Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.

Typical range (600 sq ft)
$4,300 – $11,100
Per sq ft
$7.10 – $18
before permit
Versus US midpoint
+20%
US $6,450
Rank of 300 metros
#17
1 = most expensive

Kennewick homeowners pay roughly $4,300 to $11,100 to pour a concrete driveway at 600 sq ft, or $7.10 to $18 per sq ft (permit not included). Against the US midpoint, Kennewick is 20% higher. Cement masons and concrete finishers earn a median of $37.23 an hour in the Kennewick area, 36% above the US median of $27.41.

Estimate your concrete driveway cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

5-inch with rebar and saw-cut joints, a border or one color

Add-ons

Estimated cost for 600 sq ft in Kennewick, WA, standard level

$6,350 to $9,050

About $10.50 to $15 per sq ft before permits. Labor is about 73% of the bill.

Cost breakdown
PartLowHigh
Materials$1,750$2,200
Labor$4,500$6,700
Permits and fees$95$160
Total$6,350$9,050
Save and get a PDF report

Cost breakdown for 600 sq ft in Kennewick, WA

Part of the jobLowMidpointHighShare
Materials$1,450$2,000$2,50026%
Labor$2,800$5,600$8,35073%
Permits and fees$50$130$2002%
Total$4,300$7,700$11,100100%

Why Kennewick prices look the way they do

The wage side of the estimate leans on cement masons and concrete finishers, who do 50% of the hours on a typical job. Their local median is $37.23 an hour. Add the other trades involved and the blended wage index for Kennewick is 1.27 (US = 1.00), which puts labor at 73% of the total.

On the materials line, the BEA goods price index for the Kennewick metro is 105.0 (US = 100). The midpoint materials bill for 600 sq ft comes to $2,000, compared with $1,900 at national prices. Permit and inspection fees are scaled by the broader index (100.1) and land at $50 to $200.

Kennewick: what basic, standard and premium work costs

Three bands are cut from the same cited range and localized for Kennewick wages and prices. They overlap on purpose: a good standard job and a modest premium job can cost the same. The grid below prices the same bands at 4 common sizes.

Basic

$4,300 to $7,000

Plain gray, 4-inch broom finish, flat site

Standard

$6,350 to $9,050

5-inch with rebar and saw-cut joints, a border or one color

Premium

$8,400 to $11,100

6-inch for heavy vehicles, stamped or colored, grading needed

Cost by size and quality level
SizeBasicStandardPremium
1-car (12x20), 240 sq ft$1,750 – $2,850$2,600 – $3,700$3,450 – $4,550
2-car (20x24), 480 sq ft$3,450 – $5,650$5,100 – $7,250$6,750 – $8,900
2-car + apron (600 sq ft)$4,300 – $7,000$6,350 – $9,050$8,400 – $11,100
3-car (900 sq ft)$6,450 – $10,500$9,450 – $13,500$12,500 – $16,500

Concrete driveway: what moves the price in Kennewick

  • Grading and drainage

    Professional grading runs $3-$8 per sq ft or $700-$2,500 for a typical job. A sloped lot or poor soil raises it.

  • Finish

    Decorative driveways run $10-$25 per sq ft installed: colors and borders at $10-$15, stamped patterns at $15-$20, and high-end finishes at $20-$25+ (HomeGuide).

  • Permits and the apron

    A driveway permit is typically $50-$200 and is often required for new work. The apron where the driveway meets the street can need a separate right-of-way permit.

Local wages behind the labor line

Wages are the part of this estimate that changes most from town to town. 4 trades carry the job here, and each is compared with its US median. The weighted result for Kennewick is 1.27 times the national level.

For cement masons and concrete finishers (47-2051, weighted 50%) the local median is $37.23 an hour, which is 36% above the national $27.41. The middle half of them earn between $28.25 and $43.89 an hour. BLS counts 290 of them working in the area, 22.4 for every 10,000 jobs (US: 13.3), so the local bench is deeper than average.

Construction laborers (47-2061), 30% of the weighting: a median of $26.32 an hour, 16% above the US median of $22.66. The middle half of them earn between $21.79 and $33.92 an hour. About 1,110 work in the metro. That is 85.7 per 10,000 jobs, compared with 70.5 nationally, which suggests plenty of local crews to bid.

For operating engineers and other construction equipment operators (47-2073, weighted 10%) the local median is $38.39 an hour, which is 33% above the national $28.78. The middle half of them earn between $33.53 and $48.81 an hour. BLS counts 460 of them working in the area, 35.5 for every 10,000 jobs (US: 30.7), so the local bench is deeper than average.

