Sod installation cost in Green Bay, WI
Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.
- Typical range (1,500 sq ft)
- $1,450 – $3,250
- Per sq ft
- $1 – $1.95
- before permit
- Versus US midpoint
- −2%
- US $2,400
- Rank of 300 metros
- #124
- 1 = most expensive
A new sod lawn in Green Bay, WI usually costs $1,450 to $3,250 for 1,500 sq ft. That works out to about $1 to $1.95 per sq ft before permits. That is within a few percent of the national midpoint, so there is little local premium or discount. Building materials run about 6% below the US average here (BEA goods price index 93.8).
Estimate your sod installation cost
Pick a size, a quality level and where you live. Prices update as you type.
Estimated cost for 1,500 sq ft in Green Bay, WI, standard level
$2,000 to $2,700
About $1.30 to $1.65 per sq ft before permits. Labor is about 49% of the bill.
| Part | Low | High |
|---|---|---|
| Materials | $910 | $1,200 |
| Labor | $1,000 | $1,300 |
| Permits and fees | $85 | $200 |
| Total | $2,000 | $2,700 |
Cost breakdown for 1,500 sq ft in Green Bay, WI
| Part of the job | Low | Midpoint | High | Share |
|---|---|---|---|---|
| Materials | $700 | $1,050 | $1,400 | 45% |
| Labor | $770 | $1,150 | $1,550 | 49% |
| Permits and fees | $0 | $140 | $280 | 6% |
| Total | $1,450 | $2,350 | $3,250 | 100% |
What is behind the Green Bay number
Labor is 49% of the midpoint bill here, against 47% nationally. The mix of trades behind this job is landscaping and groundskeeping workers (80%), construction laborers (20%). We weight each trade's local median wage by that share and compare it with the national median. In Green Bay the blended ratio comes out at 1.03.
Materials are scaled with BEA's regional price parity for goods. Green Bay is at 93.8 against 100 for the US, so a materials line of $1,150 nationally becomes $1,050 here (midpoint, 1,500 sq ft). Permits follow the all-items index of 93.1: $0 to $280.
Is Green Bay cheap or dear? The local comparison
Same job, same size (1,500 sq ft), priced for the nearest metros. Appleton is the priciest of the group at $2,500. Muskegon is the cheapest at $2,250.
| Area | Range | Midpoint | vs. here |
|---|---|---|---|
| Green Bay, WIthis page | $1,450 – $3,250 | $2,350 | |
| Appleton, WI20 miles | $1,550 – $3,400 | $2,500 | +6% |
| Oshkosh, WI45 miles | $1,450 – $3,200 | $2,350 | −1% |
| Sheboygan, WI50 miles | $1,500 – $3,300 | $2,400 | +2% |
| Wausau, WI90 miles | $1,450 – $3,200 | $2,300 | −1% |
| Muskegon, MI105 miles | $1,400 – $3,100 | $2,250 | −4% |
| Wisconsin (statewide) | $1,500 – $3,300 | $2,400 | +3% |
| United States | $1,500 – $3,300 | $2,400 | +2% |
Out of the 300 metros we cover, Green Bay ranks #124 for the cost of this job (#1 is the most expensive). Statewide, Green Bay is 3% below the Wisconsin figure.
Elsewhere in Wisconsin
| Metro | Size | Range | Midpoint | vs. here |
|---|---|---|---|---|
| Milwaukee, WI | 820,780 jobs | $1,550 – $3,450 | $2,500 | +6% |
| Madison, WI | 408,070 jobs | $1,550 – $3,400 | $2,500 | +6% |
| Appleton, WI | 124,230 jobs | $1,550 – $3,400 | $2,500 | +6% |
| Oshkosh, WI | 93,750 jobs | $1,450 – $3,200 | $2,350 | −1% |
| Eau Claire, WI | 86,060 jobs | $1,500 – $3,250 | $2,350 | level |
| La Crosse, WI | 84,380 jobs | $1,450 – $3,200 | $2,350 | level |
Metros of a similar size
Big cities and small ones price differently, so here is Green Bay against the 4 metros with the closest total employment.
| Metro | Size | Range | Midpoint | vs. here |
|---|---|---|---|---|
| Reading, PA | 174,670 jobs | $1,500 – $3,300 | $2,400 | +2% |
| Naples, FL | 173,880 jobs | $1,450 – $3,250 | $2,350 | level |
| Anchorage, AK | 177,050 jobs | $1,700 – $3,750 | $2,700 | +16% |
| Mobile, AL | 172,550 jobs | $1,400 – $3,050 | $2,200 | −6% |
Specs and site conditions that change a Green Bay bid
Sod type
Sod alone costs $0.30-$0.80 per sq ft, or $130-$360 per pallet; delivery is $50-$250 per load.
