Asphalt driveway cost in Bridgeport, CT
Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.
- Typical range (600 sq ft)
- $3,400 – $8,500
- Per sq ft
- $5.55 – $14
- before permit
- Versus US midpoint
- +14%
- US $5,250
- Rank of 300 metros
- #38
- 1 = most expensive
If you want to pave a driveway in Bridgeport, plan on $3,400 to $8,500 for 600 sq ft, all in. Per sq ft, that is $5.55 to $14 for materials and labor, with the permit on top. The local midpoint runs 14% higher than the national one. Paving, surfacing and tamping equipment operators earn a median of $37.25 an hour in the Bridgeport area, 45% above the US median of $25.64.
Estimate your asphalt driveway cost
Pick a size, a quality level and where you live. Prices update as you type.
Estimated cost for 600 sq ft in Bridgeport, CT, standard level
$4,900 to $6,950
About $8 to $11.50 per sq ft before permits. Labor is about 49% of the bill.
| Part | Low | High |
|---|---|---|
| Materials | $2,500 | $3,300 |
| Labor | $2,300 | $3,500 |
| Permits and fees | $100 | $170 |
| Total | $4,900 | $6,950 |
Cost breakdown for 600 sq ft in Bridgeport, CT
| Part of the job | Low | Midpoint | High | Share |
|---|---|---|---|---|
| Materials | $1,950 | $2,900 | $3,850 | 49% |
| Labor | $1,400 | $2,900 | $4,450 | 49% |
| Permits and fees | $55 | $130 | $210 | 2% |
| Total | $3,400 | $5,950 | $8,500 | 100% |
Where the Bridgeport price comes from
The wage side of the estimate leans on paving, surfacing and tamping equipment operators, who do 40% of the hours on a typical job. Their local median is $37.25 an hour. Add the other trades involved and the blended wage index for Bridgeport is 1.37 (US = 1.00), which puts labor at 49% of the total. BLS does not publish this trade for the metro, so we used the Connecticut statewide median.
On the materials line, the BEA goods price index for the Bridgeport metro is 97.3 (US = 100). The midpoint materials bill for 600 sq ft comes to $2,900, compared with $2,950 at national prices. Permit and inspection fees are scaled by the broader index (106.9) and land at $55 to $210.
Data note: 40% of the labor weighting for this project uses a statewide median because BLS has no published metro figure for that trade in Bridgeport. The wage table below marks each row.
How Bridgeport compares
Same job, same size (600 sq ft), priced for the nearest metros. New York is the priciest of the group at $6,250. Poughkeepsie is the cheapest at $5,850.
| Area | Range | Midpoint | vs. here |
|---|---|---|---|
| Bridgeport, CTthis page | $3,400 – $8,500 | $5,950 | |
| Waterbury, CT25 miles | $3,350 – $8,400 | $5,850 | −1% |
| New Haven, CT30 miles | $3,350 – $8,500 | $5,950 | level |
| Poughkeepsie, NY40 miles | $3,400 – $8,250 | $5,850 | −2% |
| New York, NY40 miles | $3,600 – $8,900 | $6,250 | +5% |
| Hartford, CT55 miles | $3,350 – $8,350 | $5,850 | −2% |
| Connecticut (statewide) | $3,350 – $8,450 | $5,900 | −1% |
| United States | $3,050 – $7,400 | $5,250 | −12% |
Across 300 US metros, Bridgeport comes in at #38 from the top. The priciest is Kahului, HI at $7,650; the cheapest is Fort Smith, AR at $4,450 (midpoints, 600 sq ft). Statewide, Bridgeport is 1% above the Connecticut figure.
Other Connecticut metros
| Metro | Size | Range | Midpoint | vs. here |
|---|---|---|---|---|
| Hartford, CT | 599,770 jobs | $3,350 – $8,350 | $5,850 | −2% |
| New Haven, CT | 281,410 jobs | $3,350 – $8,500 | $5,950 | level |
| Waterbury, CT | 160,710 jobs | $3,350 – $8,400 | $5,850 | −1% |
| Norwich, CT | 126,450 jobs | $3,250 – $8,100 | $5,650 | −5% |
Cities with a workforce like Bridgeport's
Big cities and small ones price differently, so here is Bridgeport against the 4 metros with the closest total employment.
| Metro | Size | Range | Midpoint | vs. here |
|---|---|---|---|---|
| Albuquerque, NM | 404,700 jobs | $2,800 – $6,750 | $4,800 | −19% |
| Des Moines, IA | 404,130 jobs | $3,000 – $7,450 | $5,200 | −12% |
| Madison, WI | 408,070 jobs | $3,400 – $8,700 | $6,050 | +2% |
| Columbia, SC | 394,200 jobs | $2,850 – $6,800 | $4,800 | −19% |
Bridgeport: what basic, standard and premium work costs
Three bands are cut from the same cited range and localized for Bridgeport wages and prices. They overlap on purpose: a good standard job and a modest premium job can cost the same. The grid below prices the same bands at 4 common sizes.
