Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.

Typical range (300 sq ft)
$12,400 – $24,900
Per sq ft
$41 – $82.50
before permit
Versus US midpoint
+3%
US $18,100
Rank of 300 metros
#67
1 = most expensive

A composite deck in Providence, RI usually costs $12,400 to $24,900 for 300 sq ft. That works out to about $41 to $82.50 per sq ft before permits. That is within a few percent of the national midpoint, so there is little local premium or discount. Carpenters earn a median of $29.76 an hour in the Providence area, 2% above the US median of $29.12.

Estimate your composite deck cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

Mid-grade capped boards with railing and stairs

Add-ons

Estimated cost for 300 sq ft in Providence, RI, standard level

$16,100 to $21,100

About $53.50 to $70 per sq ft before permits. Labor is about 62% of the bill.

Cost breakdown
PartLowHigh
Materials$6,050$7,900
Labor$10,000$13,100
Permits and fees$80$120
Total$16,100$21,100
Save and get a PDF report

Cost breakdown for 300 sq ft in Providence, RI

Part of the jobLowMidpointHighShare
Materials$4,650$7,000$9,30038%
Labor$7,700$11,500$15,40062%
Permits and fees$50$100$1501%
Total$12,400$18,600$24,900100%

What is behind the Providence number

The wage side of the estimate leans on carpenters, who do 80% of the hours on a typical job. Their local median is $29.76 an hour. Add the other trades involved and the blended wage index for Providence is 1.07 (US = 1.00), which puts labor at 62% of the total.

Materials are scaled with BEA's regional price parity for goods. Providence is at 97.1 against 100 for the US, so a materials line of $7,200 nationally becomes $7,000 here (midpoint, 300 sq ft). Permits follow the all-items index of 101.8: $50 to $150.

How Providence compares

Contractors rarely work more than an hour or two from home, so the neighboring metros set a rough ceiling and floor for your quotes. Midpoints for 300 sq ft range from $18,600 to $20,900 across Providence and its five closest metros.

Comparison with nearby areas
AreaRangeMidpointvs. here
Providence, RIthis page$12,400 – $24,900$18,600
Norwich, CT45 miles$12,400 – $24,900$18,700level
Worcester, MA55 miles$13,500 – $27,100$20,300+9%
Boston, MA60 miles$13,900 – $27,900$20,900+12%
Barnstable, MA60 miles$13,300 – $26,600$19,900+7%
Hartford, CT65 miles$12,600 – $25,300$18,900+2%
Rhode Island (statewide)$12,200 – $24,600$18,400−1%
United States$12,100 – $24,200$18,100−3%

Out of the 300 metros we cover, Providence ranks #67 for the cost of this job (#1 is the most expensive). Statewide, Providence is 1% above the Rhode Island figure.

Providence is the only Rhode Island metro we cover, so the statewide page is the only in-state comparison. It uses statewide wages, which include rural areas.

Metros of a similar size

Big cities and small ones price differently, so here is Providence against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
Raleigh, NC743,120 jobs$10,900 – $21,900$16,400−12%
Louisville, KY685,190 jobs$11,500 – $23,000$17,300−7%
Virginia Beach, VA763,060 jobs$10,800 – $21,600$16,200−13%
Oklahoma City, OK677,680 jobs$10,400 – $20,900$15,600−16%

Providence weather and the composite deck calendar

Climate numbers on this page come from NOAA's 1991-2020 U.S. Climate Normals at the nearest suitable station, Providence T F Green Ap (5 miles from the city center). They are 30-year averages, so any one year can run hotter, colder or wetter.

For exterior installation, the comfortable months in Providence are March through November: 9 of 12. Outside them, January, February and December have an average daytime high under 45°F.

In January, February and December the average high stays below 45°F. Sealants, adhesives and some materials, such as vinyl, are harder to install well in the cold, and short daylight cuts the working day.

Providence gets about 48 inches of precipitation in a normal year, including roughly 37 inches of snow. The wettest months are March, April and December (4.9 inches in March). Inside the workable window, May and July are the driest, at 3.4 and 2.9 inches. The station averages about 12 days a year at 90°F or above.

We do not adjust the estimate by month, because we have no reliable published data on seasonal pricing. It is still worth asking contractors whether an off-peak start date changes their bid.

Monthly normals, Providence T F Green Ap (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan38224.0Cold
Feb41243.4Cold
Mar48304.9Workable
Apr59404.3Workable
May69493.4Workable
Jun78593.8Workable
Jul84652.9Workable
Aug82643.6Workable
Sep75574.2Workable
Oct64454.2Workable
Nov53364.3Workable
Dec43284.7Cold

What local crews earn in Providence

The labor line is built from BLS wage data, one trade at a time. This job draws on 2 trades. We compare each trade's local median with the US median, weight the ratios by how much of the job each trade does, and apply the blend to the national labor cost. For Providence the blend is 1.07.

Carpenters (47-2031), 80% of the weighting: a median of $29.76 an hour, in line with the US median of $29.12. The middle half of them earn between $26.71 and $38.38 an hour. About 4,140 work in the metro. That is 58.0 per 10,000 jobs, compared with 43.1 nationally, which suggests plenty of local crews to bid.

For construction laborers (47-2061, weighted 20%) the local median is $28.50 an hour, which is 26% above the national $22.66. The middle half of them earn between $23.10 and $37.25 an hour. BLS counts 3,240 of them working in the area, 45.4 for every 10,000 jobs (US: 70.5), so the local bench is thinner than average.