Site prep
The cost listed here assumes leveled, cleared ground. Grading and soil amendments are extra.
Permit
Sodding permits cost $40-$300 where required, mostly for large lawns or those next to a public road.
Planning more than one job in Green Bay?
Jobs that often go together with sod lawn are priced below at their usual sizes, using the same Green Bay wage and price inputs. Compared with national midpoints, French drain comes out highest (+15%) and retaining wall lowest (+4%); the gap comes from the trades each job uses.
| Project | Size | Range | vs. US |
|---|---|---|---|
| French drain | 60 linear ft | $690 – $2,400 | +15% |
| Sprinkler system | 4,000 sq ft of lawn | $4,500 – $11,200 | +12% |
| Retaining wall | 200 sq ft of wall face | $7,600 – $13,800 | +4% |
| Gravel driveway | 1,000 sq ft | $2,700 – $11,000 | +8% |
| Inground pool | 450 sq ft | $39,100 – $122,000 | +8% |
Cost by quality level and size in Green Bay
The cited range is split into basic, standard and premium bands, then scaled to Green Bay. Bands overlap, because plenty of standard jobs cost as much as a light premium one. Sizes run from small yard (1,000 sq ft) to large yard (4,000 sq ft).
Basic
$1,450 to $2,200
Basic grass on cleared, level ground
Standard
$2,000 to $2,700
Better grass type with some grading
Premium
$2,550 to $3,250
Premium sod, soil work, difficult slopes
| Size | Basic | Standard | Premium |
|---|---|---|---|
| small yard (1,000 sq ft) | $980 – $1,500 | $1,350 – $1,850 | $1,750 – $2,250 |
| average yard (1,500 sq ft) | $1,450 – $2,200 | $2,000 – $2,700 | $2,550 – $3,250 |
| large yard (4,000 sq ft) | $3,950 – $5,600 | $5,200 – $6,900 | $6,450 – $8,150 |
What local crews earn in Green Bay
The labor line is built from BLS wage data, one trade at a time. This job draws on 2 trades. We compare each trade's local median with the US median, weight the ratios by how much of the job each trade does, and apply the blend to the national labor cost. For Green Bay the blend is 1.03.
Landscaping and groundskeeping workers (37-3011), 80% of the weighting: a median of $18.72 an hour, in line with the US median of $18.82. The middle half of them earn between $16.53 and $21.91 an hour. About 930 work in the metro. That is 53.3 per 10,000 jobs, compared with 61.3 nationally, so the supply of crews looks typical.
For construction laborers (47-2061, weighted 20%) the local median is $26.39 an hour, which is 16% above the national $22.66. The middle half of them earn between $22.53 and $31.63 an hour. BLS counts 1,160 of them working in the area, 66.5 for every 10,000 jobs (US: 70.5), so the local bench is about average.
A quick sensitivity check: moving the lead trade (landscaping and groundskeeping workers) from the median to the 75th percentile wage adds about $150 to the midpoint estimate; the 25th percentile takes off about $100. That is a swing of roughly 4.5% to 6.5% of the total, which is useful for judging whether a bid reflects wages or something else, such as scope or margin.
Green Bay has 174,550 jobs in total (BLS, May 2025), ranking 133rd by size among the 300 metros on this site.
| Trade | Weight | 25th pct | Median | 75th pct | US median | Ratio | Level used |
|---|---|---|---|---|---|---|---|
| Landscaping and groundskeeping workers (37-3011) | 80% | $16.53 | $18.72 | $21.91 | $18.82 | 0.99 | metro |
| Construction laborers (47-2061) | 20% | $22.53 | $26.39 | $31.63 | $22.66 | 1.16 | metro |
| Blended | 100% | 1.03 | |||||
Green Bay weather and the sod installation calendar
Climate numbers on this page come from NOAA's 1991-2020 U.S. Climate Normals at the nearest suitable station, Green Bay (5 miles from the city center). They are 30-year averages, so any one year can run hotter, colder or wetter.
