compared with 30.7 nationally, so the supply of crews looks typical.
A quick sensitivity check: moving the lead trade (cement masons and concrete finishers) from the median to the 75th percentile wage adds about $30 to the midpoint estimate; the 25th percentile takes off about $130. That is a swing of roughly 5.1% to 1.1% of the total, which is useful for judging whether a bid reflects wages or something else, such as scope or margin.
Sioux City has 75,010 jobs in total (BLS, May 2025), ranking 247th by size among the 300 metros on this site.
| Trade | Weight | 25th pct | Median | 75th pct | US median | Ratio | Level used |
|---|---|---|---|---|---|---|---|
| Cement masons and concrete finishers (47-2051) | 50% | $22.32 | $27.60 | $28.75 | $27.41 | 1.01 | metro |
| Construction laborers (47-2061) | 30% | $21.71 | $23.38 | $28.72 | $22.66 | 1.03 | metro |
| Carpenters (47-2031) | 10% | $22.02 | $24.57 | $29.52 | $29.12 | 0.84 | metro |
| Operating engineers and other construction equipment operators (47-2073) | 10% | $24.63 | $28.43 | $30.32 | $28.78 | 0.99 | metro |
| Blended | 100% | 1.00 | |||||
Sioux City weather and the concrete patio calendar
Climate numbers on this page come from NOAA's 1991-2020 U.S. Climate Normals at the nearest suitable station, Sioux City Gateway Ap (5 miles from the city center). They are 30-year averages, so any one year can run hotter, colder or wetter.
For pouring concrete, the comfortable months in Sioux City are May through September: 5 of 12. Outside them, January, February, March, April, October, November and December have an average overnight low of 40°F or below.
The 40°F line is a deliberately cautious stand-in. The American Concrete Institute's cold-weather guide (ACI 306R-16) defines cold-weather concreting around an average daily air temperature below 40°F, which is colder than our test of an average overnight low at or below 40°F, so we flag a few extra shoulder months. In cold weather crews may need heated enclosures, insulating blankets or accelerated mixes, and those measures can raise a quote.
Sioux City gets about 29 inches of precipitation in a normal year, including roughly 36 inches of snow. The wettest months are May, June and August (4.3 inches in June). Inside the workable window, July and September are the driest, at 3.4 and 2.8 inches. The station averages about 25 days a year at 90°F or above.
We do not adjust the estimate by month, because we have no reliable published data on seasonal pricing. It is still worth asking contractors whether an off-peak start date changes their bid.
| Month | Avg high °F | Avg low °F | Precip (in) | For this job |
|---|---|---|---|---|
| Jan | 30 | 10 | 0.7 | Cold |
| Feb | 34 | 15 | 0.9 | Cold |
| Mar | 48 | 26 | 1.8 | Cold |
| Apr | 61 | 37 | 3.1 | Cold |
| May | 72 | 49 | 3.9 | Workable |
| Jun | 82 | 59 | 4.3 | Workable |
| Jul | 85 | 63 | 3.4 | Workable |
| Aug | 83 | 61 | 3.9 | Workable |
| Sep | 77 | 51 | 2.8 | Workable |
| Oct | 63 | 38 | 2.2 | Cold |
| Nov | 47 | 25 | 1.3 | Cold |
| Dec | 33 | 15 | 1.0 | Cold |
Sioux City against nearby metros and the rest of Iowa
Contractors rarely work more than an hour or two from home, so the neighboring metros set a rough ceiling and floor for your quotes. Midpoints for 300 sq ft range from $2,400 to $2,650 across Sioux City and its five closest metros.
| Area | Range | Midpoint | vs. here |
|---|---|---|---|
| Sioux City, IAthis page | $1,200 – $3,850 | $2,550 | |
| Sioux Falls, SD75 miles | $1,150 – $3,700 | $2,400 | −4% |
| Omaha, NE85 miles | $1,150 – $3,750 | $2,450 | −3% |
| Lincoln, NE120 miles | $1,150 – $3,700 | $2,450 | −4% |
| Des Moines, IA145 miles | $1,200 – $4,000 | $2,600 | +3% |
| Waterloo, IA195 miles | $1,250 – $4,050 | $2,650 | +5% |
| Iowa (statewide) | $1,200 – $3,900 | $2,550 | +1% |
| United States | $1,250 – $4,000 | $2,650 | +4% |
Out of the 300 metros we cover, Sioux City ranks #160 for the cost of this job (#1 is the most expensive). Statewide, Sioux City is 1% below the Iowa figure.
Elsewhere in Iowa
| Metro | Size | Range | Midpoint | vs. here |
|---|---|---|---|---|
| Des Moines, IA | 404,130 jobs | $1,200 – $4,000 | $2,600 | +3% |
| Davenport, IA | 180,450 jobs | $1,250 – $4,050 | $2,650 | +5% |
| Cedar Rapids, IA | 139,260 jobs | $1,200 – $3,900 | $2,550 | +2% |
| Iowa City, IA | 93,760 jobs | $1,200 – $3,900 | $2,550 | level |
| Waterloo, IA | 84,260 jobs | $1,250 – $4,050 | $2,650 | +5% |
| Dubuque, IA | 58,470 jobs | $1,200 – $3,900 | $2,550 | +2% |
Metros of a similar size
Big cities and small ones price differently, so here is Sioux City against the 4 metros with the closest total employment.
| Metro | Size | Range | Midpoint | vs. here |
|---|---|---|---|---|
| Abilene, TX | 75,070 jobs | $1,100 – $3,450 | $2,250 | −10% |
| Blacksburg, VA | 74,070 jobs | $1,150 – $3,550 | $2,350 | −7% |
| Kenosha, WI | 75,450 jobs | $1,350 – $4,250 | $2,800 | +10% |
| Rapid City, SD | 73,820 jobs | $1,150 – $3,650 | $2,400 | −5% |
Why two Sioux City quotes can differ
Permit
Permits run $50-$400 where required. Many cities don't require one for a small at-grade patio.
