Skip to content
CostLocal

Sod installation cost in Auburn, AL

Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.

Typical range (1,500 sq ft)
$1,350 – $3,000
Per sq ft
$0.90 – $1.85
before permit
Versus US midpoint
−9%
US $2,400
Rank of 300 metros
#273
1 = most expensive

A new sod lawn in Auburn, AL usually costs $1,350 to $3,000 for 1,500 sq ft. That works out to about $0.90 to $1.85 per sq ft before permits. Compared with the national midpoint that is $210 less. Landscaping and groundskeeping workers earn a median of $16.80 an hour in the Auburn area, 11% below the US median of $18.82.

Estimate your sod installation cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

Better grass type with some grading

Estimated cost for 1,500 sq ft in Auburn, AL, standard level

$1,850 to $2,500

About $1.20 to $1.55 per sq ft before permits. Labor is about 45% of the bill.

Cost breakdown
PartLowHigh
Materials$940$1,250
Labor$850$1,100
Permits and fees$80$180
Total$1,850$2,500
Save and get a PDF report

Cost breakdown for 1,500 sq ft in Auburn, AL

Part of the jobLowMidpointHighShare
Materials$720$1,100$1,45049%
Labor$650$980$1,30045%
Permits and fees$0$130$2606%
Total$1,350$2,200$3,000100%

Why Auburn prices look the way they do

Labor is 45% of the midpoint bill here, against 47% nationally. The mix of trades behind this job is landscaping and groundskeeping workers (80%), construction laborers (20%). We weight each trade's local median wage by that share and compare it with the national median. In Auburn the blended ratio comes out at 0.87.

Materials are scaled with BEA's regional price parity for goods. Auburn is at 96.4 against 100 for the US, so a materials line of $1,150 nationally becomes $1,100 here (midpoint, 1,500 sq ft). Permits follow the all-items index of 87.9: $0 to $260.

Related projects, priced for Auburn

Jobs that often go together with sod lawn are priced below at their usual sizes, using the same Auburn wage and price inputs. Compared with national midpoints, retaining wall comes out highest (−12%) and gravel driveway lowest (−13%); the gap comes from the trades each job uses.

Related projects with local prices
ProjectSizeRangevs. US
French drain60 linear ft$530 – $1,850−12%
Sprinkler system4,000 sq ft of lawn$3,500 – $8,700−13%
Retaining wall200 sq ft of wall face$6,050 – $12,000−12%
Gravel driveway1,000 sq ft$2,150 – $8,850−13%
Inground pool450 sq ft$31,400 – $98,100−13%

Auburn weather and the sod installation calendar

Climate numbers on this page come from NOAA's 1991-2020 U.S. Climate Normals at the nearest suitable station, Auburn No.2 (5 miles from the city center). They are 30-year averages, so any one year can run hotter, colder or wetter.

Weather is not a serious constraint for digging, grading and setting material in the ground in Auburn: no month in the averages is cold enough (an average overnight low at or below freezing (32°F)) or hot enough (an average daytime high of 90°F or more) to rule it out, so the workable window is all year.

Auburn gets about 56 inches of precipitation in a normal year. The wettest months are March, June and December (5.7 inches in March). The station averages about 49 days a year at 90°F or above.

We do not adjust the estimate by month, because we have no reliable published data on seasonal pricing. It is still worth asking contractors whether an off-peak start date changes their bid.

Monthly normals, Auburn No.2 (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan56355.3Workable
Feb61395.1Workable
Mar68455.7Workable
Apr75514.8Workable
May81604.0Workable
Jun87685.7Workable
Jul89714.8Workable
Aug88714.3Workable
Sep84663.5Workable
Oct75543.4Workable
Nov65434.2Workable
Dec58385.6Workable

What local crews earn in Auburn

The labor line is built from BLS wage data, one trade at a time. This job draws on 2 trades. We compare each trade's local median with the US median, weight the ratios by how much of the job each trade does, and apply the blend to the national labor cost. For Auburn the blend is 0.87.

Landscaping and groundskeeping workers (37-3011), 80% of the weighting: a median of $16.80 an hour, 11% below the US median of $18.82. The middle half of them earn between $14.07 and $17.59 an hour. About 540 work in the metro. That is 74.3 per 10,000 jobs, compared with 61.3 nationally, which suggests plenty of local crews to bid.

For construction laborers (47-2061, weighted 20%) the local median is $17.36 an hour, which is 23% below the national $22.66. The middle half of them earn between $13.70 and $21.30 an hour. BLS counts 670 of them working in the area, 92.1 for every 10,000 jobs (US: 70.5), so the local bench is deeper than average.

A quick sensitivity check: moving the lead trade (landscaping and groundskeeping workers) from the median to the 75th percentile wage adds about $40 to the midpoint estimate; the 25th percentile takes off about $130. That is a swing of roughly 6.0% to 1.7% of the total, which is useful for judging whether a bid reflects wages or something else, such as scope or margin.

Auburn-Opelika has 72,710 jobs in total (BLS, May 2025), ranking 252nd by size among the 300 metros on this site.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Landscaping and groundskeeping workers (37-3011)80%$14.07$16.80$17.59$18.820.89metro
Construction laborers (47-2061)20%$13.70$17.36$21.30$22.660.77metro
Blended100%0.87

Auburn: what basic, standard and premium work costs

The cited range is split into basic, standard and premium bands, then scaled to Auburn. Bands overlap, because plenty of standard jobs cost as much as a light premium one. Sizes run from small yard (1,000 sq ft) to large yard (4,000 sq ft).