For carpenters (47-2031, weighted 10%) the local median is $30.92 an hour, which is 6% above the national $29.12. The middle half of them earn between $29.03 and $48.19 an hour. BLS counts 1,310 of them working in the area, 101.2 for every 10,000 jobs (US: 43.1), so the local bench is deeper than average.

Quotes come from real crews, not medians. If the cement masons and concrete finishers on your job are paid at the 75th percentile ($43.89 an hour) instead of the median, the labor line grows by about $540. At the 25th percentile ($28.25) it shrinks by about $720. The total moves by 7.0% or 9.4%, so wages alone rarely explain a quote that is far outside our range.

For context on the local economy, BLS counts 129,490 jobs in the Kennewick-Richland area. That makes it the 169th largest of the 300 metros we cover, with 0.08% of US employment.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Cement masons and concrete finishers (47-2051)50%$28.25$37.23$43.89$27.411.36metro
Construction laborers (47-2061)30%$21.79$26.32$33.92$22.661.16metro
Operating engineers and other construction equipment operators (47-2073)10%$33.53$38.39$48.81$28.781.33metro
Carpenters (47-2031)10%$29.03$30.92$48.19$29.121.06metro
Blended100%1.27

Add-ons priced for Kennewick

Extras are quoted nationally and then scaled to Kennewick by the average of the local wage index (1.27) and goods index (1.05), a factor of 1.16. Tick any of them in the estimator above to add them to your total. Treat these as planning figures: an add-on touches different trades than the main job, so the scaling is an approximation.

Add-on prices
Add-onLocal range
Add rebar reinforcement$700 – $2,100
Remove the old driveway$1,400 – $4,150

What nearby projects cost in Kennewick

Because every project leans on different trades, Kennewick's wage level does not move all prices equally. Against the US midpoint, asphalt driveway runs +20% and concrete slab +14%.

Related projects with local prices
ProjectSizeRangevs. US
Asphalt driveway600 sq ft$3,600 – $9,000+20%
Gravel driveway1,000 sq ft$2,900 – $11,700+15%
Concrete slab400 sq ft$2,850 – $5,900+14%
Stamped concrete400 sq ft$3,750 – $9,300+17%
Paver patio300 sq ft$3,450 – $6,250+15%
Concrete patio300 sq ft$1,400 – $4,650+16%

When to schedule concrete driveway in Kennewick

We use NOAA's 1991-2020 climate normals for Pasco Tri Cities Ap (5 miles from the city center). These are 30-year monthly averages, not forecasts.

May through June and September are the stretches where pouring concrete runs into the fewest weather problems in Kennewick (3 of 12 months). January, February, March, April, October, November and December have an average overnight low of 40°F or below; July and August have an average daytime high of 90°F or more.

The 40°F line is a deliberately cautious stand-in. The American Concrete Institute's cold-weather guide (ACI 306R-16) defines cold-weather concreting around an average daily air temperature below 40°F, which is colder than our test of an average overnight low at or below 40°F, so we flag a few extra shoulder months. In cold weather crews may need heated enclosures, insulating blankets or accelerated mixes, and those measures can raise a quote.

Heat matters for concrete as well. With average highs of 90°F or more in July and August, crews often start early, wet the base and plan for faster set times.

Kennewick gets about 8 inches of precipitation in a normal year. The wettest months are January, November and December (1.0 inches in January). Inside the workable window, June and September are the driest, at 0.6 and 0.3 inches. The station averages about 55 days a year at 90°F or above.

Does the season change the price? Probably, but we do not have a sourced seasonal price curve, so the estimator shows a year-round figure and does not adjust by month. When you collect quotes, ask whether scheduling in a slower month gets a better rate.

Monthly normals, Pasco Tri Cities Ap (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan41281.0Cold
Feb49280.6Cold
Mar59330.7Cold
Apr67380.7Cold
May77460.7Workable
Jun83530.6Workable
Jul93570.1Hot
Aug91560.3Hot
Sep81480.3Workable
Oct66380.7Cold
Nov50320.9Cold
Dec41271.0Cold

Kennewick against nearby metros and the rest of Washington

Of the five closest metros, 3 are cheaper than Kennewick. Coeur d'Alene is the lowest at about $6,500 (midpoint, 600 sq ft), 150 miles away.