Finish
Plain concrete is $4-$12 per sq ft and a broom finish $6-$13; designs with several colors and decorative finishes run up to about $28 (HomeGuide).
Site prep
Excavation, forms and a gravel base are the unglamorous part of the bill and vary most with soil and slope.
Optional extras in Sioux City
Add-ons start from national price ranges and are scaled by 0.97 for Sioux City, which is the average of the area's wage index (1.00) and goods price index (0.94). The estimator above can add them to your total.
| Add-on | Local range |
|---|---|
| Add an acid or water-based stain | $870 – $2,900 |
Planning more than one job in Sioux City?
Jobs that often go together with concrete patio are priced below at their usual sizes, using the same Sioux City wage and price inputs. Compared with national midpoints, paver patio comes out highest (level) and wood deck lowest (−9%); the gap comes from the trades each job uses.
| Project | Size | Range | vs. US |
|---|---|---|---|
| Concrete slab | 400 sq ft | $2,350 – $4,950 | −4% |
| Stamped concrete | 400 sq ft | $3,150 – $7,750 | −3% |
| Paver patio | 300 sq ft | $3,000 – $5,450 | level |
| Wood deck | 300 sq ft | $6,900 – $13,800 | −9% |
| Concrete driveway | 600 sq ft | $3,550 – $9,000 | −2% |
| Asphalt driveway | 600 sq ft | $3,000 – $7,350 | −1% |
Pick a size, pick a tier: concrete patio pricing in Sioux City
The cited range is split into basic, standard and premium bands, then scaled to Sioux City. Bands overlap, because plenty of standard jobs cost as much as a light premium one. Sizes run from 10x10 (100 sq ft) to 20x20 (400 sq ft).
Basic
$1,200 to $2,250
Plain gray slab, broom finish, flat yard
Standard
$2,000 to $3,050
Colored or stained, saw-cut joints, minor grading
Premium
$2,800 to $3,850
Exposed aggregate or heavy decorative finish, drainage work
| Size | Basic | Standard | Premium |
|---|---|---|---|
| 10x10 (100 sq ft) | $430 – $860 | $750 – $1,200 | $1,100 – $1,500 |
| 12x16 (192 sq ft) | $780 – $1,500 | $1,300 – $2,050 | $1,850 – $2,600 |
| 20x20 (400 sq ft) | $1,600 – $2,950 | $2,600 – $4,000 | $3,650 – $5,050 |
Get 3 local quotes
Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $2,000 to $3,050 for Sioux City, IA is attached.
Take this estimate with you: PDF report, $9
The report lays out the concrete patio numbers for Sioux City, IA line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.
Concrete patio in Sioux City: your questions
+How much does it cost to pour a concrete patio in Sioux City?
For 300 sq ft, expect $1,200 to $3,850 in the Sioux City area. A standard-spec job lands at $2,000 to $3,050. Small jobs usually cost more per sq ft and large ones less.
+What is the price per sq ft for concrete patio in Sioux City?
About $3.85 to $11.50 per sq ft for materials and labor, plus $45 to $350 for the permit if one is needed. The US range is $4 to $12.
+Is concrete patio cheaper in Sioux City or Sioux Falls?
Sioux Falls is 75 miles away. The midpoint for 300 sq ft there is $2,400, which is 4% less than Sioux City ($2,550). Wage and materials indexes both feed that gap.
+How much of the bill is labor in Sioux City?
About 53% at the midpoint, or $1,350 out of $2,550. Materials are 39% and permits 8%. Nationally, labor is 51%.
+What would 12x16 (192 sq ft) cost in Sioux City?
$780 to $2,600. Pick a different size in the estimator above to get your own number.
+Does concrete patio need a permit in Sioux City?
Often, but rules are set by your city or county building office, so call before you hire. Budget $45 to $350 for fees in the Sioux City area (our national range of $50 to $400 scaled by the local price level).
+Is Sioux City expensive for concrete patio compared with the rest of Iowa?
Sioux City is 1% below the Iowa statewide estimate ($2,550 at the midpoint). We cover 7 metros in Iowa; see the state page to compare them.
+What do cement masons and concrete finishers earn in Sioux City?
The BLS median is $27.60 an hour in the Sioux City area, compared with $27.41 nationally. The 25th to 75th percentile range is $22.32 to $28.75.
+What do basic and premium concrete patio work cost in Sioux City?
For 300 sq ft, basic work runs $1,200 to $2,250 and premium work $2,800 to $3,850. Basic means: plain gray slab, broom finish, flat yard. Premium means: exposed aggregate or heavy decorative finish, drainage work.
+When is the best time to pour a concrete patio in Sioux City?
Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are May through September. July and September are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.
+What does "add an acid or water-based stain" add in Sioux City?
$870 to $2,900 for 300 sq ft, from a national range scaled by the local wage and goods indexes.
Concrete patio near Sioux City
Where these numbers come from
Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.
- HomeGuide: How Much Does a Concrete Patio Cost? (2026) (accessed November 4, 2026)
- SimplyWise: Concrete Estimate Template: Free PDF + Excel (2026) (accessed November 4, 2026)
- HomeGuide: How Much Does Stamped Concrete Cost? (2026) (accessed November 4, 2026)
- BLS Occupational Employment and Wage Statistics, May 2025
- BEA Regional Price Parities, 2024
- NOAA NCEI U.S. Climate Normals, 1991-2020
Note on derived figures: Materials = SimplyWise's sample 200 sq ft broom-finish patio line ($500-$900 in materials) divided by 200 sq ft.