A quick sensitivity check: moving the lead trade (carpenters) from the median to the 75th percentile wage adds about $2,550 to the midpoint estimate; the 25th percentile takes off about $900. That is a swing of roughly 4.9% to 13.7% of the total, which is useful for judging whether a bid reflects wages or something else, such as scope or margin.

Providence-Warwick has 714,120 jobs in total (BLS, May 2025), ranking 42nd by size among the 300 metros on this site.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Carpenters (47-2031)80%$26.71$29.76$38.38$29.121.02metro
Construction laborers (47-2061)20%$23.10$28.50$37.25$22.661.26metro
Blended100%1.07

Optional extras in Providence

Add-ons start from national price ranges and are scaled by 1.02 for Providence, which is the average of the area's wage index (1.07) and goods price index (0.97). The estimator above can add them to your total.

Add-on prices
Add-onLocal range
Add a deck railing (approx. 0.3 ft per sq ft)$1,850 – $5,500

Why two Providence quotes can differ

  • Board grade

    Composite materials run $16-$32 per sq ft and the installed price is $40-$80 per sq ft, including the substructure (HomeGuide).

  • Labor

    Labor for composite is $24-$48 per sq ft, higher than wood because the boards need extra parts and more careful assembly.

  • Drainage

    Ground-level decks over poorly draining yards may need $1,000-$4,000 of drainage work first.

Related projects, priced for Providence

Jobs that often go together with composite deck are priced below at their usual sizes, using the same Providence wage and price inputs. Compared with national midpoints, paver patio comes out highest (+16%) and wood deck lowest (+1%); the gap comes from the trades each job uses.

Related projects with local prices
ProjectSizeRangevs. US
Wood deck300 sq ft$7,650 – $15,400+1%
Concrete patio300 sq ft$1,300 – $4,300+7%
Paver patio300 sq ft$3,450 – $6,350+16%
Gutters160 linear ft$1,350 – $4,300+3%

Cost by quality level and size in Providence

The cited range is split into basic, standard and premium bands, then scaled to Providence. Bands overlap, because plenty of standard jobs cost as much as a light premium one. Sizes run from 10x12 (120 sq ft) to 20x20 (400 sq ft).

Basic

$12,400 to $17,400

Entry-level composite boards, low deck, simple shape

Standard

$16,100 to $21,100

Mid-grade capped boards with railing and stairs

Premium

$19,900 to $24,900

Premium capped or PVC boards, multi-level, hidden fasteners

Cost by size and quality level
SizeBasicStandardPremium
10x12 (120 sq ft)$5,000 – $7,000$6,500 – $8,550$8,000 – $10,000
12x12 (144 sq ft)$6,000 – $8,400$7,800 – $10,200$9,600 – $12,000
16x20 (320 sq ft)$13,200 – $18,500$17,200 – $22,500$21,200 – $26,500
20x20 (400 sq ft)$16,500 – $23,200$21,500 – $28,100$26,500 – $33,100

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $16,100 to $21,100 for Providence, RI is attached.

A detailed PDF report of this estimate, $9

Multi-page report for Providence, RI: low, typical and high cost, a line-item breakdown of materials and labor by trade, permit notes, the best months to schedule, a quote comparison sheet, red flags, questions for contractors, checklists and every source. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Composite deck in Providence: your questions

+How much does it cost to build a composite deck in Providence?

For 300 sq ft, expect $12,400 to $24,900 in the Providence area. A standard-spec job lands at $16,100 to $21,100. Small jobs usually cost more per sq ft and large ones less.

+What is the price per sq ft for composite deck in Providence?

About $41 to $82.50 per sq ft for materials and labor, plus $50 to $150 for the permit if one is needed. The US range is $40 to $80.

+Is composite deck cheaper in Providence or Norwich?

Norwich is 45 miles away. The midpoint for 300 sq ft there is $18,700, which is 0% more than Providence ($18,600). Wage and materials indexes both feed that gap.

+How much of the bill is labor in Providence?

About 62% at the midpoint, or $11,500 out of $18,600. Materials are 38% and permits 1%. Nationally, labor is 60%.

+What would 16x20 (320 sq ft) cost in Providence?

$13,200 to $26,500. Pick a different size in the estimator above to get your own number.

+Does composite deck need a permit in Providence?

Often, but rules are set by your city or county building office, so call before you hire. Budget $50 to $150 for fees in the Providence area (our national range of $50 to $150 scaled by the local price level).

+Is Providence expensive for composite deck compared with the rest of Rhode Island?

Providence is 1% above the Rhode Island statewide estimate ($18,400 at the midpoint).

+What do carpenters earn in Providence?

The BLS median is $29.76 an hour in the Providence area, compared with $29.12 nationally. The 25th to 75th percentile range is $26.71 to $38.38.

+What do basic and premium composite deck work cost in Providence?

For 300 sq ft, basic work runs $12,400 to $17,400 and premium work $19,900 to $24,900. Basic means: entry-level composite boards, low deck, simple shape. Premium means: premium capped or PVC boards, multi-level, hidden fasteners.

+When is the best time to build a composite deck in Providence?

Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are March through November. May and July are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.

+What does "add a deck railing" add in Providence?

$1,850 to $5,500 for 300 sq ft, from a national range scaled by the local wage and goods indexes.

Composite deck near Providence

Composite deck: all pricesComposite deck in Rhode IslandAll projects in ProvidenceRhode Island cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.