Comparison with nearby areas
AreaRangeMidpointvs. here
Kennewick, WAthis page$4,300 – $11,100$7,700
Yakima, WA70 miles$4,400 – $11,300$7,850+2%
Spokane, WA140 miles$4,200 – $10,700$7,450−3%
Seattle, WA145 miles$4,550 – $11,800$8,150+6%
Coeur d'Alene, ID150 miles$3,650 – $9,300$6,500−16%
Portland, OR165 miles$4,300 – $11,000$7,650level
Washington (statewide)$4,400 – $11,300$7,850+2%
United States$3,650 – $9,200$6,450−17%

Across 300 US metros, Kennewick comes in at #17 from the top. The priciest is Kahului, HI at $10,000; the cheapest is McAllen, TX at $4,950 (midpoints, 600 sq ft). Statewide, Kennewick is 2% below the Washington figure.

Other Washington metros

Washington metros compared with Kennewick
MetroSizeRangeMidpointvs. here
Seattle, WA2,086,210 jobs$4,550 – $11,800$8,150+6%
Spokane, WA255,820 jobs$4,200 – $10,700$7,450−3%
Olympia, WA130,300 jobs$4,350 – $11,200$7,750+1%
Yakima, WA97,010 jobs$4,400 – $11,300$7,850+2%
Bremerton, WA93,740 jobs$4,300 – $11,100$7,700level
Bellingham, WA91,390 jobs$4,450 – $11,500$7,950+4%

Cities with a workforce like Kennewick's

Big cities and small ones price differently, so here is Kennewick against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
Waco, TX129,860 jobs$3,100 – $7,650$5,350−30%
Elkhart, IN127,730 jobs$3,700 – $9,500$6,600−14%
Olympia, WA130,300 jobs$4,350 – $11,200$7,750+1%
Norwich, CT126,450 jobs$3,750 – $9,550$6,650−14%

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $6,350 to $9,050 for Kennewick, WA is attached.

Detailed concrete driveway report for Kennewick, WA, $9

Multi-page report for Kennewick, WA: low, typical and high cost, a line-item breakdown of materials and labor by trade, permit notes, the best months to schedule, a quote comparison sheet, red flags, questions for contractors, checklists and every source. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Concrete driveway in Kennewick: your questions

+How much does it cost to pour a concrete driveway in Kennewick?

For 600 sq ft, expect $4,300 to $11,100 in the Kennewick area. A standard-spec job lands at $6,350 to $9,050. Small jobs usually cost more per sq ft and large ones less.

+What is the price per sq ft for concrete driveway in Kennewick?

About $7.10 to $18 per sq ft for materials and labor, plus $50 to $200 for the permit if one is needed. The US range is $6 to $15.

+Is concrete driveway cheaper in Kennewick or Yakima?

Yakima is 70 miles away. The midpoint for 600 sq ft there is $7,850, which is 2% more than Kennewick ($7,700). Wage and materials indexes both feed that gap.

+How much of the bill is labor in Kennewick?

About 73% at the midpoint, or $5,600 out of $7,700. Materials are 26% and permits 2%. Nationally, labor is 69%.

+What would 2-car + apron (600 sq ft) cost in Kennewick?

$4,300 to $11,100. Pick a different size in the estimator above to get your own number.

+Does concrete driveway need a permit in Kennewick?

Often, but rules are set by your city or county building office, so call before you hire. Budget $50 to $200 for fees in the Kennewick area (our national range of $50 to $200 scaled by the local price level).

+Is Kennewick expensive for concrete driveway compared with the rest of Washington?

Kennewick is 2% below the Washington statewide estimate ($7,850 at the midpoint). We cover 7 metros in Washington; see the state page to compare them.

+What do cement masons and concrete finishers earn in Kennewick?

The BLS median is $37.23 an hour in the Kennewick area, compared with $27.41 nationally. The 25th to 75th percentile range is $28.25 to $43.89.

+What do basic and premium concrete driveway work cost in Kennewick?

For 600 sq ft, basic work runs $4,300 to $7,000 and premium work $8,400 to $11,100. Basic means: plain gray, 4-inch broom finish, flat site. Premium means: 6-inch for heavy vehicles, stamped or colored, grading needed.

+When is the best time to pour a concrete driveway in Kennewick?

Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are May through June and September. June and September are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.

+What does "add rebar reinforcement" add in Kennewick?

$700 to $2,100 for 600 sq ft, from a national range scaled by the local wage and goods indexes.

Concrete driveway near Kennewick

Concrete driveway: all pricesConcrete driveway in WashingtonAll projects in KennewickWashington cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.

Note on derived figures: Materials = SimplyWise's sample 600 sq ft, 4-inch driveway line ($1,400-$2,400 in materials) divided by 600 sq ft.