For digging, grading and setting material in the ground, the comfortable months in Green Bay are April through October: 7 of 12. Outside them, January, February, March, November and December have an average overnight low at or below freezing (32°F).
In January, February, March, November and December the average low is at or below freezing, which means frozen ground and slower digging, compaction and sod or stone placement. NOAA counts about 152 days a year with a low at or below 32°F at this station.
Green Bay gets about 32 inches of precipitation in a normal year, including roughly 56 inches of snow. The wettest months are June, July and August (4.1 inches in June). Inside the workable window, April and October are the driest, at 3.0 and 2.7 inches. The station averages about 6 days a year at 90°F or above.
We do not adjust the estimate by month, because we have no reliable published data on seasonal pricing. It is still worth asking contractors whether an off-peak start date changes their bid.
| Month | Avg high °F | Avg low °F | Precip (in) | For this job |
|---|---|---|---|---|
| Jan | 26 | 11 | 1.4 | Cold |
| Feb | 29 | 13 | 1.2 | Cold |
| Mar | 40 | 24 | 2.0 | Cold |
| Apr | 54 | 35 | 3.0 | Workable |
| May | 67 | 46 | 3.4 | Workable |
| Jun | 77 | 56 | 4.1 | Workable |
| Jul | 81 | 60 | 3.6 | Workable |
| Aug | 79 | 58 | 3.4 | Workable |
| Sep | 72 | 50 | 3.2 | Workable |
| Oct | 58 | 40 | 2.7 | Workable |
| Nov | 44 | 29 | 2.0 | Cold |
| Dec | 31 | 18 | 1.8 | Cold |
Get 3 local quotes
Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $2,000 to $2,700 for Green Bay, WI is attached.
Take this estimate with you: PDF report, $9
The report lays out the sod installation numbers for Green Bay, WI line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.
Sod installation in Green Bay: your questions
+How much does it cost to lay sod in Green Bay?
For 1,500 sq ft, expect $1,450 to $3,250 in the Green Bay area. A standard-spec job lands at $2,000 to $2,700. Small jobs usually cost more per sq ft and large ones less.
+What is the price per sq ft for sod lawn in Green Bay?
About $1 to $1.95 per sq ft for materials and labor, plus $0 to $280 for the permit if one is needed. The US range is $1 to $2.
+Is sod lawn cheaper in Green Bay or Appleton?
Appleton is 20 miles away. The midpoint for 1,500 sq ft there is $2,500, which is 6% more than Green Bay ($2,350). Wage and materials indexes both feed that gap.
+How much of the bill is labor in Green Bay?
About 49% at the midpoint, or $1,150 out of $2,350. Materials are 45% and permits 6%. Nationally, labor is 47%.
+What would average yard (1,500 sq ft) cost in Green Bay?
$1,450 to $3,250. Pick a different size in the estimator above to get your own number.
+Does sod lawn need a permit in Green Bay?
Often, but rules are set by your city or county building office, so call before you hire. Budget $0 to $280 for fees in the Green Bay area (our national range of $0 to $300 scaled by the local price level).
+Is Green Bay expensive for sod lawn compared with the rest of Wisconsin?
Green Bay is 3% below the Wisconsin statewide estimate ($2,400 at the midpoint). We cover 12 metros in Wisconsin; see the state page to compare them.
+What do landscaping and groundskeeping workers earn in Green Bay?
The BLS median is $18.72 an hour in the Green Bay area, compared with $18.82 nationally. The 25th to 75th percentile range is $16.53 to $21.91.
+What do basic and premium sod lawn work cost in Green Bay?
For 1,500 sq ft, basic work runs $1,450 to $2,200 and premium work $2,550 to $3,250. Basic means: basic grass on cleared, level ground. Premium means: premium sod, soil work, difficult slopes.
+When is the best time to lay sod in Green Bay?
Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are April through October. April and October are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.
Sod installation near Green Bay
Where these numbers come from
Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.