Basic

$1,350 to $2,050

Basic grass on cleared, level ground

Standard

$1,850 to $2,500

Better grass type with some grading

Premium

$2,350 to $3,000

Premium sod, soil work, difficult slopes

Cost by size and quality level
SizeBasicStandardPremium
small yard (1,000 sq ft)$920 – $1,400$1,250 – $1,750$1,600 – $2,100
average yard (1,500 sq ft)$1,350 – $2,050$1,850 – $2,500$2,350 – $3,000
large yard (4,000 sq ft)$3,650 – $5,250$4,850 – $6,400$6,000 – $7,600

Auburn against nearby metros and the rest of Alabama

Contractors rarely work more than an hour or two from home, so the neighboring metros set a rough ceiling and floor for your quotes. Midpoints for 1,500 sq ft range from $2,100 to $2,250 across Auburn and its five closest metros.

Comparison with nearby areas
AreaRangeMidpointvs. here
Auburn, ALthis page$1,350 – $3,000$2,200
Columbus, GA40 miles$1,350 – $3,000$2,200−1%
Montgomery, AL50 miles$1,400 – $3,050$2,200+1%
Dothan, AL85 miles$1,350 – $2,900$2,150−3%
Birmingham, AL100 miles$1,400 – $3,100$2,250+2%
Albany, GA100 miles$1,300 – $2,850$2,100−5%
Alabama (statewide)$1,400 – $3,050$2,200+1%
United States$1,500 – $3,300$2,400+9%

Out of the 300 metros we cover, Auburn ranks #273 for the cost of this job (#1 is the most expensive). Statewide, Auburn is 1% below the Alabama figure.

Elsewhere in Alabama

Alabama metros compared with Auburn
MetroSizeRangeMidpointvs. here
Birmingham, AL520,290 jobs$1,400 – $3,100$2,250+2%
Huntsville, AL266,650 jobs$1,400 – $3,100$2,250+3%
Mobile, AL172,550 jobs$1,400 – $3,050$2,200+1%
Montgomery, AL165,550 jobs$1,400 – $3,050$2,200+1%
Tuscaloosa, AL108,460 jobs$1,400 – $3,050$2,200+1%
Daphne, AL87,120 jobs$1,400 – $3,100$2,250+2%

Metros of a similar size

Big cities and small ones price differently, so here is Auburn against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
Bloomington, IN73,240 jobs$1,450 – $3,200$2,300+6%
Prescott Valley, AZ72,300 jobs$1,450 – $3,200$2,350+6%
Kahului, HI73,750 jobs$1,850 – $4,000$2,900+33%
Coeur d'Alene, ID72,280 jobs$1,500 – $3,250$2,350+8%

Specs and site conditions that change a Auburn bid

  • Old grass removal

    Removing an old lawn first adds $0.50-$2.00 per sq ft, and a full remove-and-resod runs $1.50-$4.00 per sq ft (HomeGuide).

  • Sod type

    Sod alone costs $0.30-$0.80 per sq ft, or $130-$360 per pallet; delivery is $50-$250 per load.

  • Site prep

    The cost listed here assumes leveled, cleared ground. Grading and soil amendments are extra.

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $1,850 to $2,500 for Auburn, AL is attached.

Take this estimate with you: PDF report, $9

Multi-page report for Auburn, AL: low, typical and high cost, a line-item breakdown of materials and labor by trade, permit notes, the best months to schedule, a quote comparison sheet, red flags, questions for contractors, checklists and every source. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Sod installation in Auburn: your questions

+How much does it cost to lay sod in Auburn?

For 1,500 sq ft, expect $1,350 to $3,000 in the Auburn area. A standard-spec job lands at $1,850 to $2,500. Small jobs usually cost more per sq ft and large ones less.

+What is the price per sq ft for sod lawn in Auburn?

About $0.90 to $1.85 per sq ft for materials and labor, plus $0 to $260 for the permit if one is needed. The US range is $1 to $2.

+Is sod lawn cheaper in Auburn or Columbus?

Columbus is 40 miles away. The midpoint for 1,500 sq ft there is $2,200, which is 1% less than Auburn ($2,200). Wage and materials indexes both feed that gap.

+How much of the bill is labor in Auburn?

About 45% at the midpoint, or $980 out of $2,200. Materials are 49% and permits 6%. Nationally, labor is 47%.

+What would average yard (1,500 sq ft) cost in Auburn?

$1,350 to $3,000. Pick a different size in the estimator above to get your own number.

+Does sod lawn need a permit in Auburn?

Often, but rules are set by your city or county building office, so call before you hire. Budget $0 to $260 for fees in the Auburn area (our national range of $0 to $300 scaled by the local price level).

+Is Auburn expensive for sod lawn compared with the rest of Alabama?

Auburn is 1% below the Alabama statewide estimate ($2,200 at the midpoint). We cover 9 metros in Alabama; see the state page to compare them.

+What do landscaping and groundskeeping workers earn in Auburn?

The BLS median is $16.80 an hour in the Auburn area, compared with $18.82 nationally. The 25th to 75th percentile range is $14.07 to $17.59.

+What do basic and premium sod lawn work cost in Auburn?

For 1,500 sq ft, basic work runs $1,350 to $2,050 and premium work $2,350 to $3,000. Basic means: basic grass on cleared, level ground. Premium means: premium sod, soil work, difficult slopes.

+Is there a bad season to lay sod in Auburn?

Not from a temperature point of view. NOAA's 1991-2020 normals show no month with a freezing-level overnight low or a 90°F-plus average high, so timing is mostly about contractor availability and rain.

Sod installation near Auburn

Sod installation: all pricesSod installation in AlabamaAll projects in AuburnAlabama cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.