Basic
$3,400 to $5,450
New topcoat over a sound base, flat lot
Standard
$4,900 to $6,950
Full new driveway: base, 2-3 in of hot mix, edging
Premium
$6,450 to $8,500
Full tear-out and rebuild, drainage work, heavy-duty depth
| Size | Basic | Standard | Premium |
|---|---|---|---|
| 1-car (12x20), 240 sq ft | $1,400 – $2,250 | $2,050 – $2,900 | $2,650 – $3,550 |
| 20x20 (400 sq ft) | $2,250 – $3,650 | $3,300 – $4,700 | $4,350 – $5,750 |
| 2-car (20x30), 600 sq ft | $3,400 – $5,450 | $4,900 – $6,950 | $6,450 – $8,500 |
| long rural (10x100), 1,000 sq ft | $5,600 – $8,950 | $8,100 – $11,500 | $10,700 – $14,000 |
Bridgeport labor market for asphalt driveway
Wages are the part of this estimate that changes most from town to town. 3 trades carry the job here, and each is compared with its US median. The weighted result for Bridgeport is 1.37 times the national level.
Paving, surfacing and tamping equipment operators (47-2071) carry 40% of the labor weighting. BLS does not publish this trade for the Bridgeport metro, so we used the Connecticut statewide median: $37.25 an hour against $25.64 for the US. The middle half of them earn between $29.44 and $46.23 an hour.
Construction laborers (47-2061), 30% of the weighting: a median of $28.38 an hour, 25% above the US median of $22.66. The middle half of them earn between $23.18 and $35.00 an hour. About 1,930 work in the metro. That is 47.8 per 10,000 jobs, compared with 70.5 nationally, so expect fewer local crews to bid.
For operating engineers and other construction equipment operators (47-2073, weighted 30%) the local median is $39.54 an hour, which is 37% above the national $28.78. The middle half of them earn between $34.81 and $50.60 an hour. BLS counts 600 of them working in the area, 14.8 for every 10,000 jobs (US: 30.7), so the local bench is thinner than average.
Quotes come from real crews, not medians. If the paving, surfacing and tamping equipment operators on your job are paid at the 75th percentile ($46.23 an hour) instead of the median, the labor line grows by about $300. At the 25th percentile ($29.44) it shrinks by about $260. The total moves by 5.0% or 4.4%, so wages alone rarely explain a quote that is far outside our range.
For context on the local economy, BLS counts 404,180 jobs in the Bridgeport-Stamford-Danbury area. That makes it the 63rd largest of the 300 metros we cover, with 0.26% of US employment.
| Trade | Weight | 25th pct | Median | 75th pct | US median | Ratio | Level used |
|---|---|---|---|---|---|---|---|
| Paving, surfacing and tamping equipment operators (47-2071) | 40% | $29.44 | $37.25 | $46.23 | $25.64 | 1.45 | state |
| Construction laborers (47-2061) | 30% | $23.18 | $28.38 | $35.00 | $22.66 | 1.25 | metro |
| Operating engineers and other construction equipment operators (47-2073) | 30% | $34.81 | $39.54 | $50.60 | $28.78 | 1.37 | metro |
| Blended | 100% | 1.37 | |||||
Climate in Bridgeport: timing your asphalt driveway job
We use NOAA's 1991-2020 climate normals for Bridgeport Sikorsky Mem Ap (5 miles from the city center). These are 30-year monthly averages, not forecasts.
April through November is the stretch where digging, grading and setting material in the ground runs into the fewest weather problems in Bridgeport (8 of 12 months). January, February, March and December have an average overnight low at or below freezing (32°F).
In January, February, March and December the average low is at or below freezing, which means frozen ground and slower digging, compaction and sod or stone placement. NOAA counts about 92 days a year with a low at or below 32°F at this station.
Bridgeport gets about 44 inches of precipitation in a normal year, including roughly 34 inches of snow. The wettest months are March, April and August (4.2 inches in April). Inside the workable window, July and November are the driest, at 3.3 and 3.1 inches. The station averages about 9 days a year at 90°F or above.
Does the season change the price? Probably, but we do not have a sourced seasonal price curve, so the estimator shows a year-round figure and does not adjust by month. When you collect quotes, ask whether scheduling in a slower month gets a better rate.
| Month | Avg high °F | Avg low °F | Precip (in) | For this job |
|---|---|---|---|---|
| Jan | 38 | 24 | 3.2 | Cold |
| Feb | 41 | 26 | 3.1 | Cold |
| Mar | 47 | 32 | 4.1 | Cold |
| Apr | 58 | 42 | 4.2 | Workable |
| May | 68 | 52 | 3.6 | Workable |
| Jun | 78 | 62 | 3.8 | Workable |
| Jul | 83 | 68 | 3.3 | Workable |
| Aug | 82 | 67 | 4.0 | Workable |
| Sep | 75 | 60 | 4.0 | Workable |
| Oct | 64 | 48 | 3.8 | Workable |
| Nov | 54 | 38 | 3.1 | Workable |
| Dec | 44 | 30 | 4.0 | Cold |
Asphalt driveway: what moves the price in Bridgeport
New versus overlay
Resurfacing an existing driveway runs $3-$7 per sq ft; a full new driveway runs $5-$12+ (HomeGuide). Tearing out and replacing one is higher still.
Base work
Four to eight inches of compacted aggregate under the asphalt is where cheap quotes cut corners. Base typically runs $1-$3 per sq ft.
Small jobs cost more per foot
Paving crews move a paver, roller and trucks to your address, so a 400 sq ft driveway carries more mobilization per square foot than a 1,000 sq ft one.
Optional extras in Bridgeport
Extras are quoted nationally and then scaled to Bridgeport by the average of the local wage index (1.37) and goods index (0.97), a factor of 1.17. Tick any of them in the estimator above to add them to your total. Treat these as planning figures: an add-on touches different trades than the main job, so the scaling is an approximation.
| Add-on | Local range |
|---|---|
| Add a sealcoat | $700 – $1,400 |
Related projects, priced for Bridgeport
Because every project leans on different trades, Bridgeport's wage level does not move all prices equally. Against the US midpoint, gravel driveway runs +14% and concrete slab +5%.
| Project | Size | Range | vs. US |
|---|---|---|---|
| Concrete driveway | 600 sq ft | $3,900 – $10,100 | +9% |
| Gravel driveway | 1,000 sq ft | $2,900 – $11,600 | +14% |
| Paver patio | 300 sq ft | $3,250 – $5,900 | +8% |
| French drain | 60 linear ft | $670 – $2,350 | +11% |
| Concrete slab | 400 sq ft | $2,600 – $5,450 | +5% |
| Concrete patio | 300 sq ft | $1,300 – $4,300 | +7% |
Get 3 local quotes
Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $4,900 to $6,950 for Bridgeport, CT is attached.
Detailed asphalt driveway report for Bridgeport, CT, $9
Multi-page report for Bridgeport, CT: low, typical and high cost, a line-item breakdown of materials and labor by trade, permit notes, the best months to schedule, a quote comparison sheet, red flags, questions for contractors, checklists and every source. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.
Asphalt driveway in Bridgeport: your questions
+How much does it cost to pave a driveway in Bridgeport?
For 600 sq ft, expect $3,400 to $8,500 in the Bridgeport area. A standard-spec job lands at $4,900 to $6,950. Small jobs usually cost more per sq ft and large ones less.
+What is the price per sq ft for asphalt driveway in Bridgeport?
About $5.55 to $14 per sq ft for materials and labor, plus $55 to $210 for the permit if one is needed. The US range is $5 to $12.
+Is asphalt driveway cheaper in Bridgeport or Waterbury?
Waterbury is 25 miles away. The midpoint for 600 sq ft there is $5,850, which is 1% less than Bridgeport ($5,950). Wage and materials indexes both feed that gap.
+How much of the bill is labor in Bridgeport?
About 49% at the midpoint, or $2,900 out of $5,950. Materials are 49% and permits 2%. Nationally, labor is 41%.
+What would 2-car (20x30), 600 sq ft cost in Bridgeport?
$3,400 to $8,500. Pick a different size in the estimator above to get your own number.
+Does asphalt driveway need a permit in Bridgeport?
Often, but rules are set by your city or county building office, so call before you hire. Budget $55 to $210 for fees in the Bridgeport area (our national range of $50 to $200 scaled by the local price level).
+Is Bridgeport expensive for asphalt driveway compared with the rest of Connecticut?
Bridgeport is 1% above the Connecticut statewide estimate ($5,900 at the midpoint). We cover 5 metros in Connecticut; see the state page to compare them.
+What do paving, surfacing and tamping equipment operators earn in Bridgeport?
BLS has no published metro figure here, so we use the statewide median of $37.25 an hour, compared with $25.64 nationally. The 25th to 75th percentile range is $29.44 to $46.23.
+What do basic and premium asphalt driveway work cost in Bridgeport?
For 600 sq ft, basic work runs $3,400 to $5,450 and premium work $6,450 to $8,500. Basic means: new topcoat over a sound base, flat lot. Premium means: full tear-out and rebuild, drainage work, heavy-duty depth.
+When is the best time to pave a driveway in Bridgeport?
Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are April through November. July and November are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.
+What does "add a sealcoat" add in Bridgeport?
$700 to $1,400 for 600 sq ft, from a national range scaled by the local wage and goods indexes.
Asphalt driveway near Bridgeport
Where these numbers come from
Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.
- HomeGuide: How Much Does Paving an Asphalt Driveway Cost? (2026) (accessed November 4, 2026)
- PaveGauge: Asphalt Driveway Cost (2026): Price by Size (accessed November 4, 2026)
- HomeGuide: 2026 Building Permit Costs | Fees & Cost Calculator (accessed November 4, 2026)
- BLS Occupational Employment and Wage Statistics, May 2025
- BEA Regional Price Parities, 2024
- NOAA NCEI U.S. Climate Normals, 1991-2020
Note on derived figures: Materials = hot-mix asphalt ($2.30-$3.60/sq ft at 3 in) plus aggregate base ($1-$3/sq ft) from PaveGauge's component table.